MONTHYEARML20211M6651999-09-0101 September 1999 Errata Page 4-45,reflecting Proposed Changes Requested in ML20211D1551999-08-20020 August 1999 Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances ML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20210J1261999-07-29029 July 1999 Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSs ML20195E6201999-06-0404 June 1999 Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20206R1171999-05-13013 May 1999 Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases Statement ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20205H0781999-04-0101 April 1999 Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20203B0511999-02-0202 February 1999 Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment ML20196G4861998-12-0303 December 1998 Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License ML20196H5361998-12-0303 December 1998 Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196F8661998-11-25025 November 1998 Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of Svc ML20154P8661998-10-19019 October 1998 Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage ML20154Q6271998-10-19019 October 1998 Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18 ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20249B2421998-06-11011 June 1998 Proposed Tech Specs Re Alternate High Radiation Area Control ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20217J8201998-03-25025 March 1998 Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo ML20217E5311998-03-23023 March 1998 Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20198T4721997-12-31031 December 1997 TMI-1 Cycle 12 Startup Rept ML20217G0201997-10-0303 October 1997 Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously Submitted ML20211F3781997-09-24024 September 1997 Proposed Tech Specs Revising Steam Line Break Accident Dose Consequence ML20211C2431997-09-19019 September 1997 Proposed Tech Specs Re Decay Heat Removal Sys Leakage ML20211C3421997-09-19019 September 1997 Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR Analysis ML20210K0011997-08-14014 August 1997 Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J4051997-08-12012 August 1997 Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operation ML20198E7941997-07-30030 July 1997 Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 Mwt ML20151K2071997-07-25025 July 1997 Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264 ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20141E1491997-05-0808 May 1997 Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2471997-04-21021 April 1997 Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat Valves ML20134M1211997-02-0707 February 1997 Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430 ML20133D2821996-12-24024 December 1996 Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment Sys ML20132F3301996-12-16016 December 1996 Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135D0991996-12-0303 December 1996 Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430 ML20135C5321996-12-0202 December 1996 Proposed Tech Specs Re Relocation of Audit Frequency Requirements ML20128H4121996-10-0303 October 1996 Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial Corrections ML20117H0451996-08-29029 August 1996 Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1971996-06-28028 June 1996 Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8791996-05-24024 May 1996 Proposed Tech Specs Re Pages for App A.Certificate of Svc Encl ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20101R1571996-04-10010 April 1996 Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been Completed ML20100J6931996-02-22022 February 1996 Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met ML20096F0521995-12-31031 December 1995 TMI-1 Cycle 11,Startup Rept ML20095J2311995-12-21021 December 1995 Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program 1999-09-01
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210S7691999-08-12012 August 1999 Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20206R6531999-05-13013 May 1999 Rev 39 to TMI Modified Amended Physical Security Plan ML20204B5291999-03-12012 March 1999 Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) ML20154D5491998-10-0101 October 1998 Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 ML20206C0911998-09-0101 September 1998 Rev 17 to Odcm ML20216E9751998-04-13013 April 1998 Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm ML20216E9491998-04-0909 April 1998 Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual ML20202B2061998-01-30030 January 1998 Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm