U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
Region I
Report No. 50-57/79-02
Docket No. 50-57
License No. R-77
Priority
--
Category
C
Licensee:
State University of New York at Buffalo
Rotary Road
Buffalo, New York
14214
Facility Name:
Nuclear Science and Technology Facility
Inspection at:
Buffalo, New York
Inspection conductqd: March 13-15,1979
Inspectors:
M
h/M/V/D
1'/3!79
W. J. Raymonf Reactor Inspector
date signed
'
date signed
~
date signed
Approved by:
@ jM
I
+/N /19
E. 'C. McCabe, Jr.,' Chief, Reactor Projects
date signed
Section No. 2, RO&NS Branch
Inspection Summary:
Ins pection on March 13-15,1979 (Report No. E0-57/79-02)
Xh as Inspected:
Routine, unannounced operations inspection by a
regional based inspector of facility organization, logs and records;
requalification training program; Safety Committee review and audit;
licensee action on bulletins and circulars facility operational status;
and status of previous inspection findings.
The inspection invulved
15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> onsite by one NRC inspector.
Results: Of the six areas inspected, no items of noncompliance were
identified in five areas; one apparent item of noncompl' . ice was
identified in one area (Infraction - Failure to provide NSC review
of operating procedures, Paragraph 5).
79072004zo
Region I Form 12
744
nnr
(Rev. April 77)
Juu
UUd
.
.
DETAILS
1.
Persons Contacted
- Dr. W. Chon, Acting Director
Mr. L. Henry, Radiation Protection Department
- Mr. P. Orlosky, Operations Manager
The inspector interviewed other licensee personnel during the
inspection, including members of the operations and office staff,
- denotes those present at the exit interview.
2.
Licensee Action on Previous Inspection Findings
(Closed) Followup Item (57/77-04-04):
Report Submittal.
The
1977-197810 CFR 50.59 Report of Changes, Tests, and Experiments,
dated August 29, 1978, was transmitted by the licensee to the
appropriate address.
This item is closed.
(Closed) Unresolved Item (67/77-01-03):
Staff Training.
Internal
memorandum number 302.5, da ed March 24, 1977, provides documenta-
tion of the meeting held .<ith the entire NSTF staff, including
all clerical staff, to discuss and explcl high radiation area
control and posting at NSTF. This item i:, closed.
(Closed) Unresolved Item (57/78-03-03): OP-5 Update.
Procedure
OP-5, Routine Startup Procedure - Startup for Full Power Operation,
dated August 1978, was revised uo incorporate guidelines to allow
differing primary and secondary coolant pump operating conditions
depending upon ambient and reactor coolant temperatures.
This
item is resolved.
(Closed) Unresolved Item (5.7/78-03-02):
OP-1 Update.
The Addendum
to Procedure OP-1, dated August 1978, provides administrative
controls governing temporary procedure changes and allowable
deviations from established procedures.
This item is resolved.
(Closed) Unresolved Item (57/78-03-04):
Irradiation Request Forms.
The licensee has issued a new irradiation request form, entitled
Service Request cnd Experiment Safety Analysis Form, which ncor-
porates the safety analysis performed for each experiment conducted.
The inspector verified through a sampling review of service request
forms that the accompanying safety analyses were incorporated.
This item is resolved.
366
009
.
3
(Closed) Noncompliance (57/78-03-05):
Isotope Production Facility
Irradiation Procedure.
The licensee has issued Procedure OP-49,
Use of Isotope Production Facility, dated August 1978.
The inspec-
tor reviewed the procedure for technical content and no inadequacies
were identified.
This item is resolved.
(0 pen) Unresolved Item (57/78-01-02):
NSC Safety Review.
The
licensee stated that a facility nuclear safety review by the NSC
was planned for the Spring of 1979.
During a telephone conversa-
tion with Dr. Chon on March 23, 1979, the inspector was informed
that a staff nuclear engineer on campus will be employed by the
NSC to conduct an NSTF facility audit.
The audit will include a
review of facility documentation and operating procedures, and
will be complet j by April 15, 1979.
This item remains unresolved
pending compleu.on of the subject audit, review and acceptance of
the audit results by the full NSC Committee, and subsequent review
by NRC: Region I.
3.
Operator Requalification Program
Requalification training performed in 1978 was reviewed to verify
conformance with regulatory requiremente.
a.
