ML19208D123

From kanterella
Jump to navigation Jump to search
Forwards Revised App a to Re IE Insp Rept 50-282/79-19 & 50-306/79-14.Noncompliance Item 2 Is Retracted
ML19208D123
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/11/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML19208D124 List:
References
NUDOCS 7909280016
Download: ML19208D123 (1)


See also: IR 05000282/1979019

Text

-

>pm Recoq'o

UNITED STATES

['

gi,%

NUCLEAR REGULATORY COMMISSION

$

- gl.h E

REGION ill

gp 11

ff

8

799 POOSEVELT ROAD

o

8

GLEN ELLYN,lLLINOIS 60137

g ss j

.....

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATTN:

Mr. Leo Wachter

Vice President

Power Production and

System Operation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

Based on a telephone conversation with Mr. L. Mayer of your staff on

August 28, 1979, we have concluded that the basis for item No. 2 of

Appendix A to our August 24, 1979 letter (Ir.spection Report No. 50-282/

79- 19 and No. 50-306/79-14) does not exist. Hence, we are hereby retract-

ing this item of noncompliance.

Enclosed is a revised Appendix A to our August 24, 1979 letter.

No reply

to this letter or our August 24, 1979 letter is required.

Sincer

,

W

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

Revised Appendix A,

Notice of Violation

e

cc w/ enc 1:

Mr. F. P. Tierney, Jr.,

Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

John W. Ferman, Ph.D.,

Euclear Engineer, MPCA

T9092 80 014

n,

\\NJG

i

a