Text
- - -
'4
~
s' 8[
o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION o
E WAS$1tNGTON, D. C. 20555
{
^j
.... %. /
Ci October 24, 1979 Docket No. 50-219 Mr. I. R. Frinfrock, Jr., Vice President - Generation Jersey Central Power & Light Company Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960
Dear Mr. Frinfrock:
By letter dated June 1,1979, you submitted the Radiological Effluent Technical Specifications (RETS) for Oyster Creek Nuclear Power Plant, for your proposed change request number 69 to Provisional Operating License No. DPR-16. We have reviewed the submitted RETS and found that the submittal did not include:
(1) definition of terms, (2) specifications for radioactive gaseous and liquid effluent monitors and the surveillance requirements, (3) action statements for each specification in the PITS or a modification which accomplishes the intent of the action statements in the model RETS, (4) specifications for solid radioactive waste, (5) a process control program (PCP) for solidification of radwaste, and (6) an offsite dose calculation manual (ODCM). These omissions were pointed out to your staff in the information meeting held September 13, 1979, between NRC and JCPL.
During the informat10, meeting, we indicated to you that the model RETS had been approved by the Regulatory Requirements Review Connittee. The memorandum from B. Grimes and D. Eisenhut to A. Schwencer, et al., dated June 26,1978, and the memorandym from H. Denton to R. Minogue and J. Davis, dated October 20,1978, concerning R3C Committee approval are attached in response to your request.
In'tha letter and the information meeting mentioned above, you stated that solidification of wastes would be carried ou in accordance with the plant procedures, that the PCP and ODCM should best be included in the plant procedures and that these procedures are available. for review by the NRC Office of Inspection and Enforcement.
As we indicated in the infonnation meeting the plant procedures conthin infonnation in greater detail than we need, and NRR does not review plant procedures.
Accordingly, we need separate documents that are prepared specifically for the RETS following the guides for the PCP and ODCM which were attached to the June 18, 1979 memorandum.
h 304~
O 27B 7911190 3/4 A
Mr. I. R. Frinfrock, Jr. October 24, 1979 In the Safety Evaluation Report for Oyster Creek Nuclear Power Plant, dated December 23, 1968, we concluded that i.ne solid radwaste system of the Oyster Creek Nuclear Power Plant was adequate. The RETS implement the criteria used in our review of the radwaste systems, including the solid radwaste system.
In addition, a PCP for solidification is needed to provide reasonable assurance that the solid radwaste system will produce an acceptable product. Accordingly, we find it unacceptable for JCPL not to include the technical specifications for solid radioactive waste in the Oyster Creek RETS and not to include a PCP for solidification of radwaste required by the technical specifications.
If the solid radwaste system of the Oyster Cieek Nuclear Power Plant is not capable of performing its intended functions, then JCPL should define the limitations of the E:isting system and should provide a PCP to cover the waste that can be processed by the existing system.
In addition, JCPL should provide a schedule for upgrading the solid radwasta system to possess the capability of processing all types of waste to be shipped offsite. Where a vendor service is contracted for the solidification of radwaste, the PCP for the vendor's system should be provided.
In the information meeting of September 13, 1979, you indicated that certain deficiencies in the RETS submitted for the Oyster Creek Nuclear Power Plant will be corrected. We request that you revise the proposed RETS to include corrections to all the omissions mentioned above. Please submit the revised RETS for the Oyster Creek Nuclear Power Plant by November 30,1979.
Sincerely, h
Dennis L. Ziemann, lC ief Operating Reactors ranch #2 Division of Operating Reactors cc: See next page b
0 279
Mr. I. R. Finfrock, Jr. October 24, 1979 cc G. F. Trowbridge, Esquire Shaw. Pittnan, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 GPU Service Corporation ATTN: Mr. E. G. Wallace Licensing Manager 260 Cherry Hill Road Parsippany, New Jersey 07054 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street, N. W.
Washington, D. C.
20005 Steven P. Russo, Esquire 248 Washington Street P. O. Box 1060 Toms River, New Jersey 08753 Joseph W. Ferraro, Jr., Esquire Deputy Attorney General State of New Jersey Department of Law and Public Safety 1100 Raymond Boulevard Newark, New Jersey 07012 Ocean County Library Brick Township Branch 401 Chanbers Bridge Road Brick Town, New Jersey 08723 13 306 -
0 280
--..- g g is geg i,- Q,Y *V g
June 26,1978 A. Schwencer, Chief, Operating Reactors Branch #1 MEMORANDUM FOR:
D. Ziemann, Chief, Operating Reactors Branch #2 T. Ippolito, Chief, Operating Reactors Branch 93 R. Reid, Chief, Operating Reactors Branch #4 Brian K. Grimes, Assistant Director for Engineering FROM:
and Projects Darrell G. Eisenhut, Assistant Director for Systems and Projects APPENDIXITECHNICALSPECIFICATIONS$
SUBJECT:
The attached model Technical Specifications were prehared jointly by DSE and DDR to provide adequate assurance that the requirements of 10 CFR Appendix I will be implemented at all nuclear power piants.
