Category:Inspections
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:Tests
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:Analyses
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ML23199A1352023-07-17017 July 2023 ITAAC Closure Verification Evaluation Form (Vef) 2.7.05.02.i for ITAAC Number for Combined License ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ML23194A0192023-07-12012 July 2023 Urgent: Vef (Icn 5033) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0490, ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05c (Index Number 786) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) ND-23-0164, ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of Item 2.6.03.02.i (Index Number 597) ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0582, ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.29.04 (Index Number 491) ND-23-0578, ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506)2023-07-0707 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.01.02a (Index Number 506) ND-23-0576, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113) ND-23-0574, ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.11c.i (Index Number 51) ND-23-0163, ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98)2023-07-0606 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.05.i (Index Number 98) 2023-07-08
[Table view] Category:and Acceptance Criteria (ITAAC)
MONTHYEARML23214A2212023-07-30030 July 2023 Historical Vogtle Unit 3 Combined License Appendix C as of July 30 2023 ML23195A0312023-07-14014 July 2023 ITAAC Closure Verification Evaluation Form (Vef) for ITAAC Number 2.1.03.06.i (Index No. 75) for Vogtle Unit 4 Combined License (VOG4) ML22178A0902022-06-27027 June 2022 ITAAC Review Status Report 6-27-2022 ML22167A0222022-06-16016 June 2022 ITAAC Review Status Report 6-16-2022 ML22165A0752022-06-14014 June 2022 ITAAC Review Status Report 6-14-2022 ML22165A0762022-06-14014 June 2022 ITAAC Review Status Report 6-14-2022 ML22116A0362022-04-26026 April 2022 ITAAC Review Status Report 4-26-2022 ML22026A0562022-01-26026 January 2022 ITAAC Review Status Report 1-26-2022 ND-22-0041, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load2022-01-18018 January 2022 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load ML21336A5752021-12-0909 December 2021 Update to Targeted Inspections, Tests, Analyses, and Acceptance Criteria for Vogtle Electric Generating Plant Units 3 and 4 ML21342A3042021-11-0202 November 2021 Attachment 1 - Vogtle Units 3 & 4 ITAAC - November 2021 ML21342A3052021-11-0202 November 2021 Attachment 2 - Vogtle Units 3 and 4 ITAAC - November 2021 ND-21-0916, Resubmittal of ITAAC Closure Notification on Completion of 2.5.05.03b (Index Number 570)2021-10-20020 October 2021 Resubmittal of ITAAC Closure Notification on Completion of 2.5.05.03b (Index Number 570) ND-21-0610, Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02a.ii.e (Index Number 768)2021-07-0101 July 2021 Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 3.3.00.02a.ii.e (Index Number 768) ML21123A0352021-05-0303 May 2021 ITAAC Review Status Report 5-3-2021 ND-21-0241, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.01 (Index Number 183)2021-03-15015 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.01 (Index Number 183) ND-21-0242, Notice of Uncompleted ITAAC 225-clavs Prior to Initial Fuel Load Item 2.2.03.08c.iv.03 (Index Number 185)2021-03-15015 March 2021 Notice of Uncompleted ITAAC 225-clavs Prior to Initial Fuel Load Item 2.2.03.08c.iv.03 (Index Number 185) ND-21-0155, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.02 (Index Number 184)2021-03-11011 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iv.02 (Index Number 184) ND-21-0143, Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iii (Index Number 182)2021-03-0909 March 2021 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.03.08c.iii (Index Number 182) ND-20-1108, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.03.02 (Index Number 319)2021-03-0909 March 2021 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.03.02 (Index Number 319) ML21061A2162021-03-0303 March 2021 Annual Assessment Letter for Vogtle Electric Generating Plant Units 3 & 4, NRC Report 05200025/2020006 and 05200026/2020006 ML21032A2602021-02-0101 February 2021 ITAAC Status Report 2-1-2021 ML21032A2652021-02-0101 February 2021 ITAAC Status Report 2-1-2021 ML21004A1102021-01-0404 January 2021 ITAAC Status Report 1-4-2021 ML21277A0512020-11-0404 November 2020 Archives, Closed in Report (NCV) ND-20-1246, Supplement for API 000 ITAAC 2.3.05.03a.ii (Index Number 344) Completion2020-10-27027 October 2020 Supplement for API 000 ITAAC 2.3.05.03a.ii (Index Number 344) Completion ML20281A3832020-10-0101 October 2020 ITAAC Status Report 10-1-2020 ML20281A3952020-10-0101 October 2020 ITAAC Status Report 10-1-2020 ND-20-0002, Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA)2020-01-28028 January 2020 Construction Activities Schedule Six-Month Update for Completion of the Inspections, Tests, and Analyses (ITA) ND-20-0023, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02f (Index Number 774)2020-01-21021 January 2020 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02f (Index Number 774) ND-19-1536, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.08b.ii (Index Number 543)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.08b.ii (Index Number 543) ND-19-1571, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.04.02.1 (Index Number 557)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.04.02.1 (Index Number 557) ND-19-1538, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.09d (Index Number 548)2020-01-0202 January 2020 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.09d (Index Number 548) ND-19-1523, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530)2019-12-19019 December 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530) ND-19-1537, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.1la.ii (Index Number 47)2019-12-19019 December 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.1la.ii (Index Number 47) ND-19-1460, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09a (Index Number 41)2019-12-0202 December 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09a (Index Number 41) ND-19-1263, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.01.04e (Index Number 588)2019-11-25025 