ML19253A945

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/79-14 on 790612-15 & Notice of Deviation
ML19253A945
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/25/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19253A947 List:
References
NUDOCS 7909130022
Download: ML19253A945 (2)


See also: IR 05000346/1979014

Text

[pn

(o

UNITED STATES

Tm

o

e

cgc

NUCLEAR REGULATORY COMMISSION

$g

g# E

REGION lit

o, 'A

[

799 ROOSEVELT ROAD

U

% '.b4

o

GLEN ELLYN. lLLINOls 60137

e ..+

JUL 2 51979

Docket No. 50-346

\\

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. A. G. Januska and

Miss R. J. Greer of this office on June 12-15, 1979, of activities at

Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. T. Murray

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

Certain activities, set forth in the enclosed Appendix A to this letter,

appear to be a deviation from a commitment which you have made with the

Commission. The inspection showed that action had been taken to correct

the identified deviation and to prevent recurrence.

Consequently, no

reply to this deviation is required and we have no further questions

regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this of fice, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the application.

.

7909130022 p