Responds to NRC 790316 Ltr Re Deviation Noted in QA Program Insp Rept 99900116/79-01.Corrective Actions:All Wires/Lugs Have Been Reinspected & Wires Requiring Rework Have Been Machined
ML19241B223
Person / Time
Site: Midland
Issue date: 05/15/1979
From: Wright H
BUNKER RAMO CORP.
To: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19241B220 List:
References
REF-QA-99900116 NUDOCS 7907130228
Download: ML19241B223 (5)


Text

.

"== AMPHENOL AMPHENOL SAMS DIVISION 9201 inaeandere A e .

  • Chas orn Ca f . 91311 * (213) 3410710
  • TWX 910 494-1211 May 15, 1979 United States Nuclear Regulatory Commiss:.on Region IV 611 Ryan Plaza Dr. .

Arlington, Texas 76012 h

Attn: Mr. Uldis Potapovs, Chief Vendor Inspection Branch Subj: Midlands Nuclear Site, Midlands Michigan, Program 51300 Gentlemen:

Bunker Ramo SAMS Quality Assurance visited subject nuclear site to re-inspect and rework items (electrical penetrations) as surfaced by Consumer Power.

The attached IOC, Howard D. Wright, Bunker Ramo SAMS Quality Assurance Manager, to Bunker Ramo SAMS Staff, delineates the action that Quality has completed to clarify and resolve the areas of concern.

Bunker Ramo SAMS Quality, Bechtel Quality and Consumer Power Quality witnessed the re-inspection, rework and acceptance concerning the loose wire and lugs. All wires / lugs have been re-inspected and those requiring rework have been reworked.

This re-inspection, rework and inspection closes the Midlands electrical penetration condition.

Should you have any questions concerning this action, the undersigned will be pleased to discuss it with you.

Sincerely, AMPHENOL NORTH AMERICA DIV.

BUNKER RAMO SAMS 7, /% d / Uh !a lrl~~ ,

Howard D. h# right/ ' p HDW/ met Quality Assurance Manager j Encl. b f f

700?130?-

  • b) M ,

~

TEROFFICE COMMUNICATIONS

E AND MISSILE SYSTEMS OPERATIONS

= AMPHENOL NENOL CONNECTOR DIVISION nWoerdence Ave. . Chatserin, Cahf. 31311 * (213l 3414 710. TWX 910-4 34-1 D 1

~2 E. Beaupre CC .

A. Berk CME May 14,'1979 C. Baldwin ]

T. Kehl GCM H. D. Wright b" L. Stupay B. Wagner sta;ECT Quality Assurance '

Reinspection of Midlands EPA Loose Wire-Lugs f

l The following is a list of EPA's which, during the hand pull test of wire lug connections, were found to be in a satisfactory condition.

SAMS BECHTEL DATE EPA EPA OF S/N S/N INSPECTION COMMENTS /RESULTS AS131-38 1Z150 4/30/79 All connections ok AS131-29 1Z151 4/30/79 All connections ok AS131-17 1Z115 4/30/79 All connections ok, center rail missing bolts AS166-1 1Z112 4/30/79 All connections ok AS131-13 1Z113 5/1/79 All connections ok AS166-8 17 t19 5/1/79 All connections ok AS137-60 12125 5/1/79 All connections ok AS 13 .'- 5 3 1Z126 5/1/79 All connections ok AS137-47 1Z159 5/1/79 All connections ok AS137-52 12160 5/1/79 All connections ok AS131-2 1Z158 5/1/79- All connections ok AOl37-43 1Z123 5/1/79 All connections ok AS 131- 2 6 1Z132 5/ /79 All connections ok AS137-67 1Z133 5/1/79 All connections ok AS136-1 lZ135 5/1/79 All connections ok AS166-2 1Z145 5/1/79 All connections ok AS146-1 1Z138 5/1/79 All connections ok AS137-58 12147 5/1/79 All connections ok AS136-6 1Z144 5/1/79 All connections ok AS 13 7 -4 9 1Z143 5/1/79 All connections ok '