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.01.04e (Index Number 588) ND-19-1348, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.a (Index Number 760)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.a (Index Number 760) ND-19-1349, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.b (Index Number 761)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.b (Index Number 761) ND-19-1351, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.d (Index Number 763)2019-11-22022 November 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.02a.i.d (Index Number 763) ND-19-1353, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.02.14 (Index Number 317)2019-11-0606 November 2019 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.02.14 (Index Number 317) ND-19-1333, Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.i (Index Number 75)2019-10-31031 October 2019 Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.03.06.i (Index Number 75) ND-19-1323, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530)2019-10-31031 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.06a.ii (Index Number 530) ND-19-1309, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.02.07a.iii (Index Number 137)2019-10-31031 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.02.07a.iii (Index Number 137) ND-19-1324, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.06.03.1 (Index Number 726)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.06.03.1 (Index Number 726) ND-19-1330, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.29.02 (Index Number 489)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.29.02 (Index Number 489) ND-19-0920, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.03 (Index Number 716)2019-10-29029 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.03 (Index Number 716) ND-19-1311, Unit 4 - Resubmittal Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.10 (Index Number 549)2019-10-28028 October 2019 Unit 4 - Resubmittal Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.10 (Index Number 549) ND-19-1047, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.03.02 (Index Number 555)2019-10-28028 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.03.02 (Index Number 555) ND-19-1316, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.3.8.02.01 (Index Number 843)2019-10-28028 October 2019 Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item C.3.8.02.01 (Index Number 843) 2023-07-30
[Table view] Category:Letter type:ND
MONTHYEARND-24-0103, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0059, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] |
Text
Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tei JUL 1 6 2019 Docket Nos.;52-025 52-026 ND-19-0833 10CFR 52.99(c)(3)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.6.03.04c [Index Number 6031 Ladies and Gentlemen:
Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of July 10, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.03.04c [Index Number 603]
has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).
This letter contains no new NRC regulatory commitments.
If there are any questions, please contact Tom Petrak at 706-848-1575.
Respectfully submitted.
Michael J. Yox /
Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.03.04c [Index Number 603]
MJY/JBN/sfr
U.S. Nuclear Regulatory Commission ND-19-0833 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. R.G. West(w/o enclosures)
Mr. D. L. McKinney (w/o enclosures)
Mr. M. D. Meier(w/o enclosures)
Mr. D. H. Jones(w/o enclosures)
Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Yox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Reauiatorv Commission Mr. W. Jones(w/o enclosures)
Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Convert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. G. Khouri Oalethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen
U.S. Nuclear Regulatory Commission ND-19-0833 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. 0. Durham (w/o enclosures)
Mr. M. M. CorlettI Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. 8. Roetger, Georgia Pubiic Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 1 of 16 Southern Nuclear Operating Company ND-19-0833 Enclosure Vogtle Electric Generating Plant(VEGP)Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.03.04c[Index Number 603]
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 2 of 16 ITAAC Statement Design Commitment 4.c) Each IDS 24-hour battery bank supplies a do switchboard bus load for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> without recharging.
4.d) Each IDS 72-hour battery bank supplies a do switchboard bus load for a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without recharging.
4.e) The IDS spare battery bank supplies a dc load equal to or greater than the most severe switchboard bus load for the required period without recharging.
4.f) Each IDS 24-hour inverter supplies its ac load.
4.g) Each IDS 72-hour inverter supplies its ac load.
4.h) Each IDS 24-hour battery charger provides the PMS with two loss-of-ac input voltage signals.
5.a) Each IDS 24-hour battery charger supplies a dc switchboard bus load while maintaining the corresponding battery charged.
5.b) Each IDS 72-hour battery charger supplies a dc switchboard bus load while maintaining the corresponding battery charged.
5.c) Each IDS regulating transformer supplies an ac load when powered from the 480 V MCC.
- 6. Safety-related displays identified in Table 2.6.3-1 can be retrieved in the MGR.
- 11. Displays of the parameters identified in Table 2.6.3-2 can be retrieved in the MGR.
Insoections/Tests/Analvses Testing of each 24-hour as-built battery bank will be performed by applying a simulated or real load, or a combination of simulated or real loads which envelope the battery bank design duty cycle. The test will be conducted on a battery bank that has been fully charged and has been connected to a battery charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test.
Testing of each 72-hour as-built battery bank will be performed by applying a simulated or real load, or a combination of simulated or real loads which envelope the battery bank design duty cycle. The test will be conducted on a battery bank that has been fully charged and has been connected to a battery charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test.
