Forwards IE Info Notice 79-34, Inadequate Design of Safety- Related Heat Exchangers. No Action or Response Required
ML19211C057
Person / Time
Site: Davis Besse 
Issue date: 12/27/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8001100021
Download: ML19211C057 (1)


Text

!(

o,,

g UNITED STATES NUCLEAR REGULATORY COMMISSION g

r REGION 111 8

795 ROOSEVELT ROAD o,

E

%, * * * *

  • o GLEN ELLYN. lLLINOIS 60137 Docket No. 50-346 Toledo Edison Company ATTN:

Mr. Richard P. Crouse Vice President Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the infor-mation for possible applicability to their facilities. No specific action or response is requested at this time.

If further NRC evaluations so indi-cate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely,

%='b M^gf "-

VJames G. Keppler Director

Enclosure:

IE Information Notice No. 79-34 cc w/ encl:

Mr. T. Murray, Station Superintendent Central Files Director, NPR/DPM Director, NRR/ DOR 1739 034 PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio 0001 log l

UNITED STATES SSINS No.:

6870 NUCLEAR REGULATORY COMMISSION Accession No.:

0FFICE OF INSPECTION AND ENFORCEMENT 7910250517 WASHINGTON, D.C.

20555

'3

[)

December 27, 1979 IE Information Notice No. 79-34 INADEQUATE DESIGN OF SAFETY-RELATED HEAT EXCHANGERS Tennessee Valley Authority (TVA) submitted an initial 50.55(e) report on October 25, 1979, that identified defects in the four Containment Spray (CS) heat exchangers at the Sequoyah facility.

The heat exchanger tube bundles were damaged by excessive vibrations of the tubes against each other.

These vibraticns were caused by a support arrangement that allows excessive unsupported tube lengths.

The large amplitude tube vibration has resulted in reducticas in wall thickness and some tube leakage.

The CS heat exchangers at Sequoyah had only been in operation for a short period of time prior to the failure being detected.

These heat exchangers were manufactured by Industrial Process Engineers, Inc.,

(IPE), a vendor now out of business.

The Component Cooling Water (CCW) heat exchangers at the Sequoyah facility were also made by IPE.

TVA has identified some reduction in wall thickness and minor tube leakage in the CCW heat exchangers.

The licensee plans to plug the damaged tubes on the CS heat exchangers and " stake" (support) the tube bundles to prevent further damage.

Further corrective actial is under review by the licensee.

The following data applies to the CS heat exchangers:

Manfacturer:

Industrial Process Engineers, Inc.

Type:

CFU (Special)

Size:

55-342 Serials:

6662-1; 6662-2 6663-1; 6663-2 This Information Notice is provided as an early notification of a possibly signi-ficiant matter that is still under review by the NRC staff.

It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requested at this time.

If NRC evaluations so indicate, further licensee actions may be requested or required.

No written response to this Information Notice is required.

If you have any qeestions regarding this matter please contact the Director of the appropriate NRC Regional Office.

Enclosure:

List of Recently 1739 035 Issued IE Information Notices

IE Information Notice No. 79-34 Enclosure December 27, 1979 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 79-33 Improper Closure of 12/21/79 All power reactor facilities Primary Containment holding OLs and cps Access Hatches 79-32 Separation of Electrical 12/21/79 All power reactor facilities Cables for HPCI and ADS holding OLs and cps 79-31 Use of Incorrect Amplified 12/13/79 All holders of pcwer reactor Response Spectra (ARS)

OLs and cps 79-30 Reporting of Defects and 12/6/79 All power reactor facilities Noncompliance, 10 CFR Part 21.

holding Ols and cps and vendors inspected by LCVIP 79-29 Loss of HonSafety-Related 11/16/79 All power reactor facilities Reactor Coolant System holding OLs or cps Instrumentation During Operation 79-28 Overloading of Structural 11/16/79 All power reactor facilities Elements Due to Pipe Support with an OL or CP Loads 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruptures At Two PWR holding OLs ar.d cps Facilities79-12A Attempted Damage To New 11/9/79 All Fuel Facilities, Fuel Assemblies research reactors, and power reactors with an OL or CP 79-26 Breach of Containment 11/5/79 All power reactor facilities Integrity holding OLs and cps 79-25 Reactor Trips.it Turkey 10/1/79 All power facilities with Point Units 3 And 4 an OL or a CP 1739 036