ML19241B163

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-041/03L-0,79-042/03L-0 & 79-037/03L-1
Date released: 09/12/2019 Download: ML19241B163


LER 79-037/03L-1 on 790514:supply Valves 2CV-1039-2 & CV-1076-2 to Steam Generator 2E24B Would Not Respond During Mode 3 Operation.Caused by Blown Fuse & Stuck Relay.Repairs Made & Valves Proven Operable
ML19241B166
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/06/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19241B166 (1)
LER 79-042/03L-0 on 790607:reheat Stop Valve 4 Would Not Open During Mode 1 Operation W/Main Turbine Latched. Caused by Mechanical Binding of Reheat Stop Valve to Seat. Valve Freed & Trip Tested
ML19241B165
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/06/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19241B165 (1)
LER 79-041/03L-0 on 790607:failure to Perform Surveillance Test on Containment Personnel Hatch within Specified Time Limit.Caused by Irregularity of Testing on Weekends.Testing Rescheduled to Fall on Monday,Wednesday & Friday
ML19241B164
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/06/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19241B164 (1)
Forwards LERs 79-041/03L-0,79-042/03L-0 & 79-037/03L-1
ML19241B161
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/06/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19241B161 (1)