ML19225C122
| ML19225C122 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/12/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19225C114 | List: |
| References | |
| NUDOCS 7907260517 | |
| Download: ML19225C122 (2) | |
See also: IR 05000348/1979017
Text
e
[QR REGugo
UNITED STATES
? \\
,3
- ,'n
NUCLEAR REGULATORY COMMISSION
5
' ". g/ E
REGION 11
.
s
I
8
101 MARIETTA sT., N.W., sutTE 3100
o,
pr
%* ' % ,. :
[
ATLAN30N 1 21979
GEORGI A 30303
'
.....
In Reply Refer To:
RII:JJB
50-348/79-17
50-364/79-07
Alabama Power Company
A'iTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by J. J. Blake of this office on April 24-
26 and May 16-19, 1979, of activities authorized by NRC License No. NPF-2 and
Construction Permit No. CPPR-86 for the Farley Nuclear Plant Units 1 and 2
facility, and to the discussion of our findings held with Messrs. J. A. Mooney
and W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findir.gs are discussed in the enclosed
inspection report. Within these areas, the inspection consisted of selective exam-
inations of procedures and representative records, interviews with personnel, and
observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
One inspector follow-up item was identified during this inspection to track the
Plant Manager's commitment to continue the surveillance of the flow splitter
integrity by conducting ultrasonic inspections during the next refueling.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of f ederal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any informatior, that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this of fice to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
7907 26en?
4
m.,
~_
Y , ) ~ ~- l
413
206
.
._
-
.-
.
,
JUN 121979
Alabama Power Company
.
-2-
Should you have any questions concerning this letter, we will be glad to dis
them with you.
cuss
Sincerely,
2
- )
Charles E.
urphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-348/79-17
and 50-364/79-07
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
,
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
,
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
413
2047