Testing of the as-built spare battery bank will be performed by applying a simulated or real load, or a combination of simulated or real loads which envelope the most severe of the division batteries design duty cycle. The test will be conducted on a battery bank that has been fully charged and has been connected to a battery charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test.
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 3 of 16 Testing of each 24-hour as-built inverter will be performed by applying a simulated or real load, or a combination of simulated or real loads, equivalent to a resistive load greater than 12 kW.
The inverter input voltage will be no more than 210 Vdc during the test.
Testing of each 72-hour as-built inverter will be performed by applying a simulated or real load, or a combination of simulated or real loads, equivalent to a resistive load greater than 7 kW. The inverter input voltage will be no more than 210 Vdc during the test.
Testing will be performed by simulating a loss of input voltage to each 24-hour battery charger.
Testing of each as-built 24-hour battery charger will be performed by applying a simulated or real load, or a combination of simulated or real loads.
Testing of each 72-hour as-built battery charger will be performed by applying a simulated or real load, or a combination of simulated or real loads.
Testing of each as-built regulating transformer will be performed by applying a simulated or real load, or a combination of simulated or real loads, equivalent to a resistive load greater than 30 kW when powered from the 480 V MCC.
Inspection will be performed for retrievability of the safety-related displays in the MGR.
Inspection will be performed for retrievability of the displays identified in Table 2.6.3-2 in the MGR.
Acceptance Criteria The battery terminal voltage is greater than or equal to 210 V after a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with an equivalent load that equals or exceeds the battery bank design duty cycle capacity.
The battery terminal voltage is greater than or equal to 210 V after a period of no less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with an equivalent load that equals or exceeds the battery bank design duty cycle capacity.
The battery terminal voltage is greater than or equal to 210 V after a period with a load and duration that equals or exceeds the most severe battery bank design duty cycle capacity.
Each 24-hour inverter supplies a line-to-line output voltage of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hz.
Each 72-hour inverter supplies a line-to-line output voltage of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hz.
Two PMS input signals exist from each 24-hour battery charger indicating loss of ac input voltage when the loss-of-input voltage condition is simulated.
Each 24-hour battery charger provides an output current of at least 150 A with an output voltage in the range 210 to 280 V.
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 4 of 16 Each 72-hour battery charger provides an output current of at least 125 A with an output voltage in the range 210 to 280 V.
Each regulating transformer supplies a line-to-line output voltage of 208 +/- 2% V.
Safety-related displays identified in Table 2.6.3-1 can be retrieved in the MGR.
Displays identified in Table 2.6.3-2 can be retrieved in the MGR.
ITAAC Completion Description Multiple ITAAG are performed with inspections and tests to verify the Glass 1E do and Uninterruptible Power Supply System (IDS) 24-hour battery terminal voltage is greater than or equal to 210 V after a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with an equivalent load that equals or exceeds the battery bank design duty cycle capacity, the IDS 72-hour battery terminal voltage is greater than or equal to 210 V after a period of no less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with an equivalent load that equals or exceeds the battery bank design duty cycle capacity, the IDS spare battery terminal voltage is greater than or equal to 210 V after a period with a load and duration that equals or exceeds the most severe battery bank design duty cycle capacity,.and that two Protection and Safety Monitoring System (PMS)input signals exist from each 24-hour battery charger indicating loss of ac input voltage when the loss-of-input voltage condition is simulated.
This ITAAG also verifies each 24-hour inverter supplies a line-to-line output voltage of 208 +/- 2%
V at a frequency of 60 +/- 0.5% Hz, each 72-hour inverter supplies a line-to-line output voltage of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hz, each 24-hour battery charger provides an output current of at least 150 A with an output voltage in the range 210 to 280 V, each 72-hour battery charger provides an output current of at least 125 A with an output voltage in the range 210 to 280 V, and each regulating transformer supplies a line-to-line output voltage of 208 +/- 2% V.
This ITAAG also ensures safety-related displays identified in VEGP Gombined License(GOL)
Appendix G Table 2.6.3-1 can be retrieved in the Main Gontrol Room (MGR)and displays identified in Table 2.6.3-2 can be retrieved in the MGR.
The batterv terminal voltaoe is Greater than or eaual to 210 V after a oeriod of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with an eouivalent load that eouals or exceeds the batterv bank desion dutv cvcle caoacitv.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)or as described in the Quality Release and Gertificate of Gonformance (References 3 and 4)for factory acceptance testing to verify that each IDS 24-hour as-built battery bank terminal voltage is greater than or equal to 210 volts(V) after a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with an equivalent load that equals or exceeds the battery bank IDS 24-hour design duty cycle capacity.
The preoperational test is performed on a fully charged IDS 24-hour battery bank that has been connected to a charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Institute of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS 24-hour battery bank design duty cycle capacity is performed using a load bank to simulate the plant equivalent load profile. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The IDS 24-hour battery bank terminal voltage measurements are summarized in Attachment A.
