ML19210D813

From kanterella
Jump to navigation Jump to search
Informs That Costs of Processing & Issuance of OL Exceed Max Fee.Since Max Fee Paid,No Other Fee Required
ML19210D813
Person / Time
Site: Hatch 
Issue date: 11/09/1979
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Whitmer C
GEORGIA POWER CO.
Shared Package
ML19210D814 List:
References
NUDOCS 7911280108
Download: ML19210D813 (1)


Text

.

g' y

k UNITED STATES y,e g

NUCLEAR REGULATORY COMMISSION e

wasamoTou.a.c. osss 2g&f/

DOCKET NO. 50-366 NOV,,9 1979 i

Georgia Power Company ATTN: Mr. Charles F. Whitmer Vice President P. O. Box 4545 Atlanta, Georgia 30302 Gentlemen:

On June 13, 1978, the Comission issued Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant, Unit 2 (Hatch 2). As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.

In accordance with Foctnote 3 of Section 170.21, the costs incurred in the processing and issuance of the Hatch 2 operating license have been reviewed and they substantially exceed the maximum fee of $1,024,500 prescribed by the Commission's regulations. Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for Hatch 2.

Sincerely, t

.0 IA William O. Miller, Chief License Fee Management Branch Office of Administration 1403 i07

.