ML20217M7251997-06-22022 June 1997 Rev 16 to Procedure 6610-PLN-4200.01, Odcm ML20138B4641996-05-0606 May 1996 Rev 14 to Procedure 6610-PLN-4200.01, Odcm ML20092M1941995-09-21021 September 1995 TMI-1 Pump & Valve IST Program ML20084N3541995-03-24024 March 1995 Rev 11 to 6610-PLN-4200.01, Odcm ML20137B5371995-03-22022 March 1995 Rev 11 to 6610-PLN-4200.01, Odcm ML20081C1281995-03-0808 March 1995 Svc Water Sys Operational Performance Insp Self-Assessment Plan ML20073F9411994-09-26026 September 1994 Revised Plan for Long Range Planning Program for TMI Nuclear Station Unit 1 ML20059M2301993-11-12012 November 1993 Rev 7 to 6610-PLN-4200.01, Odcm ML20057B3781993-09-0202 September 1993 Rev 6 of Solid Waste Staging Facility Sys Description ML20127A2181992-10-15015 October 1992 Rev 1 to 6615-PLN-4520.01, REMP - Plan ML20127A2301992-08-11011 August 1992 Rev 30 to Emergency Procedure 1202-32, Flood ML20090D4031991-10-0404 October 1991 Rev 16 to Waste Solidification Process Control Program ML20082M2991991-08-29029 August 1991 Rev 8 to Operating Procedure 1104-28I, Waste Solidification Process Control Program ML20127A1511991-07-0808 July 1991 Rev 4 to 1000-PLN-4010.01, Gpu Nuclear Corp Radiation Protection Plan ML20082M2951991-06-27027 June 1991 Rev 14 to Operating Procedure 1104-28I, Waste Sodification Process Control Program ML20198B9741991-06-17017 June 1991 Rev 2 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20070L3331991-03-15015 March 1991 Rev 1 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20070U9241991-03-0404 March 1991 Rev 0 to 6610-PLN-4200.01, Odcm ML20059H9031990-09-0707 September 1990 Rev 0 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20059C7931990-08-23023 August 1990 Rev 5 to Sys Description 3184-007, Solid Waste Staging Facility ML19351A4371989-11-30030 November 1989 Rev 9 to 9110.PLN-4200.02, Emergency Dose Calculation Manual. ML20248D4071989-09-27027 September 1989 Rev 8 to 9100-PLN-4200.02, TMI Emergency Dose Calculation Manual ML20245K1211989-08-0202 August 1989 Rev 4 to SD 3184-007, Div Sys Description for Solid Waste Staging Facility ML20244C2961989-06-30030 June 1989 Rev 1 to Sys Description SD 3510-013, Div Sys Description for Reactor Bldg Sump Recirculation Sys ML20246M7931989-03-0909 March 1989 Rev 11 to Operating Procedure 1104-28I, Waste Solidification Process Control Program ML20154C7191988-06-0303 June 1988 Rev 10 to Operating Procedure 1104-28I, Waste Solidification Process Control Program ML20154Q6771988-05-27027 May 1988 Recovery Operations Plan ML20236M1621987-11-0909 November 1987 Radiological Environ Monitoring Program for TMI-1 ML20236M4281987-10-19019 October 1987 Vols 1 & 2 of 1987 TMI Annual Exercise Scenario ML20147F9331987-08-25025 August 1987 Rev 3 to Procedure 1000-ADM-1291.01, Procedure for Nuclear Safety & Environ Impact Review & Approval of Documents ML20238C6391987-08-21021 August 1987 Rev 2 to Design Criteria 3255-86-0004, TMI-2 Design Criteria for Pressurizer Defueling Sys. W/One Oversize Figure ML20236K9601987-07-24024 July 1987 Rev 3 to 3184-007, Solid Waste Staging Facility Sys Description ML20215M3261987-06-19019 June 1987 Rev 16 to Organization Plan ML20215H0301987-06-15015 June 1987 Revised Emergency Plan Implementing Procedures,Including Rev 2 to 6415-IMP-1300.06. Addl Assistance & Notification & Rev 1 to 6415-IMP-1300.16, Contaminated Injuries. Updated Table of Contents Encl ML20215M1291987-03-20020 March 1987 Corrected NCRP Commentary 4, Guidelines for Release of Waste - Water from Nuclear Facilities W/Special Ref to Public Health Significance of Proposed Release of Treated Waste Waters at Tmi ML20214S4481986-12-31031 December 1986 TMI-2 Cleanup Program,Post-Defueling Monitoring Storage ML20212N6711986-12-17017 December 1986 Rev 2 to Test Procedure SC-1302-323 Isolator - Fault Testing. Test Results Encl ML20212H7821986-10-10010 October 1986 Rev 7 to Operating Procedure 1104-28I, Waste Solidification Process Control Program ML20206U7611986-09-26026 September 1986 Rev 1 to SD 3520-010, Div Sys Description for Processed Water Storage & Recycled Sys ML20205E7891986-08-0707 August 1986 Rev 0-03 to Corporate Procedure 1000-ADM-1291.01, Safety Review & Approval Procedure ML20211Q8251986-06-0202 June 1986 Rev 4 to SDD-TI-614, Div I Sys Design Description for TMI-1 Remote Shutdown Sys ML20203N1761986-04-29029 April 1986 Rev 4 to Div Sys Description for Auxiliary Bldg Emergency Liquid Cleanup Sys (Epicor II) 1999-08-12
[Table view] |
Text
. . PORC C . AIRiV AiN i20m Revision 5 UN,T 1 o9/1o/79 THREE MILE ISLAND NUCLEAR STATION g ; --*c- .yg g UNIT #1 ABNORMAL PROCEDURE 1203-1 LOAD REJECTION Table of Effective Pages CONTROLLED COPY.
