[pa at Cg
UNiiED si ATEs
o,
NUCLEAR REGULATORY COMMISSION
[3 -a[ ', , *
'o
n[GION H
-' -
230 PE ACHTnC E sTHEE T. N W. sulTE 1217
o
ATL ANT A, GEORGI A 30303
g
s.
f
- = **
AUG 101978
In Reply Refer To:
RII:JRH
50-416/78-11
50-417/78-11
Mississippi Power and Light Company
Attn:
Mr. Norris L. Stampley
1
Vice President of Production
P. O. Box 1640
I
Jackson, Mississippi
39205
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Harris of this
of.' ice on June 28-30, 1978, of activities authorized by h7C Construction
Perait Nos. CPPR-118 and CFFR-119 for the Grand Gulf facilities, and to
the discussion of our findings held with Mr. T. E. Reaves at the con-
clusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report.
These items will be examined during subsequent
inspections.
During the inspection, it was found that <.ertain activities under your
license appear to be in noncompliance with hTC requirements. This item
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
(
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full coc:pliance will be achieved.
1
'
i
1032
C ;
RO%7ODl
.
.
(
AUGIO t~s
Mississippi Power
.
.
.
.
and light Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is net essary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such appiication riust include a full statement
of the reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate pa.t. of the
document.
If we do not hear from you in this regard withi . the specified
period, the report will be placed in the Public Document I tu.a.
g
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
,
I
Sincerely,
j
/
~
C. E. Murphy, M
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-416/78-11
and 50-417/78-11
cc w/ enc 1:
Mr. W. L. Nail
Plant Superintendent
P. O. Box 756
Port Gibson, Mississippi 39150
(
1032