Forwards IE Inspec Rept 50-416/78-11 & 50-417/78-11 on 780628-30 & Notice of Violation
ML19248C470
Person / Time
Site: Grand Gulf  
Issue date: 08/10/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19248C477 List:
References
NUDOCS 7809270271
Download: ML19248C470 (2)


See also: IR 05000416/1978011

Text

[pa at Cg

UNiiED si ATEs

o,

NUCLEAR REGULATORY COMMISSION

[3 -a[ ', , *

'o

n[GION H

-' -

230 PE ACHTnC E sTHEE T. N W. sulTE 1217

o

ATL ANT A, GEORGI A 30303

g

s.

f

  • = **

AUG 101978

In Reply Refer To:

RII:JRH

50-416/78-11

50-417/78-11

Mississippi Power and Light Company

Attn:

Mr. Norris L. Stampley

1

Vice President of Production

P. O. Box 1640

I

Jackson, Mississippi

39205

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Harris of this

of.' ice on June 28-30, 1978, of activities authorized by h7C Construction

Perait Nos. CPPR-118 and CFFR-119 for the Grand Gulf facilities, and to

the discussion of our findings held with Mr. T. E. Reaves at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report.

These items will be examined during subsequent

inspections.

During the inspection, it was found that <.ertain activities under your

license appear to be in noncompliance with hTC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

(

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full coc:pliance will be achieved.

1

'

i

1032

C ;

RO%7ODl

.

.

(

AUGIO t~s

Mississippi Power

.

.

.

.

and light Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is net essary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such appiication riust include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate pa.t. of the

document.

If we do not hear from you in this regard withi . the specified

period, the report will be placed in the Public Document I tu.a.

g

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

,

I

Sincerely,

j

/

~

C. E. Murphy, M

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-416/78-11

and 50-417/78-11

cc w/ enc 1:

Mr. W. L. Nail

Plant Superintendent

P. O. Box 756

Port Gibson, Mississippi 39150

(