Amend 62 to License DPR-44,allowing Continued Operation Until 800103 of Plant W/O Performance of Pump Flow Rate Capacity Test on A/C Subsys of Core Spray Sys
ML19250B809
Person / Time
Site: Peach Bottom 
Issue date: 10/19/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19250B810 List:
References
NUDOCS 7911050263
Download: ML19250B809 (4)


Text

.

a are

/e wc, UNITED STATES

!\\, q l 7.

NUCLEAR REGULATORY COMMISSION

{ (y_

g 0

WASHINGTON, D. C. 20555

{

N'y /

PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY

_DELMARVA POWER AND LIGHT COMPANY

{

ATLANTIC CITY ELECTRIC COMPANY I

00CXET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 62 License No. DPR-44 l.

The Nuclear Regulatary Commission (the Commission) has founo that:

A.

The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated October 2,1979, complies with the standark and requirements of t,ie Atomic Energy Act of 1954, as amended (the Act), and the Conmission's ru?cs and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the crovisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendnent can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Ccmmission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amencment is in accordance with 10 CFR Part 51 of the Commission's regulations and all acplicable requircents have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attaci.c.:ent to this license amendment and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amendD to read as folicws:

(2) Technical S ecifications The Technical Specifications contained in Apcendices A and 3, as revised thrcugh Amencment No.

, are he" e y incorporated in the Iicense.

The 1icensee shall operate the facility in accordance with the Technical Specifications, g

7 911050 M b 3

-2 r

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/ hip o to, Chief a

Operating Reactors Branch #3 j

Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance:

October 19, 1979

)27) 085

ATTACHMENT TO LICENSE AMENDMENT NO. 62 FACILITY OPERATING LICENSE N0. DPR-44 DOCKET NO. 50-277 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains vertical lines indicating the area of change, f

Remov9 Insert 125 125 1271 086

PM?S Unit 2 LI".IT:':

CT:0! TIC"5 TOR OPERATION SURVEILLANCC REOCIRE*4ENTS 3.5. A : re I:rav and L?CI

4. 5. A Core 3,rav and LPCI iubsestem (con:'d)

Subsvste- (cont'd) 3c:5 CS5 shall be operabia whenever Ite-Trecuency irradiated fuel is in the vessel and pric: :: raacter startup feca a (d)

Pu=p Flcu Rate Once/3 enths*

l C:ld Shaticwn condition except as snecif ied in 3 5. A.2 and 3 5.F.3 5cch iceps shall deliver a: least belev:

6250 sp a;sinst a system head correspending c a reacter vessel pressure of fv5 psig.

g(e)

Cere 3 pray '.icador

? Instrumentation Check Once/ day Calibrate Once/$ mentns (f)

Operability check In accordance te ensure : hat with 4.5.A.2, pumps vill s: art 4.5.A.4 and and.c:ce cperated 4.5.A.5 injecticn valves will cpen.

2. Tren and after the date : hat ene cf
2. fihen it is determined that ene the core spray subsys:ers is made core spray subsystem is inoperable, er fcuns :c be inoperable fer any the operable core spray subsystem raasen, :entinued reac ce operation and the L?CI subsys: ems shall be is permissible only during the demonstrated to be operable in su: eedin; seven days provided that accordance with 4.5. A. l(F) and durint such seven days all active 4.5.A.3(e) vichin 24 hcurs, and at coz: enc.:s of the ether cors spray least once per 7C hours thereafter subsystem and active compenants of until the incperable core spray the L?CI subsystems are operable.

subsystem is rastered te operable status.

3. L?CI subsystem Testing shall be as folicws:
  • ;d 1 T r c 9 a c 7 C '>

l (2 )

?i u.a:ec

:ma t i c On:2 ':p e re :in;,

.;; u.it i c a Tes:

Cycle I

(b )

?urp p a ri.:1.i:y Once/i menta

  • ! rcus. January 3, 1930, ::n:inued pcwer

,r erat.:n.i:,co: :ne c paa.it:y cf

' erf or.in ; :r.e Cere sp ray pum, I cu ra:a :as: f:r :he A/C subs / stem :: 7ermit:c 1

l Amendment No. ^,

, ' 62 125 17_71 087