Forwards IE Insp Repts 50-295/79-08 & 50-304/79-09 on 790406,10,11 & 23-27 & Notice of Violation
ML19225A086
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/16/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19225A087 List:
References
NUDOCS 7907180274
Download: ML19225A086 (2)


See also: IR 05000295/1979008

Text

T

,

TIC

[N

g

UNITED STATES

f

.k

NUCLEAR REGULATORY COMMISSION

f. g40

f

[

REGION lil

.. mm

g

799 RooSE VE LT RC AD

/

ct E s e t t v s. ictis,is e.,ois7

.....

MAY 161979

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

AT T;':

Mr. Byron Lee, Jr.

Vice Presicent

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by iiessrs. J.

E. Kohler

and D.

C.

Psyd of this office on April 6, 1( , 11 arw 23-27, 1979,

of activities at the Zion Nuclear Power Station, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-39 cnd No. DPR-48

and to the discussion of our findings with Mr. N.

E. Wandke at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

' spection consisted of a selective examination of procedures

ata representative records, obs e rva t ion s , and interviews with

personnel.

During this inspection, certain of your activities appeared to be

in noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This is the second item of noncompliance so far this

year in the auxiliacy electrical area.

The first item of noncom-

pliance is documented in RIII Inspection Report 50-295/79-01.

We

feel that additional action must be taken in the auxiliary elec-

trical area to insure that the requirements in Section 3.15 of

the Technical Specifications are not violated.

Consequently, in

your response to this item, as requested below, please include

your plans to augment the surveillance in the auxiliary electrical

area to insure that all ESF buses are aligned to their proper

power sources.

This not.ce is sent to you pursuant co the provisions of >ection

2.201 of the NRC's " Rules of Practice," Part 2, Titic 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this

office within twenty days of your receipt of this notice a written

statement or explanation in reply, including lor each item of non-

compliance:

(1) corrective action taken and the results achieved;

(2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

_ >,q

7 '; n

,

J !. O

J<"

W

907180 M 7 k

.

.

Commonwealth Edison

-2-

pjy y n g7g

Company

In accordance with Section 2.790 of the NRC's " Rules of Practace,"

Part 2, Title 10, Code of Federal Regul.itions, a copy of this

latter, the enclosures, and your response to this letter vill be

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this

of fice, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application

must include a full statement of the reasons for which the infor-

mation is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning thic

inspection.

Sincerely,

9

R.

F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-295/79-08 and

No. 50-304/79-09

cc w/encls:

Mr. N. Wandke, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General