Forwards IE Bulletin 79-24, Frozen Lines. Action Required
ML19254C993
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/27/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
References
NUDOCS 7910190259
Download: ML19254C993 (2)


Text

en arg

  1. p g'o UNITED STATES g

NUCLEAR REGULATORY COMMISSION E

REGION 11 o

101 MARIETTA ST., N.W., SUITE 3100 o

ATLANTA, GEORGIA 30303 SEP 2 71979 In Reply Fe -

Co:

Rll:JPO (50-302' Florida Power Corporation Attn:

W. P. Stewart, Manager Nuclear Operations P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Gentlenen:

The enclosed Bulletin 79-24 is forwarded to you for action. Written responses are required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, James P. O'Reill Director

Enclosure:

1.

IE Bulletin No. 79-24 2.

Designated Applicants for Operating Licenses 1190 006 70101902_.S y

bEP Florida Power Corporation

_2_

cc w/ enc 1:

G. P. Beatty, Jr.

Nuclear Plant Superintendent Post Office Box 1240 Crystal River, Florida 32629 I i'iU U 4

Accession No. 7908220114 SSINS Nt.

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 27, 1979 IE Bulletin No. 79-24 FR0 ZEN LINES Summ.ry:

On January 3, 1979, an musual event occurred at Davis-Besse, luit 1.

The event involved the fre.: zing of the water in a portion of the high pressure coolant injection (HPCI) system recirculation line that is common to both high pressure coolant injection pumps. The line was not thawed until January 5, 1979, and the event was not reported to NRC until March 12, 1979.

In addition, over the past five years, there have been several events involving frozen instrument and sampling lines.

Description of Circumstances:

The condition was discovered on January 3, 1979, while the reactor was operating at approximately 96 percent power. During a monthly surveillance test of the HPCI pumps, there was no flow through the recirculation line from the pump discharge to the Borated Water Storage Tank (BWST).

Investigation revealed that water in a portion of the line exposed to the outside weather was frozen.

This portion of the line to the BWST is common to both HPCI pumps.

The line has redundant heat tracing (a heated wire to prevent freezing); it is insulated; and it has a low-temperature alarm system to warn of freezing conditions.

Water in the line froze apparently because of prolonged sub-freezing temperatures and a ?efect in the insulation. There was no apparent malfunction of the heat tracing or temperature alarm circuits, although the temperature sensing elements are located in an area not exposed to the coldest temperature conditions.

This recirculation line serves two purposes: One is to provide a flow path for surveillance testing, and the other is to provide a minimum flow path to prevent possible damage to the pump in the event it is operated against a closed discharge valve or a reactor coolant system pressure greater than the maximum discharge pressure of the pump (appror.imately 1600 psig).

In the initial review of the event on January 3, 1979, the licensee concluded that the pumps were still operable with tha

~4-'-

no immediate action was taken to thaw th January 5, 1979, the line was thawed and was'successfully completed.

DUPLICATE DOCUPINT Entire document previously entered into systen under:

kkh ANO r

No. of Pages: