Category:Letter type:W
MONTHYEARW3F1-2024-0049, Notification of Readiness for Supplemental Inspection2024-10-21021 October 2024 Notification of Readiness for Supplemental Inspection W3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0038, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0039, Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-09-24024 September 2024 Response to Request for Additional Information - Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0041, Reply to a Notice of Violation, EA-24-0522024-09-19019 September 2024 Reply to a Notice of Violation, EA-24-052 W3F1-2024-0040, Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days2024-09-0303 September 2024 Special Report SR 2024-001-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0019, (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 252024-07-22022 July 2024 (Waterford 3) - Steam Generator Tube Inspection Report for the 25th Rf Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0032, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-07-17017 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation W3F1-2024-0024, Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days2024-06-17017 June 2024 Special Report SR 2023-004-02 Radiation Monitor Inoperable Greater than 7 Days W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program W3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 W3F1-2024-0015, Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure2024-04-24024 April 2024 Annual Radioactive Effluent Release Report (ARERR) 2023 with Revised ODCM and Revised Process Control Program Procedure W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 20232024-04-24024 April 2024 Annual Radiological Environmental Operating Report (AREOR) - 2023 W3F1-2024-0017, Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.22062024-04-23023 April 2024 Annual Report of Individual Monitoring of Radiation Exposure for 2023 Per 10 CFR 20.2206 W3F1-2024-0020, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 20232024-04-11011 April 2024 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2023 W3F1-2024-0008, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds W3F1-2024-0009, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-03-18018 March 2024 Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles W3F1-2024-0012, Response to NRC Integrated Inspection Report 05000382/20230042024-03-11011 March 2024 Response to NRC Integrated Inspection Report 05000382/2023004 W3F1-2024-0006, Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days2024-02-28028 February 2024 Special Report SR-2023-004-01, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0056, Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242023-12-19019 December 2023 Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O2023-11-0707 November 2023 Core Operating Limits Report (COLR) - Cycle 26, Revision O W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal2023-09-28028 September 2023 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-09-25025 September 2023 Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2023-05-0404 May 2023 Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 20222023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) 2022 W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 20222023-04-27027 April 2023 Submittal of Annual Radiological Environmental Operating Report - 2022 W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.22062023-04-11011 April 2023 Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 W3F1-2023-0018, Updated Final Supplemental Response to NRC Generic Letter 2004-022023-03-30030 March 2023 Updated Final Supplemental Response to NRC Generic Letter 2004-02 W3F1-2023-0022, Registration of Dry Fuel Storage Cask Use2023-03-22022 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0021, Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days2023-03-17017 March 2023 Submittal of Special Report SR 2023-003-00 Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0016, Registration of Dry Fuel Storage Cask Use2023-03-0303 March 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2023-0013, Notification of Readiness for Supplemental Inspection2023-02-15015 February 2023 Notification of Readiness for Supplemental Inspection W3F1-2023-0007, Registration of Dry Fuel Storage Cask Use2023-02-0606 February 2023 Registration of Dry Fuel Storage Cask Use W3F1-2023-0010, Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days2023-01-25025 January 2023 Special Report SR 2023-002-00, Radiation Monitor Inoperable Greater than 7 Days W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days2023-01-0505 January 2023 SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days W3F1-2022-0067, Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-022022-12-20020 December 2022 Commitment Change Notification for Generic Safety Issue – 191 and Generic Letter 2004-02 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2022-0063, Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 372022-10-27027 October 2022 Submittal of Emergency Preparedness Documents. Includes EP-001-001, Revision 37 W3F1-2022-0059, Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-5052022-10-13013 October 2022 Response to Clarification Questions Concerning Supplement to License Amendment Request to Adopt TSTF-505 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 W3F1-2022-0037, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 242022-08-0808 August 2022 Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-07-0606 July 2022 SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days2022-06-27027 June 2022 SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. W3F1-2022-0026, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20222022-04-28028 April 2022 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2022 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2024-0011, Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program2024-05-0808 May 2024 Licensee Amendment Request to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years2021-08-25025 August 2021 Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21175A3622021-06-24024 June 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0027, Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0808 April 2021 Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0073, (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements2019-10-24024 October 2019 (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 W3F1-2018-0043, Amendment 