U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-346/79-14
Docket No. 50-346
License No. NPF-3
Licensee:
Toledo Eiison Company
Edison Plaza
300 Madison Avenue
Toledo, OH
43652
Facility Name:
Davis-Besse Nuclear Power Station, Unit 1
Inspection At:
Davis-Ecsse Site, Oak Harbor, OH
Inspection Conducted:
June 12-15, 1979
.
. (&Y
t 3/7 5
Inspectors:
A. G.
nuska
hi -
dL(
k hN
R.
. Greer
-
,
d&
/
-
8 W'W
Approvec By:
T. H. Essig, hief
Environmental and Special
Projects Section
Inspection Summary
Inspection on June 12-15, 1979 (Report No. 50-346/79-14)
Areas Inspected: Routine, unannounced inspection of emergency planning
including reviews of coordination with offsite agencies; facilities,
equipment, procedures; and tests and drills. The inspection involved 54
inspector-hours on site by two NRC inspectors.
Results: Of the five areas inspected, no apparent items of noncompliance
or deviations were identified.
U [y 0
\\0
7009120 0 @
.
,
Section6.{jand 6.3 of the Plan and an item discussed in a previous
inspection- revealed that the Station Review Board had completed
the required review of the Plan for 1978 and 1979.
The licensee has revised a procedure for the review of procedures
(AD 1805.02) which generates a computer printout of required review
dates which gives further assurance that the Plan is reviewed in
accordance with Sections 6.2 and 6.3 of the Plan.
The station has formed a task force for the review and revision of
the Emergency Plan. A licensee representative stated that the revised
Plan would be divided into (1) the Plan, (2) Emergency Guidance and
(3) Implementing Procedures, and would follow Regulatory Guide 1.101
and other NRC guidance as applicable. The licensee expects to com-
plete a draf t by late f all and, af ter f actoring in information f rom
his participation in a State drill, a final document by the end of
the year.
7.
Tests and Drills
Documentation of the Radiation Management Corporation (RMC) drill
conducted in 1978 was reviewed. RMC supplied a critique to both the
Station and Magruder Hospital. While visitng off-site support
agencies, the Magruder Hospital Administrator expressed a desire to
consider multiple nonambulatory contaminated victims for treatment
in the hospital during a future drill. The inspectors discussed
this matter with a licensee representative who stated that this item
will be discussed with RMC prior to their next medical drill.
8.
Exit Interview
The inspectors met with licensee representatives (denoted in Para-
graph 1) at the conclusion of this inspection on June 15, 1979.
The
purpose, scope, and findings of the inspection were discussed.
The
licensee made the following remarks to certain items discussed by
the inspectors:
a.
Agreed to meet with Sheriff Faust by June 25, 1979 to make
arrangements for radiation indoctrination for contiguous county
sheriff personnel.
b.
Stated that the feasability of using multiple victims for
hospital treatment during a future drill would be discussed
with RMC.
-1/
IE Inspection Report No. 50-346/78-09.
'44