References
1978 Operator Requalification Program Lecture Scheduled
--
1978 Requalification Exam and Answers
--
Internal Memorandum from Operations Manager to all
--
Operators dated December 5, 1978
b.
Scope
The following items were verified during this review:
(1) All operators currentiy employed at the facility partici-
pated in the requalification program.
The inspector
noted that three individuals are candidates for new
licenses.
366
010
.
.
4
(2)
Records maintained as required by the Requalification
Program include the following:
(a)
Individual examinations, including corrected examination
results;
(b) Documentation of required manipulation;
(c) Operator performance evaluation; and,
(d) Records of Attendance at program lectures.
(3) Verification that Requalification Program requirements
are implemented for the following:
(a) Conduct of lectures - records of lecture times,
dates, and attendance maintained to verify complf-
ance with program;
(b) Operator review of abnormal and emergency procedures,
including evaluation of operator response to simu-
lated emergencies;
(c) Oral re-examination for those individuals scoring
less than 80% on the requalification exams; and,
(d) Operator review of changes and modifications to the
facility, including annual review of facility procedures.
No it. adequacies were identified duri"g this review and, except
as noted below, the inspector had no further comments in this
area.
c.
Findings
A file of memoranda issued to all operators to describe
facility modifications is maintained by the Operations Manager.
The inspector noted that verification of operator review of
the subject memos is not maintained.
The Operations fianager
stated that such a provision would incorporated in the Requalification
Program record requirements.
The insoector noted through
discussior with the licensee that all ooerators were directly
involved w ;h the reactor modifications completed during 1978
and that operating procedure changes necessitated by the
modifications were reviewed.
This item will be followed on a
subsequentinspection(57/79-02-01).
366
011
5
4.
Orcanization, Logs and Records
Licensee organization and selected facility records were reviewed
to ascertain conformance Lith regulatory and licensee administrative
requirements.
a.
Organization and Staffina
Facility organization and staffing were reviewed to verify
compliance with the Technical Specifications and 10 CFR 50
requirements.
The inspector determined through a sampling
review of the Operator's Log and by direct observation that
the shift composition mot the requirements of TS 0.2.d.
No
significant organizational or staffing changes have occurred
since the last inspection in this area (reference:
NRC: Region
I Inspection Report 50-57/78-03).
Three individuals (students)
holding a facility license have terminated activity at NSTF
upon graduation from SUNY in December,1978.
Three new students
are presently candidates for facility licenses; invcivement
of these individuals with facility operation is being limited
pending license issuance.
No items of noncompliance were ident;fied.
b.
Operation and Maintenance logs
Facility records listed below were reviewed for the periods
indicated to verify that (i) operator logs are descriptive
and complete; (ii) operating parameters are maintained within
Technical Specification limits; (iii) maintenance activities
were conducted in accordance with administrative requirer, ants;
and, (iv) no abnernal operational cenditions exist, other
than those previously reported by the licensee to the NRC.
--
Control Operator's Log, March 3,1978 to December 1,1978
Primary Water Log (Additions), March 10, 1978 to March
--
6, 1979
--
Maintenance Log, February 6,1978 to March 2,1979
--
Log N Strip Chart Recording, November 8-22, 1978
366
012
6
The inspector noced that modifications made to replace primary
piping have been reviewed by NRC: Region I, as documented in
Region I Inspection Reports 50-57/77-04 and 50-57/78-01.
The
inspector noted that,: based on a review of the primary water
addition log, water additions to the reactor pool curing the
period December 28, 1978 to March 6,1979, averaged less than
40 gallons per de, and represent the amount required to make
up for normal evaporative losses and operational leakage.
The following activities were also reviewed during this inspec-
tion:
(i) control rod insertion time measurements conducted
June 23, 1978 and January 30,1979; (ii) insertion. of test
coupon #97 into the secondary system to monitor any corrosion
associated with the new water treatment process, December 1,
1978; and, (iii) work conducted on September 9 and October 6,
1978 to replace sar 'le tubing on the primary side of the heat
exchanger and to replace a drain connector on the secondary
site outlet of the heat exchanger.
No items of noncompliance were identified.
5.
