ML19241B161
Text
?
/
ark:ANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 July 6, 1979 2-079-2 Mr. 1:.
V. Seyfrit, Director Office of Inspection S Enforcement U. S. Nuclear Regulatory Comm.
Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX.
76011 Subj ec t :
Arkansas Nuclear One - Unit 2 Docket No.50-36S License No. NPF-6 Reportable Occurrence Report Nos. 50-36S/79-41, 50-36S/79-42 and 50-36S/79-37 Rev.1 (File: 2-0520)
Gentlemen:
In accordance with Arkansas Nuclear One - Unit 2 Technical Specification
- 6. 9.1.9, we have attached the subj ect reports concerning non-performance of a personnel hatch seal leakage test at least once per seventy-two (72) hours when the airlock was being used for multiple entries and the turbine overspeed protection system being inoperable for less than four hours.
Also, a revision to Reportable Occurrence Report No. 50-36S/79-37 is sub-mitted to correct an error in the event description section (i.e.,
2P7B should have read 2P7A).
Very truly yours, David C. Trim
.e Manager, Licensing DCT:gp AttacFaent cc:
Mr. Victor Stello, Jr., Director Mr Norman M. Haller, Director Office of Inspection and Office of Managenent and Enforcement Program Analysis U. S. Nuclear Regulatory Comm-U. S. Nuclear Regulatory Comari 3 Washington, D.C.
20555 h'ashington, D. C. 20555 -
f Q,
M r. h'. D. Johnson s
U. S. Nuclear Regulatory Comm-(f, P. O. Box 2090 79071204 -S95 0
Russellville, AR.
72801 YEVE3E A P# COLE SOUTH UTruT:ES SYSTEM d
_ __