ML19209B412
| ML19209B412 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/14/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19209B408 | List: |
| References | |
| NUDOCS 7910090649 | |
| Download: ML19209B412 (2) | |
See also: IR 05000245/1979011
Text
f.
s
p n,
UNITED STATES
}o
NUCLEAR REGULATORY COMMisslON
y
o
REGION I
$
g
431 PARK AVENUE
C
KING OF PRUSSI A, PENN5YLVANIA 15 I6
%,*.../
Docket Nos. 50-245
50-336
AUS 14199
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut
06101
-
Gentlemen:
Sob'ect:
Inspection 50-245/79-11; 50-336/79-14
This refers to the inspection conducted by L. H. Thonus of this office on
April 30 - May 4 at Millstone Nuclear Power Station Units 1 and 2 of activities
authorized by NRC License Nos. DPR-21 and DPR-65 and to the discussions of
'
our findings held by Mr. Thonus with Mr. J. F. Opeka and other members of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, measurements
made by the inspector, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels as described in our
correspondence to you dated December 31, 1974.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you
to submit to this office, within twenty (20) days of your receipt of this
notice, a written statement or explanation in reply including (:
(1) corrective
steps which have been taken by you and the results achieved;
2) corrective
steps which will be taken to avoid further items of noncompliance; and (3)
the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it
is necessary that you make a written application within 20 days to this
3315 Til
7910090h%
.
.
Northeast Nuclear Energy Company
2
AUS 141973
office to withhold such information from public disclosure. Any such
application must be accompanied by an affidavit executed by the owner of
the information, which identifies the document or part sought to be withheld,
and which contains a statement of reasons which addresses with specificity
the items which will be considered by the Commission as listed in subparagraph
(b)(4) of Section 2.790.
The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified period, the
report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/
-
G
ge
e
.
Fu 1 F cility and Materials Safety
B anch
Enclosures:
1. Appendix A, Notice of Violation
2. Office of Inspection and Enforcement Inspection
Report Number 50-245/79-11,50-336/79-14
cc w/ enc 1:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)
<
1116
313