Text
sN
/
'o,,
UNITED STATES
+
L
!
NUCLEAR REGULATORY COMMISSION
o
g
ae
REGION il
o
101 MARIETTA ST
N.W.. SulTE 3100
o
ATLANTA, GEORGIA 3o3o3
.....
In Reply Refer To:
RII:JJL
SEp 0 7 NS
50-491/79-14
50-492/79-14
50-493/79-14
Duke Power Company
Attn:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office
on August 23-24, 1979 of activities authorized by NRC Construction
Permit Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear
Station facility, and to the discussion of our findings held with J. Willis
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection, report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and cbservations by the inspector.
We have examined actions you have taken with regard to previously
identified inspection findings. These are discussed in the enclosed inspection
report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid fe:t her noncompliance;
and (3) the date when full compliance will be achi
'2.
1274
219
7 0110 8 0 2 8C'
.es
gp 0 'i ON
Duke Power Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
brt 2, Title 10, tode of Federal Regulations, a copy of this letter aad
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you. *
Sincerely,
W
C. E. Murphy,
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-491/79-14,
50-492/79-14 and 50-493/79-14
cc w/ enclosures:
J. T. Moore, Project Manager
Post Office Box 422
Gaffney, South Carolina
1274
220
..