Forwards IE Insp Repts 50-369/79-24 & 50-370/79-12 on 790522-25.No Noncompliance Noted
ML19242D480
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19242D473 List:
References
NUDOCS 7908150294
Download: ML19242D480 (2)


See also: IR 05000369/1979024

Text

..

[paMcg

-

'o

UNITE D ST ATES

8%

g / **,

NUCLEAR REGULAYORY COMMISSION

$

h,',#

E

REGION ll

,

o, ' g Q,j

[

101 MARIETT A sT., N W., SUITE 3100

'N'

e

AT L ANT A, GE oRGI A 30303

JUN 13 MS

In Reply Refer To:

RII:TDG

50-369/79-24

50-370/79-12

Duke Power Company

Attn:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by T. D. Gibbons of this office

on May 22-25, 1979 of activities authorized by NRC Construction Permit

Nos. CPPR-83 and CPPR-84 for the McGuire Nuclear Plant facility, Units 1

and 2, and to the discussion of our findings held with J. C. Rogers at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspectioe

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any infonnation that you (or

your contractor) believe to be proprietary, it is necesst.y that you

make a written application within 20 days to this office to withhold

such information froc public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

7908150 FIN 1

G90203

..

JUN 191979

ljuke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

't

Y

V

C . E . Mu rphy , CTEFf

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-363/79-24

and 50-370/79-12

cc w/ enclosures:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North Carolina 28242

690204