Forwards IE Insp Rept 50-317/79-06 on 790501-04.No Noncompliance Noted
ML19208B907
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 07/31/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19208B908 List:
References
NUDOCS 7909240139
Download: ML19208B907 (2)


See also: IR 05000317/1979006

Text

%

-

-

,, ng

UNITED STATES

D

NUCLEAR REGULATORY COMMisslON

[

REGION 1

o

$

k

$31 PARK AVENUE

2

KING OF PRUS$1A, PENNSYLVANIA 19404

\\,...../

Docket No. 50-317

Baltimore Gas and Electric Comprny

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection 50-317/79-06

This refers to the inspection conducted by Mr. A. Johnson of this office on May

1-4, 1979 at Calvert Cliffs Nuclear Plant, Unit 1, Lusby, Maryland of activities

authorized by NRC DPR-53 and to the discussions of our findings held by Mr.

Johnson with Mr. L. B. Russell of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report con-

tains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure.

Any sucP :ppli-

cation must be accompanied by an affidavit executed by the owner of taa information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

383W13

157

q 909d

'

.

.

.

JUL 31 1979

Baltimore Gas and Electric Co.

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

,

1o

. Brunner, Chief

Rea tor Operations and Nuclear

S pport Branch

Enclosure: Office of Inspection and Enforcenent Inspection

Report Number 50-317/79-06

cc w/ enc 1:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

S&33244