Forwards IE Insp Rept 50-339/79-36 on 790619 & 22 & Notice of Violation
ML19208B134
Person / Time
Site: North Anna 
Issue date: 07/11/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19208B124 List:
References
NUDOCS 7909190096
Download: ML19208B134 (2)


See also: IR 05000339/1979036

Text

r

  1. pa nac

'o

UNITED STATES

t

8'

?,j

NUCLEAR REGULATORY COMMISSION

> , ,

REGION 11

"

  • '

r

0,,

[

101 MARIETTA sT., N.W., sulTE 3100

ATL ANTA, GEORGIA 30303

  • g'

be

.....

.

In Reply Refer To:

JUL 1 1 1979

RII:AGW

50-339/79-36

Virginia Electric and Power Company

ATTN:

W.-L. Prof fitt

Senior Vice President, Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by A. G. Wagner of this office on June 19,

1979, and June 22, 1979, of activities authorized by NRC Construction Permit No.

CPPR-78 for the North Anna 2 facility, and to the discussion of our findings

held with J. D. Kellams at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

790919 0%

b

v M,

.

.

JUL 111979

'

Virginia Electric and Power Company

-2-

Should you have any questions concerning this letter, we will be gla~d to discuss

them with you.

Sincerely,

.

E c.

Richard

. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-339/79-36

cc w/ encl:

W. R. Cartwright, Station Manager

Box 402

Mineral, VA 23117

P. G. Perry

Senior Resident Engineer

P. O. Box 38

Mineral, VA 23117