2 to License Renewal Application2018-07-30030 July 2018 Amendment 2 to License Renewal Application W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-05-17017 May 2018 (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update2018-03-26026 March 2018 License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update W3F1-2018-0011, License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event2018-03-0808 March 2018 License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event W3F1-2017-0067, License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K3132017-12-0606 December 2017 License Amendment Request to Remove Technical Specification 3/4.3.2 Table 4.3-2 Note 3 Exemption for Testing Relays K114, K305, and K313 W3F1-2017-0065, License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations2017-11-28028 November 2017 License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations W3F1-2017-0081, Amendment 1 to License Renewal Application (Laa)2017-11-15015 November 2017 Amendment 1 to License Renewal Application (Laa) ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments W3F1-2017-0025, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2017-03-28028 March 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2016-0055, License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program2016-09-0101 September 2016 License Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Features Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program W3F1-2016-0036, Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-25025 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Rev 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code W3F1-2016-0049, Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR)2016-07-12012 July 2016 Supplement to the Risk-Informed Surveillance Requirements License Amendment Request (LAR) ML16088A3312016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 1 of 9) ML16088A3252016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 3 of 9) W3F1-2016-0012, License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9)2016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 9 of 9) ML16088A3292016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 7 of 9) ML16088A3282016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 6 of 9) ML16088A3262016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 4 of 9) ML16088A3272016-03-23023 March 2016 License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) (Part 5 of 9) W3F1-2015-0040, License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.42015-07-0202 July 2015 License Amendment Request to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 W3F1-2015-0037, License Amendment Request, Cyber Security Plan Implementation Schedule2015-06-29029 June 2015 License Amendment Request, Cyber Security Plan Implementation Schedule ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 2024-05-08
[Table view] Category:Technical Specification
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML11224A0102011-07-20020 July 2011 License Amendment Request, Technical Specification Change Regarding Steam Generator Tube Integrity W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers2008-09-18018 September 2008 License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements2007-07-0303 July 2007 License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 ML0624201532006-08-29029 August 2006 Amendment Technical Specification Pages, Moderator Temperature Coefficient W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation2006-02-15015 February 2006 License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown2005-10-27027 October 2005 License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown ML0513003032005-05-0909 May 2005 Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS Index W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2005-03-17017 March 2005 Supplement to Amendment Request NPF-38-249, Extended Power Uprate 2024-10-16
[Table view] Category:Bases Change
MONTHYEARW3F1-2024-0042, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable2024-10-16016 October 2024 License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023 Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 20042004-02-26026 February 2004 Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 20032003-07-24024 July 2003 TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 20032003-01-15015 January 2003 Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 20022002-10-14014 October 2002 Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.22002-01-31031 January 2002 Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 20022002-01-16016 January 2002 Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 ML18053A6971991-05-0808 May 1991 License Amendment Request Technical Specification Change Request NPF-38-114 2024-10-16
[Table view] |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.90 W3F1-2019-0047 August 27, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Application for Technical Specification Change to Control Room Air Conditioning System Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38 In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), Entergy Operations, Inc. (Entergy) is submitting a request for an amendment to the technical specifications (TS) for Waterford Steam Electric Station Unit 3 (Waterford 3).
The proposed amendment would modify TS surveillance requirement (SR) 4.7.6.1.d. The Enclosure to this letter provides a description and assessment of the proposed change to the Waterford 3 TS.
Attachment 1 provides the existing TS pages marked up to show the proposed changes.
Attachment 2 provides the clean pages for the TS.
Entergy requests approval of the proposed license amendment by September 1, 2020 with the amendment being implemented within 30 days to support Refueling Outage 23 (RF23).
In accordance with 10 CFR 50.91(a)(1), Notice for Public Comment, the analysis concerning the issue of no significant hazards consideration using the standards in 10 CFR 50.92 is included in Attachment 1.
In accordance with 10 CFR 50.91(b)(1), Notice for Public Comment; State Consultation, a copy of this application is being provided to the designated Louisiana Official.
W3F1-2019-0047 Enclosure Page 2 of 2 This letter contains no new commitments.
If you have any questions or require additional information, please contact Paul Wood, Regulatory Assurance Manager, at 504-464-3786.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 27, 2019.
