ML19249A673
| ML19249A673 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/05/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19249A675 | List: |
| References | |
| NUDOCS 7908240128 | |
| Download: ML19249A673 (2) | |
See also: IR 05000302/1979020
Text
b
.
pRRfCo
'o
UNITED STATES
E'
3,,gI/ ,'n
NUCLEAR REGULATORY COMMISSION
a
E
REGION 11
$
"V.8
o
101 MARIETT A sT.. N.W.. SUIT E 3100
[
ATLANTA. GEORGIA 30303
.c
JUL 0 51979
In Reply Refer To:
RII:LM
50-302/79-20
Florida Power Corporation
ATTN:
W. P. Stewart, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
'
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on June 13-15,
1979, and June 20-22, 1979, of activities authorized by NRC License No. DPR-72 for
the Crystal River Unit 3 facility, and to the discussion of our findings held with
G. Beatty at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
er. closed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
ith
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part '., Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Siacerely,
.
L
r
Charles E. Murph'y, Ch ef
'
Reactor Construction and Engineering
Support Branch
3pj
Enclosure:
Inspection Report No. 50-302/79-20
cc w/ encl:
see Page 2
gg
.
JUL 0 51979
s
Florida Power Corporation
-2-
cc w/ enc 1:
G. P. Beatty, Jr.
Plant Superintendent
P. O. Box 1228
Crystal River, FL 32629
.
4
,t
. ,a
v'
.