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 5 of 16 If factory acceptance testing is used in lieu of preoperational testing, the test is performed on a fully charged IDS 24-hour battery bank that has been connected to a charger maintained at an equivalent of 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS 24-hour battery bank design duty cycle capacity is performed using a load bank to simulate the plant equivalent load profile. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The results of the testing are documented in the Quality Release and Certificate of Conformance (References 3 and 4). The IDS 24-hour battery bank terminal voltage measurements are summarized in Attachment A.
The Unit 3 and Unit 4 preoperational test or factory acceptance test results confirm that each IDS 24-hour as-built battery terminal voltage is greater than or equal to 210 V after a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with an equivalent load that equals or exceeds the IDS 24-hour battery bank design duty cycle capacity.
The batterv terminal voltaoe is Greater than or eoual to 210 V after a period of no less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with an equivalent load that eouals or exceeds the battery bank desion dutv cvcle caoacitv.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)or as described in the Quality Release and Certificate of Conformance (References 3 and 4)for factory acceptance testing to verify that each IDS 72-hour as-built battery bank terminal voltage is greater than or equal to 210 volts(V) after a period of no less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with an equivalent load that equals or exceeds the IDS 72-hour battery bank design duty cycle capacity.
The preoperational test is performed on a fully charged IDS 72-hour battery bank that has been connected to a charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS 72-hour battery bank design duty cycle capacity is performed using a load bank to simulate the plant equivalent load profile. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The IDS 72-hour battery bank terminal voltage measurements are summarized in Attachment B.
If factory acceptance testing is used in lieu of preoperational testing, the test is performed on a fully charged IDS 72-hour battery bank that has been connected to a charger maintained at an equivalent of 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS 72-hour battery bank design duty cycle capacity is performed using a load bank to simulate the plant equivalent load profile. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The results of the testing are documented in the Quality Release and Certificate of Conformance (References 3 and 4). The IDS 72-hour battery bank terminal voltage measurements are summarized in Attachment B.
The Unit 3 and Unit 4 preoperational test or factory acceptance test results confirm that each IDS 72-hour as-built battery bank terminal voltage is greater than or equal to 210 V after a period of no less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with an equivalent load that equals or exceeds the IDS 72-hour battery bank design duty cycle capacity.
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 6 of 16 The battery terminal voltaoe is Greater than or eoual to 210 V after a period with a load and duration that eouals or exceeds the most severe battery bank desion duty cvcle capacity.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)or as described in the Quality Release and Certificate of Conformance (References 3 and 4)for factory acceptance testing to verify that the IDS spare as-built battery bank terminal voltage is greater than or equal to 210 V after a period with a load and duration that equals or exceeds the most severe IDS battery bank design duty cycle capacity.
The preoperational test is performed on a fully charged IDS spare battery bank that has been connected to a charger maintained at 270+/-2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS spare battery bank design duty cycle capacity is performed using a load bank to simulate the most severe plant equivalent load profile from any of the 24 or 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> IDS divisions. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The battery terminal voltage at test completion is XXX V for the Unit 3 IDS spare battery bank and XXX V for the Unit 4 IDS spare battery bank which demonstrates the IDS spare batteries meet the acceptance criteria.
If factory acceptance testing is used in lieu of preoperational testing, the test is performed on a fully charged IDS spare battery bank that has been connected to a charger maintained at an equivalent of 270+2 V for a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test. A battery service test in accordance with the provisions of Electrical and Electronics Engineers(IEEE)450-1995 at the IDS spare battery bank design duty cycle capacity is performed using a load bank to simulate the plant equivalent load profile. Battery bank terminal voltages are recorded, corrected for instrument accuracy and compared to the acceptance criteria. The results of the testing are documented in the Quality Release and Certificate of Conformance (References 3 and 4). The battery terminal voltage at test completion is XXX V for the Unit 3 IDS spare battery bank and XXX V for the Unit 4 IDS spare battery bank which demonstrates the IDS spare batteries meet the acceptance criteria.
The Unit 3 and Unit 4 preoperational test or factory acceptance test results confirm that each IDS spare as-built battery bank terminal voltage is greater than or equal to 210 V after a period with a load and duration that equals or exceeds the most severe IDS battery bank design duty cycle capacity.
Each 24-hour inverter supplies a line-to-line cutout voltaoe of 208 +/- 2% V at a freouencv of 60 + 0.5% Hz.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-1DS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)to demonstrate that each IDS 24-hour inverter identified in Table 2.6.3-1 (Attachment C)supplies its ac load.
A load test is performed on each 24-hour inverter by applying a simulated load greater than 12 kilowatts(kW) with input voltage less than or equal to 210Vdc. Inverter input voltage, output voltage, and output frequency are measured during the test, corrected for instrument accuracy and compared to the acceptance criteria. The output voltage is verified to meet the specified
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 7 of 16 acceptance criteria of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hertz(Hz). The results are tabulated in Attachment0for each IDS 24-hour inverter.
The Unit 3 and Unit 4 preoperational test results confirm that each IDS 24-hour inverter supplies a line-to-line output voltage of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hz.
