ML19254B402
| ML19254B402 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/06/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19254B393 | List: |
| References | |
| NUDOCS 7909270476 | |
| Download: ML19254B402 (2) | |
See also: IR 05000302/1979027
Text
'
.
o
-
k# AIG
y
'o,
UNITED STATES
-
3
f'
,o
NUCLEAR REGULATORY COMMISSION
i
$
^g/'
E
REGIGN 11
,
'
o,,h' \\v f E
% . .%
5
101 MARIETT A sT., N.W.. sulT E 3100
ATL ANT A, GEORGI A 30303
o
.+
In Reply Refer To:
AUG 6
1379
RII:HDJ
50-302/79-27
Florida Power Corporation
Atto:
W. P. Stewart, Manager
Nuclear Operations
Post Office Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by H. D. Jenkins of this office
on July 9-17, 1979,of activities authorized by NRC License No. DPR-72
for the Crystal River 3 Nuclear Plant facility, and to the discussion of
our findings held with J. Cooper on-site at Crystal River, Florida,and
with P. Baynard, at the company offices in St. Petersburg, Florida.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures.and representative
records, interviews with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items. The status of these
items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed
in tne enclused report. This item will be examined during subsequent
inspectiors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full cornpliance will be achieved.
During the inspection it was found that certain activities under your
license appear to deviate from commitments to the Commission and have
1048 094
4#
7909270
- $
i
.
-
.
.
'
Florida Power Corporation
-2-
7.f
AUG 6
1979
./
safety significance. This item is in the Notice p Deviation enclosed
herew:.th as .'.ppendix B.
Please provide us in wrning within 20 days of
your receipt of this letter yo"r comments including a description of
corrective actions that have been or will be taken, corrective actions
which will be taken to avoid further deviations, and the date corrective
actions were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
17 4.
R. C.
ewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
,
3.
Inspection Report No. 50-302/79-27
cc v/ enclosures:
G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1228
Crystal River, Florida 32629
1048 095
.