Forwards IE Insp Repts 50-491/79-14,50-492/79-14 & 50-493/79-14 on 790823-24 & Notice of Violation
ML19250C140
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 09/07/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19250C129 List:
References
NUDOCS 7911080280
Download: ML19250C140 (2)


See also: IR 05000491/1979014

Text

sN

/

'o,,

UNITED STATES

+

L

!

NUCLEAR REGULATORY COMMISSION

o

g

ae

REGION il

o

101 MARIETTA ST

N.W.. SulTE 3100

o

ATLANTA, GEORGIA 3o3o3

.....

In Reply Refer To:

RII:JJL

SEp 0 7 NS

50-491/79-14

50-492/79-14

50-493/79-14

Duke Power Company

Attn:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office

on August 23-24, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear

Station facility, and to the discussion of our findings held with J. Willis

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection, report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and cbservations by the inspector.

We have examined actions you have taken with regard to previously

identified inspection findings. These are discussed in the enclosed inspection

report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid fe:t her noncompliance;

and (3) the date when full compliance will be achi

'2.

1274

219

7 0110 8 0 2 8C'

.es

gp 0 'i ON

Duke Power Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

brt 2, Title 10, tode of Federal Regulations, a copy of this letter aad

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you. *

Sincerely,

W

C. E. Murphy,

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-491/79-14,

50-492/79-14 and 50-493/79-14

cc w/ enclosures:

J. T. Moore, Project Manager

Post Office Box 422

Gaffney, South Carolina

1274