ML19208B126

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-21 on 790611-15. No Noncompliance Noted
ML19208B126
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/13/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19208B127 List:
References
NUDOCS 7909190083
Download: ML19208B126 (2)


See also: IR 05000302/1979021

Text

g.. neog

~

l

.

UNITED STATES

' , ,

NUCLEAR REGULATORY COMMISSION

/

[

o

8'

.., gg'. g

REGION 11

~#

t

U(

o,,

b

f

101 MARIETT A sT.. N.W., sUtTE 3100

e

ATLANT A, GEORGI A 30303

\\ . .V

...

In Reply Refer To:

RII:HLW

JUL 131979

50-302/79-21

Florida Power Corporation

ATTN:

W. P. Stewart, Manager

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by H. L. Whitener of this office on

June 11-15, 1979, of activities authorized by NRC Operating License No. DPR-72

for the Crystal River 3 facility, and to the discussion of our findings held with

G. Westafer at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with personnel,

and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported unre-

solved items. 'lhe status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's '3ules of Practice", Part 2, Title 10,

Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such infornation from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

7909190663

6

da

,

.

Florida Power Corporation

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

[.[.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Suppou. Branch

Enclosure:

Inspection Report No.

50-302/79-21

cc w/ encl:

G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, FL 32629

'L,Db

i h

Qgv

.