Forwards IE Insp Repts 50-269/79-17 & 50-287/79-16 on 790627-29 & Notice of Violation
ML19250C458
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19250C434 List:
References
NUDOCS 7911260157
Download: ML19250C458 (2)


See also: IR 05000269/1979017

Text

e

'o.

UNITED STATES

$ \\ , e g ,j

NUCLEAR REGULATORY COMMISSION

REGION 11

h' "h[j#

-

f-

r

101 MARIETT A sT., N.W., SUITE 3100

o,

AT LANT A, G EoRGI A 30'w3

's

g

.....

24

In Reply Refer To:

RII:WPA

50-287/79-16

50-269/79-17

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on June 27-29,

1979, of activities authorized by NRC Operating License Nos. DPR-38 aad DPR-55

for the Oconee Nuclear Station Unit 1 and Unit 3 facilities, and to the discussion

of our findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

1394

228

7911260

- ,/b

.

.

JUL 2 41979

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

k

M

C. E. Murphy, Chief

G

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-287/79-16

and 50-269/79-17

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

1394