Each 72-hour inverter suoolies a line-to-line outout voltaoe of 208 +/- 2% V at a freouencv of 60 +/-
0.5% Hz.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)to demonstrate that each IDS 72-hour inverter identified in Table 2.6.3-1 (Attachment D)supplies its ac load.
A load test is performed on each 72-hour inverter by applying a simulated load greater than 7 kW with input voltage less than or equal to 210Vdc. Inverter input voltage, output voltage, and output frequency are measured during the test, corrected for instrument accuracy and compared to the acceptance criteria. The output voltage is verified to meet the specified acceptance criteria of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hertz(Hz). The results are tabulated in Attachment D for each IDS 72-hour inverter.
The Unit 3 and Unit 4 preoperational test results confirm that each IDS 72-hour inverter supplies a line-to-line output voltage of 208 +/- 2% V at a frequency of 60 +/- 0.5% Hz.
Two PMS input sionals exist from each 24-hour batten/ charoer indicatino loss of ac inout voltaoe when the loss-of-inout voltaoe condition is simulated.
Testing is performed in accordance with Unit 3 and Unit 4 component test packages SNC921220 and SNCXXXXXX (References 5 and 6)to confirm two PMS input signals exist from each 24-hour battery charger indicating loss of ac input voltage when the loss-of-input voltage condition is simulated.
The component test establishes the initial conditions of the IDS Class 1E DC systems aligned and in service in accordance with the operating procedure. The division A battery charger input breaker is opened and both "Battery Charger UV" bistables are verified to be tripped. The division A battery charger input breaker is closed and both division A "Battery Charger UV" bistable trip indications are verified to have cleared. This testing is repeated for the remaining 24-hour battery chargers and the results are tabulated in Attachment E.
The Unit 3 and Unit 4 test results confirm that two PMS input signals exist from each 24-hour battery charger indicating loss of ac input voltage when the loss-of-input voltage condition is simulated.
Each 24-hour battery charoer provides an outout current of at least 150 A with an output voltaoe in the ranoe 210 to 280 V.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)to confirm that each IDS 24-hour battery charger identified in Table 2.6.3-4(Attachment F) provides an output current of at least 150 A with an output voltage in the range 210 to 280 V.
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 8 of 16 The IDS 24-hour battery bank and do switchboard are disconnected from the IDS 24-hour battery charger and a load bank is then connected to the output of the battery charger. The IDS 24-hour battery charger current and output voltage are measured using the battery charger installed instrumentation and recorded hourly for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The recorded voltage and current remain within the acceptance criteria for each IDS 24-hour battery charger. Output voltage and current are tabulated in Attachment F and demonstrate the IDS as-built 24-hour battery chargers meet the acceptance criteria.
The Unit 3 and Unit 4 preoperational test results confirm that each IDS 24-hour battery charger provides an output current of at least 150 A with an output voltage in the range 210 to 280 V.
Each 72-hour batterv charger provides an output current of at least 125 A with an output voltage in the range 210 to 280 V.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)to confirm that each IDS 72-hour battery charger provides an output current of at least 125 A with an output voltage in the range 210 to 280 V.
The IDS 72-hour battery bank and DC switchboard are disconnected from the IDS 72-hour battery charger and a load bank is then connected to the output of the charger. The IDS 72-hour battery charger operation and output voltage are measured using the charger installed instrumentation and recorded hourly for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The recorded voltage and current remain within the acceptance criteria for each IDS 72-hour battery charger. Output voltage and current are tabulated in Attachment G and demonstrate the IDS 72-hour battery chargers meet the acceptance criteria.
The Unit 3 and Unit 4 preoperational test results confirm that each IDS 72-hour battery charger provides an output current of at least 125 A with an output voltage in the range 210 to 280 V.
Each regulating transformer supplies a line-to-line output voltage of 208 +/- 2% V.
Testing is performed in accordance with Unit 3 and Unit 4 preoperational test procedures 3-IDS-ITPP-501 and 4-IDS-ITPP-501 (References 1 and 2)to confirm that each regulating transformer supplies a line-to-line output voltage of 208 +/- 2% V.
The IDS system is aligned with the division A regulating transformer powered from the 480 V Motor Control Center and supplying a distribution panel with a load bank attached to the distribution panel. The load bank is then adjusted to greater than 30 KW and the division A regulating transformer output is recorded. This testing is repeated for the remaining division inverters. The regulating transformer line to line voltages are tabulated in Attachment H.
The Unit 3 and Unit 4 preoperational test results confirm that each regulating transformer supplies a line-to-line output voltage of 208 +/- 2% V.
Safetv-related disolavs identified in Table 2.6.3-1 can be retrieved in the MCR.
An inspection is performed to verify the retrievability of the Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 safety-related displays in the MCR. The inspection for retrievability
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 9 of 16 confirms tfiat the safety-related displays of the parameters identified in COL Appendix C Table 2.6.3-1 (Attachment I) can be retrieved in the MCR.