Pace Date Revision Paoe Date Revision Pace Date R evision 1.0 06/28/79 4 26.0 51.0 2.0 09/10/79 5 27.0 52.0 3.0 09/10/79 5 28.0 53.0 4.0 09/10/79 5 29.0 54.0 5.0 09/10/79 5 30.0 55.0 6.0 31.0 56.0 7.0 32.0 57.0 8.0 33.0 58.0 9.0 34.0 59.0 10.0 35.0 60.0 11.0 36.0 61.0 12.0 37.0 62.0 13.0 38.0 63.0 14.0 39.0 64.0 15.0 40.0 65.0 16.0 41.0 66.0 17.0 42.0 67.0 18.0 43.0 68.0 19.0 44.0 69.0 20.0 45.0 70.0 21.0 46.0 71.0 22.0 '
47.0 72.0 23.0 48.0 73.0 24.0 49.0 74.0 25.0 50.0 75.0 Unit 1 Staff Recomme pproval Unit 2 Staff Recomme pproval Approval Approval Date i // Date Cognizant Dep't. Head Cogn'izant dept. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recomm nd Approval lA M Date hh0lM'
/ Date 7 Chairman of PORC ,,
Chairr6an oIPCIRC '
Unit 1 Superintend t Approval Unit 2 Superint dent ovai
.j70 / Date f /O 9 '
/ Date V
~ - '
0 / /
Manager Generation Quality Assurance Approval Date TM8 55 A Rev 8/77 j gg 3g 79101 00 hI g
1203-1 Revision 4 06/28/79 .
THREE MILE ISLAND NUCLEAR STATION UNIT #1 ABNORMAL PROCEDURE 1203-1 LOAD REJECTION 1.1 SYMPTOMS
- 1. Outgoing 230 KV .line breakers open (indication on SS-1 panel).
- 2. Reactor power decreasing.
- 3. Increase in pressurizer level and reactor pressure.
- 4. Megawatts electric decreasing to auxiliary load. (Reactor / Turbine Generator remain on line supplying % 50 to 100 MW of Unit #1 and Unit #2 auxiliary load.)
- 5. High turbine header pressure, lifting of secondary steam safety valves.
- 6. Increase in generator frequency of 3 to 4 cycles.
1.2 IMMEDIATE ACTION A. Automatic Action
- 1. The ICS trips to tracking because the turbine control trips to MANUAL on power-load imbalance relay actuation.
- 2. ICS ULD runs back in tracking mode to 15% Reactor Power.
(In approximately 2 or 3 minutes.)
- 3. EHC speed control and power imbalance relay, control turbine speed and frequency to prevent overspeed trip of turbine.
- 4. Secondary safety valves and atmospheric dump valves open.
- 5. Turbine bypass valves open.
- 6. Pressurizer spray valve opens at 2205 psig.
- 7. Pressurizer power operated relief valve may open.
- 8. Possible high pressure reactor trip.
1.0 lN-
' ~
1203-1 Revision 5 09/10/79 B. Manual Actions NOTE: An asterisk (*) indicates that the parameter valve must be reverified as the first step in the follow-up action. Use redundant indication where possible.
