ML19254D421

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-37 on 790902-04.No Noncompliance Noted
ML19254D421
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/18/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19254D422 List:
References
NUDOCS 7910250477
Download: ML19254D421 (2)


See also: IR 05000302/1979037

Text

fY

o

o

UNITED STATES

dC O A

~,

-

8

NUCLEAR REGULATORY COMMISSION

n

g

-r

REGION il

o

101 MA RIETTA ST., N.W.. sulTE 3100

ATLANTA. G EORGIA 303o3

.....

In Reply Refer To:

SEP 181979

RII:TJMc

50-302/79-37

Florida Power Corporation

Attn:

W. P. Stewart, Manager

Nuclear Operations

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by T. J. McHenry of this office

on September 2-4, 1979 of activities authorized by NRC License No.

DPR-72 for the Crystal River facility, and to the discussion of our

findings held with G. P. Beatty at the conclusion of the inspection.

Areas examined during the inepection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NPC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a reparate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

1219

304

7 9102504 d

a

t

Florida Power Corporation

-2-

SEP 181979

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Since:ely,

8. 6,

R. C.

wis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-302/79-37

cc w/ enclosure:

G. P. Beatty, Jr.

Nuclear Plart Superinten. dent

Post Offise Box 1240

Crystal River, Florida 32629

1209

305

.