T
,
[N
g
UNITED STATES
f
.k
NUCLEAR REGULATORY COMMISSION
f. g40
f
[
REGION lil
.. mm
g
799 RooSE VE LT RC AD
/
ct E s e t t v s. ictis,is e.,ois7
.....
MAY 161979
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
AT T;':
Mr. Byron Lee, Jr.
Vice Presicent
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by iiessrs. J.
E. Kohler
and D.
C.
Psyd of this office on April 6, 1( , 11 arw 23-27, 1979,
of activities at the Zion Nuclear Power Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-39 cnd No. DPR-48
and to the discussion of our findings with Mr. N.
E. Wandke at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
' spection consisted of a selective examination of procedures
ata representative records, obs e rva t ion s , and interviews with
personnel.
During this inspection, certain of your activities appeared to be
in noncompliance with NRC requirements, as described in the enclosed
Appendix A.
This is the second item of noncompliance so far this
year in the auxiliacy electrical area.
The first item of noncom-
pliance is documented in RIII Inspection Report 50-295/79-01.
We
feel that additional action must be taken in the auxiliary elec-
trical area to insure that the requirements in Section 3.15 of
the Technical Specifications are not violated.
Consequently, in
your response to this item, as requested below, please include
your plans to augment the surveillance in the auxiliary electrical
area to insure that all ESF buses are aligned to their proper
power sources.
This not.ce is sent to you pursuant co the provisions of >ection
2.201 of the NRC's " Rules of Practice," Part 2, Titic 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this
office within twenty days of your receipt of this notice a written
statement or explanation in reply, including lor each item of non-
compliance:
(1) corrective action taken and the results achieved;
(2) corrective action to be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
_ >,q
7 '; n
,
J !. O
J<"
W
907180 M 7 k
.
.
Commonwealth Edison
-2-
pjy y n g7g
Company
In accordance with Section 2.790 of the NRC's " Rules of Practace,"
Part 2, Title 10, Code of Federal Regul.itions, a copy of this
latter, the enclosures, and your response to this letter vill be
placed in the NRC's Public Document Room, except as follows.
If
the enclosures contain information that you or your contractors
believe to be proprietary, you must apply in writing to this
of fice, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application
must include a full statement of the reasons for which the infor-
mation is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained
in an enclosure to the application.
We will gladly discuss any questions you have concerning thic
inspection.
Sincerely,
9
R.
F. Heishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-295/79-08 and
No. 50-304/79-09
cc w/encls:
Mr. N. Wandke, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
", 5 )
)qnf.O
""