Text
_
.
POR
.
.
W
[
g,
UNITED STATES
,
h
.
NUCLE AR REGULATORY COMMISSION
j I
~
j
REGION lil
- T
y
799 AOCSE V E L T Ro AD
~
4 y
GL E N E L L Y N. IL LINOIS 60137
9...**
MAY 8
1979
Docket No. 50-329
Docket No. 50-330
Consumers Power Company
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnall Road
Jackson, Michigan 49201
Gentlemen:
This refers to the inspection conducted by Mr. R. J. Cook of
this office during the period February 1 - March 29, 1979, of
activities at Midland huclear Power Plant construction site,
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81
and No. CPPR-82 and to the discussion of our findings with
Messrs. D. B. Miller, J. L. Corley, and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the enclosed inspection report will
be placed in the NRC's Public Document Room, except as follows.
If this report contains information that you or your contractors
believe to be proprietary, you must apply i; writing to this
office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The
application must include a full statement of the reasons for
which the inf oimation is considered proprietary, and should be
prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
-3
,
cy/ h
79073000SS
.
.
.
.
Consumers Power
-2-
MAY 8
1979
Company
We will gladly discuss any questions you have concerning thir
inspection.
Sincerely,
..
3
.s~
d;[ x ",m 2/"il( w
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-329/79-09
and No. 50-330/79-09
cc v/ encl:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Dr. Wayne E. North
Myron M. Cherry, Chicago
,c1