Forwards IE Insp Rept 50-302/79-36 on 790911-14.No Noncompliance Noted
ML19253C253
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/18/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19253C254 List:
References
NUDOCS 7911300380
Download: ML19253C253 (2)


See also: IR 05000302/1979036

Text

'

  1. pn nua

'o

UNITED STATES

g q8Cc9--

g

!

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION 11

4

9

o,

'[

101 MARIETTA ST., N.W., SUITE 3100

j'

ATLANTA, GEGP.GIA 30303

OCT 181979

In Reply Refer To:

RII:WWP

50-302/79-36

Florida Power Corporation

Attn:

W. P. Stewart, Manager,

Nuclear Operations

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by W. W. Peery of this office on

September 11-14, 1979 of activities authorized by NRC License No. DPR-72 for the

Crystal River facility, and to the discussion of cor findings held with G. P.

Beatty, Jr. at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1440

537

7911300

.

OCT 161979

Florida Power Corporation

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

i

/

J. T. Sutherland, Chief

, g V Fuel Facility and Materials

{

Safety Branch

Enclosure:

Inspectica Report No. 50-302/79-36

cc w/ enclosure:

G. P. Beatty, Jr.

Nuclear Plant S,iperintendent

Post Office Box 1240

Crystal River, Florida 32629

1440