AS137-63 12142 5/1/79 All connections ok AS131-7 1Z101 5/2/79 All connections ok 12102 5/2/79 AS137-56 All coraections ok AS137-48 2Z101 5/2/79 All connections ok AS131-30 2Z102 5/2/79 All connections ok AS131-35 2Z103 5/2/79 All connections ok AS131-18 2Zl60 5/2/79 All connections ok 2Z159 g AS131-31 5/2/79 All connections ok -

AS131-32 2Z126 5/2/79 All connections ok AS137-41 2Z154 5/2/79 All connections ok -

AS137-76 2Z119 5/2/79 All connections ok U '. ;7 AS131-37  !+ 3 '1 2Zll8 5/2/7a All connections ok AS131-6 2Zll6 5/2/79 All connections ok AS137-44 2Z150 5/2/79 All connections s 'G 49 9'0 9 t@-

CAB LES / SPEC:AL CONNECTORS / ENGINEERE3 INTERCONNECTICNS

Page Two S A..S BECHTEL DATE - -

EPA EPA OF S/N S/N INSPECTION COMMENTS /RESULTS AS137-62 2Zill S/2/79 All connections ok A3131-36 2Zll2 5/2/79 All connections ok AS166-6 22114 5/2/79 All connections ok AS137-70 2Z157 5/2/79 Al] connections ok AS166-5 2Z158 5/2/79 A1: connections ok

  • AS131-25 22123 5/2/79 All connections ok AS137-45 2Z124 5/2/79 All connections ok AS136-4 2Z142 5/3/79 All connections ok AS137-64 2Z143 5/3/79 All connections ok AS 15. - 2 7 2Z132 5/3/79 All connections ok AS131-9 2:137 5/3/79 All connections ok AS131-24 22138 5/3/79 All connections ok AS131-22 2:139 5/3/79 All connections ok AS131-28 2Z145 5/3/79 All connections ok AS 137 -71 2Z146 5/3/77 All connections ok AS137-57 2Z147 5/3/79 All connections ok AS137-73 2:135 5/3/79 All connections ok The following two EPA's were not listed on the letter dated 24 Apr 79, but were inspected at the request of Bechtel Engineering.

A3131-14 2Z152 5/3/79 All connections ok AS 16 6 - 3 12152 5/3/79 Replaced lug on Term A-1, wire had pulled out during pull test.

The following is a list of EFA's where the wires had pulled loose from the lugs.

AS131-21 1Z116 4/30/79 Term. A-4 luc broken. Removed and replaced terminal lug.

AS137-69 lZlll 4/30/79 Term. J-8 wire culled out of lug.

Replaced lug. All other wires ok AS131-23 1Z114 5/1/79 Tern E2 and E12 wires pulled out of lug. Removed and replaced lugs.

All other lugs and wires OK.

AS131-34 1Z118 5/1/79 Term. B-5 wire pulled out of lug.

Removed and replaced lug. All other wires OK.

AS137-68 lZ154 5/1/79 Term. C-6 and C-16 wire pulled out cf lugs. Replaced lugs. All other wires ok.

1Z157 5/1/79 Term. E-19, E-20, F-1 Wires pulled AS131-10 out of lugs. Replaced lugs. All other wires ok.

5/1/79 Term L-2, L-4 wires pulled out .

AS131-8 12124 of lug. Replaced lugs. Terr L-3 {

luc broken. Removed and replaced lug. All other wires & lugs'OK.

m 7eo Jv/

on,

! V L.

4 5 ?' ON2 e

i

Page Three SAMS BECHTEL DATE EPA EPA OF S/N S/N INSPECTION CO 01ENTS/RESULTS AS137-65 12131 5/1/79 Term. G-10, G-14, H-5 wires pulled out of lug. Replaced lug.

All others wires & lugs ok.

