ML19225D042
| ML19225D042 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/25/1979 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19225D033 | List: |
| References | |
| NUDOCS 7908030626 | |
| Download: ML19225D042 (2) | |
See also: IR 05000269/1979009
Text
DirRi?.t TP"T"'TD r"'NITH
CONU,uS 2.7;3 tI"....AT10N
.
-
o na
,
'o
UNITED STATES
+8'
" ,7,
NUCLEAR REGULATORY COMMISSION
.,
$4
E
REGION 11
'
og
[
101 MARIETT A ST., N.W., SUITE 310o
AT LANT A, G EORGI A 30303
j*
.....
MAY 251979
In Reply Refer To:
RII:JMF
50-269/79-9
50-270/79-9
50-287/79-9
g
.f;i
0:}g.
l
'g
Duke Power Company
)
1
]~
ATTN:
W. O. Parker, Jr.
2
Vice President, Steam Productior
P. O. Box 33189
Charlotte, N C 28242
Gentlemen:
This refers to the inspection conducted by J. M. Fuchko of this office on
April 9-13, 1979, of activities authorized by NRC Operating License Nos. DPR-38,
DPR-47 and DPR-55 at Oconee 1, 2 and 3 and to the discussion of our findings
held with J. H. Davis at the conclusion of the inspection.
The area examined during this inspection was your physical protection program
under the 2pplicable provisions of Title 10, Code of Federal Regulations,
Part 73, " Physical Protection of Plants and Materials." Within this area,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by the
inspectors.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was fcund that certain activities under your
These items
license appear to be in noncompliance with NRC requirements.
and references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations. Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further noncompliance; and (3) the date when full compliance will be achieved.
Details of activities involving safeguards and security measures are exempt
from disclosure in accordance with 10 CFR 2.790(d). Therefore, your response
should be incorporated in a separate paper and referenced in your reply.
79 0803 06k
i13
wws 2n .... .. ?
mt Ter"n:.U.?
'
QTERB.L TR!.?.SM'TTED HEREWITH
'
.
CONTAINS 2.7S312iC. .AT10M
T
.
Duke Power Company
-2-
MAY 251979
'
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter with the exception of the report cover page, which is an
inspection sunxnary, will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sin erely,
W
'
(
Kenna, Chief
'
.
.
SafeguardsfBranch
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt from Disclosure)
2.
Inspection Report Nos. 50-269/79-9,
50-270/79-9 and 50-287/79-9
(Exempt from Disclosure)
3.
Inspection Sunnary
(Not Exempt)
,
cc w/encls:
J. E. Smith, Station Manager
P. O. Box 1175
Seneca, S C 29678
h
..
uTmunn~moe m
CONT Anis 2.701.iii,0.'.'.All3 N