The inspection is performed in accordance the Unit 3 and Unit 4 component test package work orders(References 7 and 8, respectively)for IDS component indication verifications, and visually confirms that when each of the safety-related displays identified in Attachment I is summoned at the MCR Protection and Safety Monitoring System (PMS) Visual Display Units (VDUs), the summoned safety-related display appears on the PMS VDU.
The Unit 3 and Unit 4 component test results(References 7 and 8, respectively) confirm that the VEGP Unit 3 and Unit 4 safety-related displays listed in Attachment I can be retrieved in the MCR.
Displavs identified in Table 2.6.3-2 can be retrieved in the MCR.
An inspection is performed to verify the retrievability of the VEGP Unit 3 and Unit 4 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirms that the displays of the parameters identified in COL Appendix C Table 2.6.3-2(Attachment J) can be retrieved in the MCR.
The inspection is performed in accordance with the Unit 3 and Unit 4 component test package work orders(References 7 and 8, respectively) for IDS component indication verifications, and visually confirms that when each of the displays of parameters identified in Attachment J is summoned at an MCR workstation, the summoned plant parameter appears on a display monitor at that MCR workstation.
The Unit 3 and Unit 4 component test results(References 7 and 8, respectively) confirm that the VEGP Unit 3 and Unit 4 plant parameter displays listed in Attachment J can be retrieved in the MCR.
References 1 through 8 are available for NRC inspection as part of Unit 3 and Unit 4 ITAAC Completion Packages(Reference 9 and 10).
List of tTAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.
References favailable for NRC inspection)
- 1. 3-IDS-ITPP-501,"Class 1E DC and UPS Preoperational Tesf
- 2. 4-IDS-ITPP-501,"Class 1E DC and UPS Preoperational Tesf
- 3. XXXXXXXXXX, Unit 3"DB01 Quality Release and Certificate of Conformance"
- 4. YYYYYYYYYY, Unit 4"DB01 Quality Release and Certificate of Conformance"
- 5. SNC921220 "Class 1E DC and Uninterruptible Power Supply System Undervoltage Verifications - ITAAC: SV3-2.6.03.04c Item 4.h"
- 6. SNCXXXX "Class 1E DC and Uninterruptible Power Supply System Undervoltage Verifications - ITAAC: SV4-2.6.03.04c Item 4.h"
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 10 of 16
- 7. SNC921224,"Retrievability of IDS Displays and Parameters ITAAC: SV3-2.6.03.04c Items 6 and 11"
- 8. SNCXXXXXX,"Retrievability of IDS Displays and Parameters ITAAC: SV4-2.6.03.04c Items 6 and 11"
- 9. 2.6.03.04c-U3-CP-Rev 0, ITAAC Completion Package 10.2.6.03.04c-U4-CP-Rev 0, ITAAC Completion Package
- 11. IEEE Std 450-1995,"IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications"
- 12. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 11 of 16 Attachment A Unit Equipment Name Tag No. Battery Bank Terminal Voltage 3 Division A 250 Vdc 24-Hour Battery Bank IDSA-DB-1 XXX 3 Division B 250 Vdc 24-Hour Battery Bank 1 IDSB-DB-1 XXX 3 Division 0250 Vdc 24-Hour Battery Bank 1 IDSC-DB-1 XXX 3 Division D 250 Vdc 24-Hour Battery Bank IDSD-DB-1 XXX 4 Division A 250 Vdc 24-Hour Battery Bank IDSA-DB-1 XXX 4 Division B 250 Vdc 24-Hour Battery Bank 1 IDSB-DB-1 XXX 4 Division 0250 Vdc 24-Hour Battery Bank 1 IDSC-DB-1 XXX 4 Division D 250 Vdc 24-Hour Battery Bank IDSD-DB-1 XXX Attachment B Battery Bank Unit Equipment Name Tag No.
Terminal Voltage 3 Division B 250 Vdc 72-Hour Battery Bank 2 IDSB-DB-2 XXX 3 Division C 250 Vdc 72-Hour Battery Bank 2 IDSC-DB-2 XXX 4 Division B 250 Vdc 72-Hour Battery Bank 2 IDSB-DB-2 XXX 4 Division C 250 Vdc 72-Hour Battery Bank 2 IDSC-DB-2 XXX Attachment 0 Recorded Recorded Output Frequency Unit Equipment Name Tag No. Voltage Range Range (203.84-212.16)
(59.7-60.3) 3 Division A 24-Hour Inverter 1 IDSA-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 3 Division B 24-Hour Inverter 1 IDSB-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 3 Division C 24-Hour inverter 1 IDSC-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 3 Division D 24-Hour Inverter 1 IDSD-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 4 Division A 24-Hour Inverter 1 IDSA-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 4 Division B 24-Hour Inverter 1 IDSB-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 4 Division C 24-Hour Inverter 1 IDSC-DU-1 XXX.XX-YYY.YY XX.X-YY.Y 4 Division D 24-Hour Inverter 1 IDSD-DU-1 XXX.XX-YYY.YY XX.X-YY.Y
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 12 of 16 Attachment D Recorded Output Recorded Unit Equipment Name Tag No. Voltage Range Frequency Range (203.84-212.16) (59.7-60.3) 3 Division B 72-Hour Inverter 2 IDSB-DU-2 XXX.XX-YYY.YY XX.X-YY.Y 3 Division 0 72-Hour Inverter 2 IDSC-DU-2 XXX.XX-YYY.YY XX.X-YY.Y 4 Division B 72-Hour Inverter 2 IDSB-DU-2 XXX.XX-YYY.YY XX.X-YY.Y 4 Division 072-Hour Inverter 2 IDSC-DU-2 XXX.XX-YYY.YY XX.X-YY.Y Attachment E Battery Charger UV RMS Unit Equipment Name *Tag No.
