ML19209A080

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-21,50-270/79-19 & 50-287/79-21 on 790807-09.No Noncompliance Noted
ML19209A080
Person / Time
Site: Oconee  
Issue date: 09/11/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19209A078 List:
References
NUDOCS 7910020207
Download: ML19209A080 (2)


See also: IR 05000269/1979021

Text

[

[

o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

n

3

E

REGION 11

'#

O

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 3o3o3

SEP 111979

In Reply Refer To:

RII:NE

50-269/79-21

50-270/79-19

50-287/79-21

%

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Nick Economos of this office

on August 7-9, 1979 of activities authorized by NRC License Nos. DPR-38,

DPR-47 and DPR-55, for the Oconee Nuclear Plant facility, Unit Nos. 1, 2

and 3, and to the discussion of our findings held with J. E. Smith at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures r'd representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.,90 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contract ( ) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

1136.Dii

-

o70 7

-y.91c o c

wv

,

-.

.

. _ . . . _ _ . _ _ _

, * -

.

SEP 111979

Duke Power Company

-2-

,

in a separate part of the document. .If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss 4them with yo'i.

Sincerely,

. .

C. r.. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-269/79-21,

50-269/79-19 and 50-287/79-21

cc w/ enclosures:

J. E. Smith, Station Manager

Post Office Box 1175

Seneca, South Carolina 29678

.

1136

012

.