AS137-75 11.37 5/1/79 Term H-2, H-3, H-4 wires pulled cut of lug. Replaced lugs. All others lugs and wires ok.

AS149-2 1Z139 5/1/79 Term. C-15, E-15, F-1, J-14, L-1 wires pulled out of lugs.

Replaced lugs. All other wires and lugs ok.

AS131-5 1Z146 5/1/79 Term c-1 wire pulled out from fug. Replaced lug. All other wirts and lugs ok.

AS137-61 1Z141 5/1/79 Tcrm E-16 not connected. Re -

UUnnected to term. All other wires and lugs ok.

AS137-77 2Z125 5/2/79 Term d-8 wire pu' led out of lua.

Replaced lug. All other wires and lugs ok.

AS137-42 2Zll5 5/2/79 Term N-13 wire pulled out of lug.

Replaced lug. All other wires and lugs ok.

AS137-40 2Z151 5/2 '79 Term D-9 insulation on wire torn and conductor shows. Re-stripped wire and replaced lug. All other wires and lugs ok.

Term B-17, G-4, G-15, J-7, J-10, AS136-5 2Z113 5/2/79 K-4 wires pullec uut or luas.

~

Replaced lugs. All other wires and lugs ok.

AS137-54 2Z141 5/3/79 Term E-9 wire and lua not connected to term. Re-connected. Ali other wires and lugs ok.

AS131-4 2Z144 5/3/79 Term D-ll and D-14 wires pulled from lucs. Replaced lugs. All other wires and lugs ok.

AS131-19 2Z133 5/3/79 Term E-13, G-10 wires pulled out of lugs. Replaced lugs. All other

.rires and lugs ok.

Term B-12, B-13, B-14, B-15 B - 1 6 ,-

AS 131-2 0 22131 5/3/79 C-2, B-17, B-18, B-19, B-20, C-1, C-3, C-4, C-5, C-6, C-7, C-8, C-9, C-10, C-ll, C-12, C-13, C-14, C-15, C-16, C-17, C-18, C-19, C-20, D-1, D-2, D-3, D-4, D-5, D-6, D-7, D-8, D-9, E-2, E-4, G-9, G-ll, G-12, G-13, G-14, G-15, H-1, H-2, H-3, H-4, H-5, H-6, H-8 . Wires pulled out of lugs. Replaced lugs. All other wires and lugs ok.

7,n an2 aq Qr L Ju/ (_ U J 43) Ud )

Page Four SAMS BECHTEL DATE

'~~

EPA EPA OF S/N S/N INSPECT. TON COMMENTS / RESULTS AS131-15 1Z103 5/2/79 All wires and lugs hand pull ok.

Term. strip F not connected like similar strips. Checked spec. at Bechtel and found the wire list.

Strip was connected from term-inals 2 thru 20. Should be con-nectec 1 thru 19. Reconnected terminal strip to the proper configuration.

A. Two EPA's (2Z152, AS131-14 and 1Z152, AS166-3) were inspected at the request of Bechtel personnel. These two EPA's were not listed in the letter dated 24 Apr 79. The following are the results of that inspection.

AS131-14 2Z152 5/3/79 All term conn., wiring & luas ok.

AS166-3 1Z152 5/3/79 Term A-1 wire pulled out of lug. Replaced lug.

Other wires and lugs ok.

B. Bechtel Engineering requested a change in the second sentenca of para. 2 on pace 4 *o read as follows:

From: "Any replacement of lugs sill be done in accordance with the Bunker Ramo approved Bechtel procedure F.P.E. 7.000, dated 1/9/79, Rev. 1."

To: "Any replacement of lugs will be done in accordance with applicable Bunker Ramo procedures with mcterials des-cribed therein". _

,/

/ f ,

/

/ l ' c)/

~

k t/s ^

/ /

~

l ti . D. Wright Quality Assurance Man er HDW/ met 11 ' ' ') R J

^