Text
,*
.
jo
UNITED STATES
g
8
NUCLEAR REGULATORY COMMISSION
$.)
(,
o
~E
REGION 11
t
- b/ '[ #
o 7
101 MARic rTA ST
N.W.. SUITE 3100
ATLANTA. G EORGIA 30303
- +
NOV - 61979
In Reply Refer To:
RII:DKW
50-413/79-19
50-414/79-19
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by D. K. Walters of this office on
October 9-12, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR -117 for the Catawba Nuclear Station facility, and to the
discussion of our findings held with S. W. Dressler at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have ta ke..
with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. .If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
1599 069
7912180146
.
.
.
Duke Power Company
-2-
~
I979
6
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
hY
'
w
C. E. Murphy, Chi.
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-413/79-19
and 50-414/79-19
cc w/ enc 1:
D. G. Beam, Project Manager
P. O. Box 223
Clover, SC 27910
1599 070