Respectfully, Ron Gaston RWG/ajh
Enclosure:
Evaluation of the Proposed Change Attachments to
Enclosure:
- 1. Technical Specification Page Markups
- 2. Technical Specification Clean Pages cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector Louisiana Department of Environmental Quality NRC Project Manager
Enclosure W3F1-2019-0047 Evaluation of the Proposed Change
W3F1-2019-0047 Enclosure Page 1 of 6 EVALUATION OF THE PROPOSED CHANGE 1.0
SUMMARY
DESCRIPTION Entergy is requesting approval for a proposed amendment to the Technical Specifications (TS),
Appendix A of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed amendment would modify TS surveillance requirements (SR) 4.7.6.1.d.2 and 4.7.6.1.d.4 to add an exception for automatic dampers and valves that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, or defueled, in order to consider the SR met. This request is being made to facilitate fuel movement with one train of the Control Room Emergency Air Filtration System (CREAFS) with its associated outside air intake valves inoperable due to planned electrical bus or static uninterruptable power supply (SUPS) outage.
The continuation of fuel movement with one train of CREAFS inoperable was reviewed and approved by the NRC in TS Amendment 218 and described in the associated safety evaluation (SE) (Reference 5.1). With a planned bus outage on a given train, the CREAFS system would be manually placed in the "ISOLATE" mode, which closes the outside air intake and exhaust valves that are part of the Control Room Envelope (CRE) boundary, and then power would be removed. The current SRs, as written, would not be met for the valves on the train which was deenergized since the automatic outside air intake and exhaust valves would already be deenergized in their actuated positions. Similarly, a planned SUPS outage that removes the capability of generating a test signal would also result in an unmet SR. The requested SR exception is consistent with the Amendment 218 SE discussion concerning fuel movement which states, "When one train is inoperable, placing the operable train in service ensures that the safety function can be carried out if an accident occurs."
Securing the automatic valves or dampers in the actuated position may affect the operability of the system depending on the mode of operation. The CREAFS meets its safety function requirements during Modes 5, 6, and defueled when the automatic valves or dampers are in the closed position. During fuel movement in Modes 5, 6, and defueled, Engineering Calculation ECS04-011, "Fuel Handling Accident (FHA) Alternative Source Term (AST) Radiological Dose Consequences for 3716 MWt Extended Power Uprate (EPU)," (Reference 5.2) demonstrates that the isolate mode for air makeup meets system operability requirements for the duration of the event. Therefore, aligning the system to comply with Action "d" during a maintenance bus outage in Modes 5, 6, and defueled is acceptable, maintains system operability, and aligns with the NRC's approval of TS Amendment 218.
2.0 DETAILED DESCRIPTION
2.1 System Description
The CREAFS provides a protected environment from which operators can control the unit, during airborne challenges from radioactivity, hazardous chemicals, and fire byproducts, such as fire suppression agents and smoke, during normal and accident conditions.
The CREAFS is designed to maintain a habitable environment in the CRE for 30 days of continuous occupancy after a design-basis accident (DBA) without exceeding a 5 Roentgen
W3F1-2019-0047 Enclosure Page 2 of 6 equivalent man (Rem) whole body dose or its equivalent to any part of the body, 5 Rem total effective dose equivalent (TEDE).
The CREAFS consists of two redundant trains, each capable of maintaining the habitability of the CRE. The CREAFS is considered operable when the individual components necessary to limit operator exposure are operable in both trains. A CREAFS train is considered operable when the associated:
Fan is operable High-efficiency particulate air (HEPA) filters and charcoal adsorbers are not excessively restricting flow, and are capable of performing their filtration functions; and Heater, demister, ductwork, valves, and dampers are operable, and air circulation can be maintained.
The CRE boundary is considered operable when the measured unfiltered air inleakage is less than or equal to the inleakage value assumed by the licensing basis analysis of DBA consequences to CRE occupants.
The outside air intake and exhaust valves isolate the control room from the outside environment and provide a flowpath between the various components in the control room ventilation system.
Depending on the nature of any abnormal condition(s) of one or more of these valves, the impact on the safety system function differs. Excessive leakage in the closed position may impact the CRE boundary function. Excessive closure time may challenge time response limits but not boundary leakage requirements. Closed valves which have acceptable leakage performance that are subsequently deenergized do not impact CRE boundary operability. Also, some of these valves have additional safety system functional requirements in the open position in Modes 1 through 4 following an accident.
2.2 Reason for Proposed Change On February 20, 2009, the NRC issued Amendment 218 which implements changes consistent with Technical Specification Task Force (TSTF) Traveler TSTF-448, "Control Room Habitability," Revision 3 (Reference 5.3). The NRC's SE for TS Amendment 218 states that adopting TSTF-448 will better assure that the Waterford 3 CRE will remain habitable during normal operation and DBA conditions.
