Revision of Sections 1.0-8.0 to Amend MPP-1 to License SNM-696
ML19253A706
Person / Time
Site: 07000734
Issue date: 08/03/1979
From:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML19253A703 List:
References
NUDOCS 7909110036
Download: ML19253A706 (1)


Text

.-

Revision of Sections 1.0 through 3.0 In Their Lntirety To Materials and Plant Protection Amendnent MPP-1 To License No. SNM-696 1.0 FAC;LITY ORGANIZATION Currently, there are no conditions under this section.

All requirements are adequately addressed in an approved plan.

2.0 FACILITY OPERATION 2.1 The licensee shall follow the " Fundamental Nuclear Material Control Plan", GA-A-13248, Revision 2, dated February 1976, as anended March 24, 1976, November 10, 1976, September 26, 1977 and August 14, 1978; as revised September 27, and October 11, 1978 and April 20, and June 21, 1979 and in accordance with the provisions of 10 CFR 70.32(c).

2.2 No statement in the licensee's Plan identified in Condition 2.1 shall

elieve the licensee of a requirement of 10 CFR Part 70 unless granted in a specific exemption or exception set forth as a condition of this license.

2.3 Operations involving special nuclear materials which are not described in the Plan identified in Condition 2.1 shall not be initiated until an appropriate safeguards plan has been approved by the Nuclear Regulatory Connission.

2.4 For the low enriched uranium production campaign described in the September 28, 1978 letter, the licensee shall follow the caterial control and accounting program madifications described in the September 28 and October 12, 1978 letters.

'0 MEASUREMENTS 3.1 Notwithstanding the requirecents of 10 CFR 70.58(e) the licensee need not measure the special nuclear material content of encapsulated SNM sources which are unc ened for research and development or calibration activities.

r 3.E Notwithstanding the requirements of 10 CFR 70.51(f)(2)(iii), (f)(3)(ii),

and 10 CFR 70.58(e), drums of waste materials awaiting incineration in tne waste incinerator material balance area of Plant I may be inventoried on the basis of prior measurements without the use of tamper-indicating devices.

Waste caterials in Plant III destined for ultimate disposal may be inventoried or shipped on the basis of prior measurements without the use of tamper-indicating devices.

3.3 For those materials ceasured by non-destructive assay, the licensee may calculate the element content on prior isotopic abundance measurecents that can be demonstrated to be representative of the material.