ML19253C352
| ML19253C352 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/25/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19253C351 | List: |
| References | |
| NUDOCS 7911300674 | |
| Download: ML19253C352 (2) | |
See also: IR 05000413/1979018
Text
.
Sn nro
[
o
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
n
g
a
REGION il
.
o,
101 MARIETTA ST., N.W., SUITE 3100
%*****
ATLANTA, GEORGIA 303o3
OCT 2 51979
In Reply Refer To:
RII:MDH
50-413/79-18
50-414/79-18
Duke Power Company
Attn:
W. O. Parker, Jr.
Vice President, Steam Production
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by M. D. Hunt of this office on
October 2-3, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba Nuclear Station facility, and to the
discussion of our findings held with D. L. Freeze at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observationr, by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe ta be
proprietary, it is necessary that you make a written application eithin 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1443 05/
7 93
.
.
Duke Power Company
-2-
OCT 2 51979
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
kf
n'y+
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
,
Enclosures:
Inspection Re, ort Nos. 50-413/79-18
and 50-414/ 9-18
cc w/ enclosures:
D. G. Beam, Project Manager
Post Office Box 223
Clover, South Carolina 29710
1443
068