ML19253C498
| ML19253C498 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 09/24/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML19253C492 | List: |
| References | |
| NUDOCS 7912050632 | |
| Download: ML19253C498 (2) | |
See also: IR 05000324/1979029
Text
.
.
/
'o,,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
g
a
REGION il
,
o
101 MARIETTA ST
N.W.. SUITE 310o
ATLANTA, GEORGIA 3o3o3
SEP 2 41979
In Reply Refer To:
RII:JE0
50-324/79-29
.
50-325/79-30
Carolina Power and Light Company
ATTN:
J. A. Jones, Senior Executive Vice President
and Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by J. E. Ouztr, af this office on July 2-27,
1979, of activities authorized by NRC License Nor. DPR-71 and DPR-62 for the Brunswick
facility, and to the discussion of our findings held with A. C. Tollison, Jr. , and
J. M. Brown at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed
inspection report. Within these areas, the inspection consisted of selective exami-
nations of procedures and representative records, interviews with personnel, and
observations by the inspector.
During the inspection, it was found that certain activities under your license appear
to be in noncompliance with NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's
" Rules of Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of this notice,
a written statement or explanation in reply including: (1) corrective steps which
have been taken by you, and the results achieved; (2) corrective steps which will be
taken to avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Rcgulations, a copy of this letter and the enclosed inspection report
will be placed in the NRC's Public Document Room. If this report containn any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application must include a full statement of
the reasons on the basis of which it is claimed that the information is proprietary,
and should be prepared so that proprietary information identified in the application
-
1504 052
w soso
(3b
.
.
.
.
Carolina Power and Light Company
-2-
SEP 2 41979
is contained in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be p?. aced in the Public Document
Room.
-
Should you have any questions concerning this letter, we will be glad to discuss them
with you.
Sincerely,
E. c.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-325/79-30,
and 50-324/79-29
cc:
a. C. Tollison, Jr.
Plant Manager
Box 458
Southport, NC 28461
1504 053
/
_