- l. Verify feedwater flow and reactor power are being reduced to supply station service MW eload (%50 to 100 MW )*
e
- 2. If additional spray flow is required to slow pressure increase, place spray valve in manual and open as required.
- 3. Verify that the spray valve recloses when pressure returns to <2205 psig.
- 4. If diamond power or reactor master is on hand, run rods in manually to 12% neutron power. Rate of rod insertion should be that required to maintain reactor coolant system pressure between 2055 and 2255 psig.
- 5. If any feedwater stations are on hand, total feedwater should be reduced manually to that corresponding to 15%
neutron power (approximately 1.0 x 610 lb/hr) . Rate of feedwater reduction should be that required to maintain RCS pressure between 2055 and 2255 psig.
- 6. If reactor or generator trips implement 1202-2, Station Blackout.
1.3 FOLLOW-Up ACTION The objective of the load rejection procedure is to observe feedwater, main steam pressure, reactor coolant pressure to assure that the unit stabilizes at sl5% reactor power. Prepare to implement the blackout procedure. Determine and correc+ the cause for the load rejection and resynchronize with the system. ,
O
1203-1 Revision 5 09/10/79 Using redundant indication and/or other plant parameters 1.
reverify the steps in manual action that are marked with an asterisk (*).
- 2. Monitor pressurizer level, RC pressure, RC temperature, OTSG level, and steam header pressure.
- 3. Verify pressurizer heaters and spray control RC pressure at 2155 psig. With steam header pressure setpoint at 885 psig, header pressure should be between 900 and 960 psig. Adjust makeup and letdown flows to control pressurizer level at 220".
Verify feed flow is controlling OTSG level at > 30".
- 4. Start one diesel generator and leave running continuously until two 230 KV lines are restored.
CAUTION: Do not parallel the diesel with the auxiliary transformer at this time.
- 5. Verify secondary safety valves have closed and PORV is not leaking. Check RC drain tank level, pressure and temperature for increasing trend.
- 6. While carrying auxiliary load, monitor turbine generator for vibration, evidence of rubbing, high exhaust temperature
(>l75 ) or other conditions that might require turbine generator shutdown.
NOTE: A turbine generator trip will cause a station blackout.
- 7. Check the water level in high and low pressure feedwater heaters at the local sightglass to ensure proper heater drain valve operation.
- 8. In the event the generator trips, a station blackout will occur. Prepare to implement EP 1202-2.
30 1122 359
1203-1 Revision 5 09/10/79
- 5. Notify the duty superintendent and, if necessary, call standby personnel to assist in responding to possible loss of power.
- 10. Contact dispatcher and send auxiliary operator to the 230 KV substation to attempt to detemine cause for the separation from the system.
CAUTION: Use caution when stopping feedpump, heat drain Pp or condensate Pp. Loss of the other feed pump will cause reactor trip and blackout.
- 11. Within one hour, refer to the reporting procedure and detemine if reporting is required.
- 12. Due to the buildup of Xenon to peak conditions the following actions should be considered depending on the time of core life. #
- a. 0-EFPD to 230 EFPD A combination of rod withdrawal and deboration should be used to overcome peak Xenon. -
- b. 230 EFPD to 280 EFPD During this period rod worth and boron worth may not be sufficient to overcome peak Xenon. Unless reactor power is increased, to burnout Xenon, the reactor core may go suberitical during peak Xenon conditions. Notify the disp.atcher of this condition so that he will be aware of the urgency of restoring interconnecting lines.
- 13. When conditions pemit and pemission is received from dispatcher, use the syncscope in the substation control building and reclose a line breaker.
i 4.0 1122 560
1203-1 Revision 5 09/10/79 NOTE: The turbine will pickup load rapidly if system frequency is low.
- 14. If unable to synchronize with the system and the diesel generator has been running idle for a period of time, load should be applied. Synchronize with the 4 KV ES bus then trip the bus feeder breaker.
1122 361 5.0