ML19207C499
| ML19207C499 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/18/1979 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML19207C500 | List: |
| References | |
| NUDOCS 7909120068 | |
| Download: ML19207C499 (1) | |
See also: IR 05000346/1979014
Text
f/CL
,
sk"*' % ,
UNITED STATES
pfi
,
NUCLE AR REGULATORY COMMISSION
,
y
1 3'(
o
REGION ill
pf
7e
k
y4/
c LEN ELLYN, ILUNOt5 60137
- ...*
AUGj g ggg
Docket No. 50-346
Toledo Edison Company
ATTN:
fir. Richard P. Crouse
Assistant Vice President -
Energy Supply
Edison Plaza
300 Madison Avenue
Toledo, OH
43652
Gentlemen:
In discussing details or the apparent deviation contained in IE Inspec-
tion Report No. 50-346/79-14 via telephone with a Davis-Besse representa-
tive, certain new information and clarification of existing information
relative to the referenced deviation was obtained. We believe this
information substantiates that reviews of the Emergency Plan were per-
formed as required by the Station Review Board. The deviation transmitted
to you in the abovo. report is therefore cancelled. Please insert revised
pages 1 and 4 in your inspection report and remove and destroy Appendix A
to the transmittal letter.
Sincerely,
A
A. B. Davis, Cnief
Fuel Facility and
Materia]- Safety Branch
cc w/ encl:
Mr. T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Power
Siting Commission
.
-
.
7 909120 M