Eeview and Audit
Activities of the Operating Committee and the Nuclear Safety
Committee (NSC) in 1978 were reviewed to verify compliance with
Technical Specification and administrative requirements, including
the following specific items:
Committee member qualifications
--
Committee meeting frequency and auorua
--
--
Review of experiments and tests, and implementation of com-
mittee recomendation relating 'to experiments
--
Review and approval of facility design changes and modifica-
tions
Conduct of facility audits
--
366
013
7
Facility records and references used during this review included
the following:
Techncial Specifications N and 0
--
NSC Charter and Dylaws, dated May 18, 1977
--
Operating Committee meeting minutes for March 20, July 7, June
--
24, July 19, August 1, August 8,1978 and January 5,1979
--
NSC meeting minutes for December 16, 1977, May 1, 1978, and
November 17, 1978
--
NSTF 10 CFR 50.59 report to NRC dated August 29, 1978
Operating Procedures OP-2, 22, 23, 24, 48, 51, and 54
--
Facility Drawing Nos. M-1, M-2, and M-3 (J. Foruchtbaum Associates)
--
dated February 28, 1977
Experiments designated as Jobs 748-2TCT, 748 standard, J-622
--
--
Operator t.og for February 13, 1979, June 14, 1978, and April
18, 1978
--
Reuter Strokes Test Procedures for In-Core Flux Mapping
Probes, RS-SOP-860 series procedures for Job No. 622
Within the scope of the above and except as noted below, the
inspector had no further comments on safety committee activities.
a.
NSC Audit Functions
Technical Specification N.2.a and the Charter of the NSC
iequires that operating procedures reviewed and
approved by the Operating Committee be subject to review
by the NSC.
The procedures defined to be within the scope
of the NSC review include those for reactor operation, main-
tenance and emergency operations.
Although all procedures
examined by the inspector during this inspection have been
reviewed and approved for use by the Operating Comittee,
none of the facility procedures examined have been subject
to review by the NSC.
This constitutes an item of noncom-
pliance with Technical Specification N.2.a (57/79-02-02).
366
014
.
-
8
The licensee stated it was not the intent for the NSC to review
each operating procedure in detail, but to provide NSC reviews
as requested by the Operating Committee when expertise ~in a
specific area was required.
The licensee further stated his
intent to revise / clarify the subject requirement in the new
Technical Specifications to be submitted for renewal of the
facility license in November,1979.
In a telephone conversa-
tion on March 23, 1979, the licensee stated that a review of
facility operating procedures will be included in the NSC audit
of facility safety (as discussed in Paragraph 2 above).
6.
Facility Tours
Inspection tours of the facility were conducted during the period
from March 13 to March 15, 1979 to observe the overall facility
operation status.
Inspector observations included a witnessing
of a facility startup on March 13, 1979, following a shutdown
to rearrcr.ce experiments in progress.
Facility areas toured
included: ' operations, gamma and neutron ceck, including associated
laboratories; reactor control room; hot cell manipulator room;
switchgear room; heating and ventilation room; primary coolant
pump room; student laboratories; and, cold fuel storage vault.
General housekeeping and radiation protection controls in the
areas toured were discussed with the Operations Supervisor.
No inadequacies were identified.
7.
Bulletin / Circular Followup
The bulletins and circulars listed below were reviewed with the
Op' ratiord Manager to verify that (i) copies of the bulletins /circu-
lars were received and reviewed for applicability to the NSTF
facility; (ii) bulletin responses were submitted to the NRC in
the time required; and, (iii) licensee reviews and dispositioning
of problems identified by the bulletins / circulars are supported
by facility records and physical installations.
--
IEC 77-14, Separation of Contaminated Water Systems from
Non-Contaminated Plant Systems
--
IEB 78-07, Protection Afforded by Air Line Respirators and
Supplied Air Hoods
366
OB
-
.
9
IEB 78-08, Radiation Levels from Fuel Transfer Tubes
--
The licensee's reviews of these items concluded that facility
designs and practices required no additional actions to be taken
in these areas.
No items of noncompliance were identified.
8.
Exit Interview
A management meeting was held with licensee representatives (denoted
in Paragraph 1) at the conclusion of the inspection on March 15,
1979.
The purpose, scope, and findings of the inspection were
dise.ussed as they appear in the details of this report.
The
licensee acknowledged the apparent item of noncompliance with
TS N.2.a.
Licensee plans to: provide ~ procedure reviews.by
the N,SC'.were discussed in a telephone conversation with Dr. Chon
on March 23, 1979. The licensee stated that a copy of the draft
Technical Specifications would be forwarded for NRC: Region I
review pending: completion of the NSC review of the proposed
specifications.
,
366
r16