IE Insp Rept 50-346/79-14 on 790612-15.No Noncompliance Noted.Major Areas Inspected:Emergency Planning Facilities, Equipment,Procedures,Tests,Drills & Coordination W/Offsite Agencies
ML19207C501
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/14/1979
From: Essig T, Greer R, Januska A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19207C500 List:
References
50-346-79-14, NUDOCS 7909120069
Download: ML19207C501 (2)


See also: IR 05000346/1979014

Text

.

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-346/79-14

Docket No. 50-346

License No. NPF-3

Licensee:

Toledo Eiison Company

Edison Plaza

300 Madison Avenue

Toledo, OH

43652

Facility Name:

Davis-Besse Nuclear Power Station, Unit 1

Inspection At:

Davis-Ecsse Site, Oak Harbor, OH

Inspection Conducted:

June 12-15, 1979

.

. (&Y

t 3/7 5

Inspectors:

A. G.

nuska

hi -

dL(

k hN

R.

. Greer

-

,

d&

/

-

8 W'W

Approvec By:

T. H. Essig, hief

Environmental and Special

Projects Section

Inspection Summary

Inspection on June 12-15, 1979 (Report No. 50-346/79-14)

Areas Inspected: Routine, unannounced inspection of emergency planning

including reviews of coordination with offsite agencies; facilities,

equipment, procedures; and tests and drills. The inspection involved 54

inspector-hours on site by two NRC inspectors.

Results: Of the five areas inspected, no apparent items of noncompliance

or deviations were identified.

U [y 0

\\0

7009120 0 @

.

,

Section6.{jand 6.3 of the Plan and an item discussed in a previous

inspection- revealed that the Station Review Board had completed

the required review of the Plan for 1978 and 1979.

The licensee has revised a procedure for the review of procedures

(AD 1805.02) which generates a computer printout of required review

dates which gives further assurance that the Plan is reviewed in

accordance with Sections 6.2 and 6.3 of the Plan.

The station has formed a task force for the review and revision of

the Emergency Plan. A licensee representative stated that the revised

Plan would be divided into (1) the Plan, (2) Emergency Guidance and

(3) Implementing Procedures, and would follow Regulatory Guide 1.101

and other NRC guidance as applicable. The licensee expects to com-

plete a draf t by late f all and, af ter f actoring in information f rom

his participation in a State drill, a final document by the end of

the year.

7.

Tests and Drills

Documentation of the Radiation Management Corporation (RMC) drill

conducted in 1978 was reviewed. RMC supplied a critique to both the

Station and Magruder Hospital. While visitng off-site support

agencies, the Magruder Hospital Administrator expressed a desire to

consider multiple nonambulatory contaminated victims for treatment

in the hospital during a future drill. The inspectors discussed

this matter with a licensee representative who stated that this item

will be discussed with RMC prior to their next medical drill.

8.

Exit Interview

The inspectors met with licensee representatives (denoted in Para-

graph 1) at the conclusion of this inspection on June 15, 1979.

The

purpose, scope, and findings of the inspection were discussed.

The

licensee made the following remarks to certain items discussed by

the inspectors:

a.

Agreed to meet with Sheriff Faust by June 25, 1979 to make

arrangements for radiation indoctrination for contiguous county

sheriff personnel.

b.

Stated that the feasability of using multiple victims for

hospital treatment during a future drill would be discussed

with RMC.

-1/

IE Inspection Report No. 50-346/78-09.

'44

106