The applicable Administrative Controls specifications are also Two sets of these Technical Specifications are provided; included.
one for PWR's (enclosure 2) and one for BWR's (enclosure 3).
3 These Technical Specifications were approved by the R C Committee on May 16,1978.
A copy of the sample letter (enclosure 1) will be sent to all
~
licensees indicating the ' submittal date shown on the attached page, with the appropriate model Technical Specifications (PWR You and each ORPM will or BWR) through the mass mailing system.
be infonned that the letters have actually been dispatched by receiving a copy of the letter and enclosures for each of your DDR Licensing Assistants should then arrange assigned facilities.
for all appropriate distribution to the docket files, PDR's and Local PDR's.
By copy of this letter it is suggested that DPM send the same or similar letter to licensees for operating plants that have not yet been,. transferred to DOR.
C' t
i
.h Y
Brian K. Grimes, Assistant Director Darrell G. Eiser.hu:, Assistant fa for Engineering and Projects for Sys: ems ar.: Frojects Division of Operating Reactors Division of Operating Repctors
( 6 S y]--
0 281
OCT 2 3 al
~r e r-";; pp : p.,tirccta, Direc;cr GSD d. O w i s,
.'s. ir.9 : : r c c t';r, CIE
- !. 't. Ieni.r.n, Direc tor,. LU FFM:
9., c..... : T s' ' i.. ' l..~ t :. ' r.' '. _... ' " i l'. ' t.
~. i
-......,.e.
....-.c....
SRC IF IC Ai;r?.s Sadiciceical Cffircat T >c: nic:31 nific 4 ns "r cl. ud ;:ce cc ries of ne t.
- iec-Toi F.
- Ts ( 1.CE"-00P.) and D.;s (htSEC-0 *.73 ) t :.ich irr;l u.;nto i! -
rents of 10 CFP Part 20,10 CFP, Part 50, Sctir;ns W.2"a, %
/,,;encix I.
mies ents F.cvi. u Ccr nittce (m c) on '.s 7, P.7?.
by 'Le regulct:ry :.:cire a rec:r;t re.vic.' of thew a cci fications, I cerc1"A i t* rt "
..is a r,ced to sirplify the rpecificaticac ti:rcuch ci:;rifice tien J " ?Tivre r "i N ~ ci-at Jnd tN r S ~ val of.a:recessary rereirr.r att.
n c Mions c ':cdy ti.e in.ent of Ly cco:1 :sicr.s.
thse ;ccificatiens i eve bcen ut easiv aly r:_vi::c c "' ' t ii1 r.a t' o n.m cat:1 rer circ ^n's ci!d cerccPt a con:ri 'M in $0
/1 a ed:
u.e. g or i 11 Ta a r1 in de r, a c c.y;ir.al &cc 2nts ci;rrcyr.d by IFC.the prc:vious ones, is LSc ri cval frce the cr s cciiications, frc'?
fic !ticos of the er,9aticr.s for ocse calcelatfor.s, set scint detemiraticns Trese iter.s, clerg uit!' sc-e crd mtecrclogiccl disrcref on factors.
0 are ui:cellanteus it&.s, ere i.au rer,uired to be included in en Cliri' Calculation varual to be prycrsd ty tPo licenste ad provided to QC for revicu and ai;;.roval, alcag with their ::rcrosed Technical Irecificatier"-
The:c chances rccuce the bulk of tbc crecifications ar:d siculd,iaic.iie cn this psis, I ee tha rotential reed for future licenso,_-cc&cnts.r.c rcaron to resu
.! eir ccvief r.r.d q,rreval.
're to the urcer.cy of tr.mst.:itting those rcvited :r::cificatice to tN cerating utilities by Povenber 1,1978, I en rce.&stin" t!wt ycu revicy I
..a.m ecifications to cater.nine if you have Any ra. ice prele s.
73,
.>uld lito to r.cet with you at 9:00 a.ri..on Thirrccay, reicher.M,19
'
- a.co str cificatiere.
in rcrn P-424 to discuss any ccrrents ycu ray Nec cdsuch a rectin', a call In t!.e ever.t that you have r.o cccrents rrantiotj to ice to that effect will suffico.
.% n;.,ya cy F. G.1:4
'. '.i n ' '
' n, Di r. C '.C r
[ c'. ' i t: ?I C l '. r' I ^ T C ' ' r
'I -
M40 e
"7
>#