Forwards IE Insp Repts 50-546/79-03 & 50-547/79-03 on 790403-06,notice of Violation & Notice of Deviation
ML19225A129
Person / Time
Site: Marble Hill
Issue date: 05/04/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Coughlin J
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML19225A130 List:
References
NUDOCS 7907180456
Download: ML19225A129 (2)


See also: IR 05000546/1979003

Text

T

TIC

-

,

d

4,

UNITED STATES

jh

y

NUCLE AR REGULATORY COMMISSION

j ,l{g.

g

REGloN lil

g 4; "gjt

799 RooSE VE LT RC AD

' - . 40 g

GLE N E LL N N IL LINOIS 60137

o

  • ...*

RAY 4

W3

_

Docket No. 50-546

Docket No. 50-547

Public Service of Indiana

ATTN:

Dr. James Coughlin

Vice President - Nuclear

1000 East Main Street

Plainfield, IN 46168

Gentlemen:

This refers to the inspection conducted by Messers. E.

R.

Schweibinz,

F. C. Ilawkins, and J. F. Suerrann of this office on April 3-6, 1979, of

activities at the Marble Hill Nuclear Generating Station, Units 1 and 2,

authorized by NRC Construction Pernits No. CPPR-170 and No. CPPR-171 and

to the discussion of our findings with Messrs. R. M. Brown, T. L. McLarty

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.2Cl

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice a written statement or

explanation in reply, including for each item of noncompliance: (1)

corrective action taken and the results achiev2d; (2) correc tive ac tion

to be taken to avoid further noncompliance; and (3) the date when full

compliance will be achieved.

Certain other activities, set forth in the enclosed Appendix B to this

letter, appear to be a deviation from connittents which you have cade in

previous correspondence with the Commission. Please advise us in

writing within thirty days of the corrective action you have taken or

plan to take, showing the estimated date of completion with regard to

this deviation.

. th

347

063

7907180 g 9

.

.

Public Service of Indiana

-2-

MAY 4

19 79

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

NRC's Public Document Room, except as follows.

If the enclosures

contain information that you or your contractors believe to be

proprietary, you must apply in writing to this of fice, within twenty

days of your receipt of this letter, to withhold such information from

public disclosure.

The application must include a full statement of the

reasons for which the information is considered proprietary, and should

be prepared so that proprietary information identified in the appli-

cation is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

^

, -

f t.'

G.~~Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A,

Notice

of Violation

2.

Appendix B, Notice

of Deviation

3.

IE Inspection Reports

No. 50-546/79-03 and

No. 50-547/79-03

cc w/encls:

R. M. Brown, Construction

Project Superintendent

Central Files

Reproduction Unit NRC 20b

,