-s

.

ENCLOSURE 1

.

-

,

DESCRIPTION OF VIOLATIONS

Metropolitan Edison Company

Readic.g, Pennsylvania

i

Docket No. 50-289

License No. DPR-50

Certain activities under your license appe?r to be in violation of AEC

requirements as indicated below:

The following violation is considered to be of Category II severity.

j

,1.

The FSAR Section 1A, Operating Quality Assurance Plan,Section VI,

-

ytf[- Document Control, states in pac t:

". . .The Generation Division doc-

??" ument control procedure further requires that each Manager and Station

,

Superintendent provide in their procedures for measures:

...to ensure

that approved changes be promptly transmitted for incorporation into

documents; and to ensure that cisolete or superseded documents are

eliminated from the system and not used..."

~ ~ " . -

Contrary to the above:

.~. a.

On June 4, 1974, the Makeup and Purification System was being

lined up during preparations for initial criticality with the

- -

Control Room Working Copy of OP 1104-2 Revision 1, although the

Control Room File Copy of OP 1104-2 was Revision 2.

The effective

-

revision of this procedure was Revision 3 which had been distributed

on May 24, 1974,

i

I

b.

On bby 30, 1974 the' Decay Heat Removal System was lined up during

preparations for initial criticality in accordance with OP 1104-4.

The valves were positioned to the valve checklist, Enclosure I,

Revision 0.

The. correct revision of Enclosure I was Revision 2,

dated April 27, 1974.

-

.

0

In both of these instances, the differences between the supersefed

and revised procedures included the following:

1) Valves being

added to the list of things to be checked; 2) Valve positions

being changed from open to closed and vice versa; and 3) Valve

status being changed from " closed" to " locked closed", etc.

The following violation is considered to be of Category III severity.

2.

The FSAR Section IA, Operating Quality Assurance Plan, Secticn VI,

Document Control states in part:

" ..The Superintendent of the

,.'MI

.

Station Unit I will ensure that no changes are made to site instruc-

tions, procedures, and drawings unless such changes are approved by

the appropriate approving organization..."

1445

195

7910280 3

_

,

.

.

.

.

-2-

I

, v*

.

.

l

Contrary to the above, the Waste Gas Disposal System was lined

up during preparations for initial criticality in accordance with

OP 1104-27.

The Control Room Working Copy of this procedure had

,

'

changes to valve, level indicator and electrical panel designators

on Pages' 5 and 6 without any approval indicated.