- }* "t Guq'o,
UNITED STATES
_
NUCLEAR REGULATORY COMMISSION
EV! L # ' f' i
.
2 .D@ h ' E
REGION il
k
f
101 MARIE TT A sT., N W., SUIT E 3100
AT L ANT A, G EORGI A 30303
.....f
In Reply Refer To:
JLDi 9 e tg79
RII:WHM
50-395/79-17
South Carolina Electric and Gas Company
Attn:
M. C. Johnson, Vice President
Special Services and Purchasing
Post Office Box 764
Columbia, South Carolina 29218
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this
office on May 22-25, 1979 of activities au*
-rized by NRC Construction
Permit No. CPPR-84 for the V,
C. Summer Nm lear Station f acility, Unit 1,
and to the discussion of our findings he
with J. F. Algar at the
i
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observ<+ ions by the inspector.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report.
These items will be examined during subsequent
inspections.
Within the scope of this inspection, no items of noncompliance were
disclosed.
During the inspectica it was found that certain activities under your
license appear to deviate from commitments to the Commission, and have
safety significance.
This item is identified in the Notice of Deviation
enclosed herewith as Appendix A.
Please provide us in writing within 20
days of your receipt of this letter your comments including a description
of corrective actions that have been or will be taken, corrective actions
which will be taken to avoid further deviations, and the date corrective
actions were or will be completed.
In accordance with Se ' ion 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this of fice to withhold such information
c.n c e np
sp} . . F . O x
790904 0 / ff'
j f
.
South Carolina Electric and
JUN
1979
Gas Company
-2-
from public disclosure.
Any such application must include a full state-
ment of the reasons on the basis of which it is claimed that the i n f o rma-
tion is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be p. laced in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
v
f
\\
/C.E.1 urphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report No. 50-395/79-17
cc w/ enclosures:
T. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N.W.
Washington, D.C.
20006
A. A. Smith
Quality Assurance
Post Office Box 8
Jenkinsville, South Carolina
29065
O. S. Bradham, Manager
Nuclear Operations
Post Office Box 8
Jenkinsville, South Carolina 29065
')(} ] '2 i' .Sl
,