Section 3.2 of the Amendment 218 SE specifically addresses the situation when one CREAFS is inoperable during movement of irradiated fuel assemblies. The Actions consist of either suspending movement with or over irradiated fuel assemblies or placing the operable train in service in the emergency radiation protection mode after 7 days (TS LCO Action 3.7.6.1.d). The SE states that placing the operable train in service ensures that the safety function can be carried out if an accident occurs. Engineering Calculation ECS04-011 (Reference 5.2) demonstrates that the isolate mode for air makeup meets system operability requirements for the duration of the event.
This request is being made to facilitate fuel movement with one train of the CREAFS inoperable due to planned electrical bus or SUPS outage. The continuation of fuel movement with one train of CREAFS inoperable was reviewed and approved by the NRC in TS Amendment 218 and described in the associated SE. Prior to a planned bus outage on a given train, the
W3F1-2019-0047 Enclosure Page 3 of 6 CREAFS system would be placed in the "ISOLATE" mode, which closes the outside air intake valves that are part of the Control Room Envelope (CRE) boundary, and then power would be removed. The current SRs, as written, would not be met for the valves on the train which was deenergized since the automatic outside airflow path valves would already be deenergized in their actuated (closed) positions. Similarly, a planned SUPS outage that removes the capability of generating a test signal would also result in an unmet SR. The requested SR exception is consistent with the Amendment 218 SE discussion concerning fuel movement which states, "When one train is inoperable, placing the operable train in service ensures that the safety function can be carried out if an accident occurs."
2.3 Description of Proposed Change The following text is added to the end of TS SRs 4.7.6.1.d.2 and 4.7.6.1.d.4 as shown in :
", except for dampers and valves that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, or defueled."
2.4 Justification for Change It is recognized that the industry and the NRC are working toward approval of TSTF-541, Revision 2, "Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position." It is also acknowledged that the Waterford 3 TS LCO 3.7.6.1 would be eligible to be included in a future TSTF-541 submittal. However, Entergy is requesting NRC approval of the change to these two TS SRs for the following reasons:
- 1. Approval of the requested change to SR 4.7.6.1.d.2 and 4.7.6.1.d.4 will allow electrical bus outage work to occur coincident with fuel movement during the upcoming refueling outage in Fall 2020. The expected timeline for approval of TSTF-541 followed by generation and approval of a site submittal would not support the 2020 Fall outage.
- 2. The exact scenario of fuel movement with an inoperable CREAFS train was previously evaluated and accepted by the NRC as documented in the Amendment 218 SE.
- 3. As described in section 2.2 in the SE for Amendment 218, the CRE boundary is considered operable when the measured unfiltered air inleakage is less than or equal to the inleakage value assumed by the licensing basis analysis of DBA consequences to CRE occupants.
Removing power from closed boundary valves which have demonstrated acceptable leak tightness to support unfiltered air inleakage requirements does not render the CRE boundary inoperable. This distinction is necessary during fuel movement coincident with a planned bus outage. The bus outage would render the CREAFS unit and valves on the affected train inoperable. With the affected CRE boundary valves deenergized closed, they are inoperable from a repositioning capability aspect, but their leak tightness condition is unaffected and the CRE boundary remains OPERABLE. Therefore, LCO 3.7.6.1 Action "e" would not be entered in this situation and fuel movement could continue.
W3F1-2019-0047 Enclosure Page 4 of 6
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination Entergy has evaluated the proposed changes to the Technical Specifications (TS) using the criteria in 10 CFR 50.92 and has determined that the proposed changes do not involve a significant hazards consideration.
- 1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises TS surveillance requirements (SR) 4.7.6.1.d.2 and 4.7.6.1.d.4 by adding exceptions which allow excluding from actuation testing those valves and dampers that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, and defueled. The performance or lack of performance of an SR is not an initiator of any accident previously evaluated. As a result, the proposed change has no effect on the probability of any accident previously evaluated. The proposed change excludes performance of portions of the SR, but the system must still be capable of performing the safety functions assumed in the accident analysis. Otherwise, the system is inoperable, and the associated TS Actions are followed. As a result, the system continues to perform its mitigating functions and the consequences of any accident previously evaluated are not affected.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises an SR by adding exceptions which allow excluding from actuation testing those valves and dampers that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, and defueled. The proposed change will not change the design function or operability requirements of the affected system. The system must still be capable of performing the safety functions assumed in the accident analysis, or the system is inoperable, and the associated TS Actions are followed. The proposed change does not create any credible new failure mechanisms, malfunctions, or accident initiators not considered in the design and licensing bases.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
W3F1-2019-0047 Enclosure Page 5 of 6
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
Response: No.
