ML19248C478

From kanterella
Jump to navigation Jump to search
Notice of Violation from Inspec on 780628-30
ML19248C478
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/11/1978
From: Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19248C477 List:
References
50-416-78-11, NUDOCS 7809270275
Download: ML19248C478 (1)


Text

t t

APPENDIX A NOTICE OF VIOLATION Mis.eissippi Power and Light Company License No. CPPR-119 Based on the results of the NRC inspection conducted on June 28-30, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below.

These items have been categorized as described in our correspondence to you dats :

December 31, 1974.

Criterion V of Appendix B to 10 CFR 50, as implement, ' by the PSAR, Paragraph 17.1.5, requires in part, " Activities af f ecting quality shall be prescribed by documented instructions, procedures,... and shall be accomplished in accordance with these instructions, procedures,.

In addition, Specification No. 9645-C-191.0, I

paragral.i 8.1.5.1.5 and referenced ASTM Standard, C-31-69, require that concrete test specimens made in the field be stored and cured during the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> under conditions that maintain the tem, rature in the range of 60 to 80 degrees Fahrenheit.

Contrary to the above requirements, on June 28, 1978, test cylinder sets 2650 A-D, 2651 A-D, 2652 A-D, 2653 A-D and 2654 A-D were being exposed to full sun at an ambient temperature of 99 degrees Fahrenheit.

This is an infraction.

(

1032

,_ 5 lSOCDO N