ML19242C759
| ML19242C759 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 06/26/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19242C760 | List: |
| References | |
| NUDOCS 7908130335 | |
| Download: ML19242C759 (1) | |
Text
GAR NI C(fg k
o, UNITED STATES 9
e 8 y)
( 'g NUCLEAR REGULATORY COMMISSION
. ~.
e nEGION V 3.f'qt",d1bd[,.,[
1990 N. C ALIFORNI A L10ULEV ARD Q,
d' SulTE 202, WALNUT CRE E K PLAZA WALNUT CRE EK, CALIFORNIA 94596 June 26, 1979 Docket Nos. 50-508 50-509 Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Attention:
Mr. N. O. Strand Managing Director Gentlemen:
Thank you for your letter dated May 30, 1979 inforiaing us of the additional steps you have taken to correct the iteir.s which we brought to your attention in our letter dated January 22, 1979.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, n/(? C5 ~,cffI- __
R. H. Engelken Director 55bMO 79081803 F