Alarms 3 Division A 24-Hour Battery Charger 1 IDSA-DC-1 Yes 3 Division B 24-Hour Battery Charger 1 IDSB-DC-1 Yes 3 Division C 24-Hour Battery Charger 1 IDSC-DC-1 Yes 3 Division D 24-Hour Battery Charger 1 IDSD-DC-1 Yes 4 Division A 24-Hour Battery Charger 1 IDSA-DC-1 Yes 4 Division B 24-Hour Battery Charger 1 IDSB-DC-1 Yes 4 Division C 24-Hour Battery Charger 1 IDSC-DC-1 Yes 4 Division D 24-Hour Battery Charger 1 IDSD-DC-1 Yes Attachment F Output Voltage Minimum Unit Equipment Name *Tag No. Range Recorded (210-280 V) Current 3 Division A 24-Hour Battery Charger 1 IDSA-DC-1 XXX-YYY XXX 3 Division B 24-Hour Battery Charger 1 IDSB-DC-1 XXX-YYY XXX 3 Division C 24-Hour Battery Charger 1 IDSC-DC-1 XXX-YYY XXX 3 Division D 24-Hour Battery Charger 1 IDSD-DC-1 XXX-YYY XXX 3 Spare Battery Charger 1 IDSS-DC-1 XXX-YYY XXX 4 Division A 24-Hour Battery Charger 1 IDSA-DC-1 XXX-YYY XXX 4 Division B 24-Hour Battery Charger 1 IDSB-DC-1 XXX-YYY XXX 4 Division C 24-Hour Battery Charger 1 IDSC-DC-1 XXX-YYY XXX 4 Division D 24-Hour Battery Charger 1 IDSD-DC-1 XXX-YYY XXX 4 Spare Battery Charger 1 IDSS-DC-1 XXX-YYY XXX
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 13 of 16 Attachment G Output Minimum Voltage Unit Equipment Name Tag No. Recorded Range Current (210-280 V)
Division B 72-Hour Battery 3 IDSB-DC-2 XXX-YYY XXX Charger 2 Division C 72-Hour Battery 3 IDSC-DC-2 XXX-YYY XXX Charger 2 Division B 72-Hour Battery 4 IDSB-DC-2 XXX-YYY XXX Charger 2 Division C 72-Hour Battery 4 IDSC-DC-2 XXX-YYY XXX Charger 2 Attachment H Unit LIne-to-Llne Voltage Equipment Name Tag No.
A-B B-C A-C 3 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 3 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 3 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 3 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 4 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 4 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 4 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X 4 Division A Regulating Transformer IDSA-DT-1 XXX.X XXX.X XXX.X Attachment I
- Excerpt from COL Appendix C Tab e 2.6.3-1 Unit ^Equipment Name *Tag No. *Safety-Related Display 3 Division A 250 Vdc Switchboard 1 IDSA-DS-1 Yes(Bus Voltage) 3 Division B 250 Vdc Switchboard 1 IDSB-DS-1 Yes(Bus Voltage) 3 Division B 250 Vdc Switchboard 2 IDSB-DS-2 Yes(Bus Voltage) 3 Division C 250 Vdc Switchboard 1 IDSC-DS-1 Yes(Bus Voltage) 3 Division C 250 Vdc Switchboard 2 IDSC-DS-2 Yes(Bus Voltage) 3 Division D 250 Vdc Switchboard 1 IDSD-DS-1 Yes(Bus Voltage) 4 Division A 250 Vdc Switchboard 1 IDSA-DS-1 Yes(Bus Voltage) 4 Division B 250 Vdc Switchboard 1 IDSB-DS-1 Yes(Bus Voltage) 4 Division B 250 Vdc Switchboard 2 IDSB-DS-2 Yes(Bus Voltage) 4 Division C 250 Vdc Switchboard 1 IDSC-DS-1 Yes(Bus Voltage) 4 Division C 250 Vdc Switchboard 2 IDSC-DS-2 Yes(Bus Voltage) 4 Division D 250 Vdc Switchboard 1 IDSA-DS-1 Yes(Bus Voltage)
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 14 of 16 Attachment J
- Excerpt from COL Appendix 0 Table 2.6.3-2 Unit *Equlpment *Tag No. *Dlsplay/Status Indication IDSA-DV-1 Yes 3 Division A Battery Monitor (Battery Ground Detection, Battery High Discharge Rate)
IDSB-DV-1 Yes Division B 24-Hour Battery 3 (Battery Ground Detection, Monitor Battery High Discharge Rate)
IDSB-DV-2 Yes Division B 72-Hour Battery 3 (Battery Ground Detection, Monitor Battery High Discharge Rate)
IDSC-DV-1 Yes Division 0 24-Hour Battery 3 (Battery Ground Detection, Monitor Battery High Discharge Rate)
IDSC-DV-2 Yes Division C 72-Hour Battery 3 (Battery Ground Detection, Monitor Battery High Discharge Rate)