The proposed change revises two SRs by adding exceptions which allow excluding from actuation testing those valves and dampers that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6 and defueled. The proposed change does not alter the manner in which safety limits, limiting safety system settings, or limiting conditions for operation are determined. The safety analysis assumptions and acceptance criteria are not affected by this change.
Therefore, the proposed changes do not involve a significant reduction in a margin of safety.
Based on the above, Entergy concludes that the proposed changes present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
3.2 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
4.0 ENVIRONMENTAL EVALUATION The proposed changes would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed changes do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed changes meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed changes.
W3F1-2019-0047 Enclosure Page 6 of 6
5.0 REFERENCES
5.1 NRC Letter, "Waterford Steam Electric Station, Unit 3 - Issuance of Amendment RE:
Modification of Requirements Regarding Control Room Habitability" (ADAMS Accession No. ML090360713), dated February 20, 2009.
5.2 Engineering Calculation ECS04-01, Revision 0, "Fuel Handling Accident (FHA) Alternative Source Term (AST) Radiological Dose Consequences for 3716 MWt Extended Power Uprate (EPU)," dated September 1, 2004.
5.3 Technical Specification Task Force (TSTF) Traveler TSTF-448, "Control Room Habitability,"
Revision 3 (ADAMS Accession No. ML090360713), dated August 8, 2006.
Enclosure, Attachment 1 W3F1-2019-0047 Technical Specifications Page Markups
PLANT SYSTEMS
- 2. Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5% when tested in accordance with A STM 03803-1989 at a temperature of 30° C and a relative humidity of 70%.
- 3. Verifying a system flow rate of 4225 cfm 10% during train operation when tested in accordance with ANSI N510-1975.
- c. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5%
when tested in accordance with ASTM 03803-1989 at a temperature of 30 ° C and a relative humidity of 70%.
- d. In accordance with the Surveillance Frequency Control Program by:
- 1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.8 inches water gauge while operating the train at a flow rate of 4225 cfm +/- 10%.
- 2. Verifying that on a safety injection actuation test signal or a high radiation test signal, the train automatically switches into a recirculation mode of operation with flow through the HEPA filters and charcoal adsorber banks and the normal outside airflow paths isolate.
Add Insert 1
- 3. Verifying that heaters dissipate 10 +1.0, -1.0 kW when tested in accordance with ANSI N510-1975.
- 4. Verifying that on a toxic gas detection signal, the system automatically switches to the isolation mode of operation. Add Insert 1
- e. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/- 10%.
- f. After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/- 10%.
- g. Perform required control room envelope unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
WATERFORD - UNIT 3 3/4 7-17 AMENDMENT NO. 115,170,194,218,249
W3F1-2019-0047 Enclosure, Attachment 1 Page 2 of 2 INSERT 1
", except for dampers and valves that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, or defueled."
Enclosure, Attachment 2 W3F1-2019-0047 Technical Specifications Clean Pages
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- 2. Verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5% when tested in accordance with ASTM D3803-1989 at a temperature of 30°C and a relative humidity of 70%.
- 3. Verifying a system flow rate of 4225 cfm +/- 10% during train operation when tested in accordance with ANSI N510-1975.
- c. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 0.5%
when tested in accordance with ASTM 03803-1989 at a temperature of 30°C and a relative humidity of 70%.
- d. In accordance with the Surveillance Frequency Control Program by:
- 1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 7.8 inches water gauge while operating the train at a flow rate of 4225 cfm +/- 10%.
- 2. Verifying that on a safety injection actuation test signal or a high radiation test signal, the train automatically switches into a recirculation mode of operation with flow through the HEPA filters and charcoal adsorber banks and the normal outside airflow paths isolate, except for dampers and valves that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, or defueled.
- 3. Verifying that heaters dissipate 10 +1.0, -1.0 kW when tested in accordance with ANSI N510-1975.
- 4. Verifying that on a toxic gas detection signal, the system automatically switches to the isolation mode of operation, except for dampers and valves that are locked, sealed, or otherwise secured in the actuated position in Modes 5, 6, or defueled.
- e. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/- 10%.
- f. After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the train at a flow rate of 4225 cfm +/- 10%.
- g. Perform required control room envelope unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
WATERFORD - UNIT 3 3/4 717 AMENDMENT NO. 115, 170, 194, 218, 249