Text

? /

ark:ANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 July 6, 1979 2-079-2 Mr. 1:. V. Seyfrit, Director Office of Inspection S Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX. 76011 Subj ec t : Arkansas Nuclear One - Unit 2 Docket No.50-36S License No. NPF-6 Reportable Occurrence Report Nos. 50-36S/79-41, 50-36S/79-42 and 50-36S/79-37 Rev.1 (File: 2-0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification

6. 9.1.9, we have attached the subj ect reports concerning non-performance of a personnel hatch seal leakage test at least once per seventy-two (72) hours when the airlock was being used for multiple entries and the turbine overspeed protection system being inoperable for less than four hours.

Also, a revision to Reportable Occurrence Report No. 50-36S/79-37 is sub-mitted to correct an error in the event description section (i.e., 2P7B should have read 2P7A) .

Very truly yours, David C. Trim .e Manager, Licensing DCT:gp AttacFaent cc: Mr. Victor Stello, Jr., Director Mr Norman M. Haller, Director Office of Inspection and Office of Managenent and Enforcement Program Analysis U. S. Nuclear Regulatory Comm- U. S. Nuclear Regulatory Comari 3 Washington, D.C. 20555 h'ashington, D. C. 20555 - f Q,

M r . h' . D. Johnson ,

s U. S. Nuclear Regulatory Comm- (f, P. O. Box 2090 '

Russellville, AR. 72801 YEVE3E A P# COLE SOUTH UTruT:ES SYSTEM 79071204 -S95 d