Forwards IE Insp Repts 50-424/79-13 & 425/79-13 on 790724-26 & Notice of Violation
ML19210B932
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/08/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19210B921 List:
References
NUDOCS 7911130054
Download: ML19210B932 (2)


See also: IR 05000424/1979013

Text

on arag'o

a

b

/

UNITED STATES

l'

3 #qf' 1

NUCLEAR REGULATORY COMMISSION

'

  1. .E

REGION 11

$[' "h[/

!

i

f

101 MARIETT A ST., N.W.. SUITE 3100

o

\\/

AT LANT A, G EoRGI A 30303

  • ....

In Reply Refer To:

AUG 0 81979

RII:JJL

50-424/79-13

50-425/79-13

Georgia Power Company

Attn:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office

on July 24-26, 1979 of activities authorized by NRC Construction Permit

Nos. CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, Units I

and 2, and to the discussion of our findings held with H. H. Gregory,

III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously

identified inspection findings. These are discussed in the enclosed inspection

report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. These

items and references to pertinent requirecients are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations. Section L 201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

1321

032

7911130

-

.

.

AUG 0 e 1979

Georgia Power Company

-2-

'

application within 20 days to this office to withhold such information

from public disclosure. Any such application must include a full state-

ment of the reasons on the basis of which it is claimed that the informa-

tion is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

, .

J

C. E. Murphy, C ief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Rep >rt Nos. 50-424/79-13

and 50-425/79-13

cc w/ enclosures:

K. M. Gillespie

Construction Project Manager

Post Office Box 282

Waynesboro, 9eorgia 30830

E. D. Groover

QA Site Supervisor

Post Office Box 282

Waynesboro, Georgia 30830