Forwards IE Insp Repts 50-491/79-19,50-492/79-19 & 50-493/79-19 on 791023-26.No Noncompliance Noted
ML19210E855
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 11/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19210E852 List:
References
NUDOCS 7912130093
Download: ML19210E855 (2)


See also: IR 05000491/1979019

Text

.

.

4

/

o

UNITED STATES

,

8

NUCLEAR REGULATORY COMMISSION

o

$

E

REGION 11

9 #

o

101 MARIETTA ST

N.W., SUITE 3100

o

ATLANTA, GEORGIA 303o3

NOV 131979

In Reply Refer To:

RII:JKR

50-491/79-19

50-492/79-19

50-493/79-19

Duke Power Company

Attn:

L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by John K. Rausch of this office on

October 23-26, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with C. B. Aycock at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclos::d inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspectica report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1543

118

7912130 0 %

.

.

.

Duke Power Company

-2-

-

3 9 1979

Should you have any questions concerning this letter, we will bc glad to discuss

them with you.

Sincerely,

'

C. E. Murphy, Ch

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-491/79-19,

50-492/79-19 and 50-493/79-19

cc w/ enclosures:

J. T. Moore, Project Manager

,

Post Office Box 422

Gaffney, South Caro'ina 29340

1543

119

-