IDSD-DV-1 Yes 3 Division D Battery Monitor (Battery Ground Detection, Battery High Discharge Rate)
IDSA-DF-1 Yes Division A Fused Transfer Switch 3 (Battery Current, Battery Box Disconnect Switch Position)
IDSB-DF-1 Yes Division B 24-Hour Fused Transfer 3 (Battery Current, Battery
. Switch Box Disconnect Switch Position)
IDSB-DF-2 Yes Division B 72-Hour Fused Transfer 3 (Battery Current, Battery Switch Box Disconnect Switch Position)
IDSC-DF-1 Yes Division 0 24-Hour Fused Transfer 3 (Battery Current, Battery Switch Box Disconnect Switch Position)
IDSC-DF-2 Yes Division 072-Hour Fused Transfer 3 (Battery Current, Battery Switch Box Disconnect Switch Position)
IDSD-DF-1 Yes Division D Fused Transfer 3 (Battery Current, Battery Switch Box Disconnect Switch Position)
IDSA-DC-1 Yes 3 Division A Battery Charger (Charger Output Current, Charger Trouble(l))
IDSB-DC-1 Yes Division B 24-Hour Battery 3 (Charger Output Current, Charger Charger Trouble(1))
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 15 of 16 Unit *Equipment *Tag No. *Display/Status Indication IDSB-DC-2 Yes Division B 72-Hour Battery 3 (Charger Output Current, Charger Charger Trouble(1))
IDSC-DC-1 Yes Division C 24-Hour Battery 3 (Charger Output Current, Charger Charger Trouble(1))
IDSC-DC-2 Yes Division C 72-Hour Battery 3 (Charger Output Current, Charger Charger Trouble(l))
IDSD-DC-1 Yes 3 Division D Battery Charger (Charger Output Current, Charger Troubled))
Division A Battery Monitor IDSA-DV-1 Yes 4 (Battery Ground Detection, Battery High Discharge Rate)
Division B 24-Hour Battery IDSB-DV-1 Yes 4 Monitor (Battery Ground Detection, Battery High Discharge Rate)
Division B 72-Hour Battery IDSB-DV-2 Yes 4 Monitor (Battery Ground Detection, Battery High Discharge Rate)
Division C 24-Hour Battery IDSC-DV-1 Yes 4 Monitor (Battery Ground Detection, Battery High Discharge Rate)
Division C 72-Hour Battery IDSC-DV-2 Yes 4 Monitor (Battery Ground Detection, Battery High Discharge Rate)
Division D Battery Monitor IDSD-DV-1 Yes 4 (Battery Ground Detection, Battery High Discharge Rate)
Division A Fused Transfer Switch IDSA-DF-1 Yes 4 Box (Battery Current, Battery Disconnect Switch Position)
Division B 24-Hour Fused Transfer IDSB-DF-1 Yes 4 Switch Box (Battery Current, Battery Disconnect Switch Position)
Division B 72-Hour Fused Transfer IDSB-DF-2 Yes 4 Switch Box (Battery Current, Battery Disconnect Switch Position)
Division C 24-Hour Fused Transfer IDSC-DF-1 Yes 4 Switch Box (Battery Current, Battery Disconnect Switch Position)
Division C 72-Hour Fused Transfer IDSC-DF-2 Yes 4 Switch Box (Battery Current, Battery Disconnect Switch Position)
Division D Fused Transfer IDSD-DF-1 Yes 4 Switch Box (Battery Current, Battery Disconnect Switch Position)
U.S. Nuclear Regulatory Commission ND-19-0833 Enclosure Page 16 of 16 Unit 'Equipment 'Tag No. 'Dispiay/Status Indication Division A Battery Charger IDSA-DC-1 Yes 4 (Charger Output Current, Charger Trouble(l))
Division B 24-Hour Battery IDSB-DC-1 Yes 4 Charger (Charger Output Current, Charger Trouble(l))
Division B 72-Hour Battery IDSB-DC-2 Yes 4 Charger (Charger Output Current, Charger Trouble(l))
Division C 24-Hour Battery IDSC-DC-1 Yes 4 Charger (Charger Output Current, Charger Trouble(l))
Division C 72-Hour Battery IDSC-DC-2 Yes 4 Charger (Charger Output Current, Charger Trouble(l))
Division D Battery Charger IDSD-DC-1 Yes 4 (Charger Output Current, Charger Trouble(1))
Note:(1)Battery charger trouble includes charger dc output under/over voltage