ML19156A116

From kanterella
Jump to navigation Jump to search

Acceptance of Requested Licensing Action Adoption of TSTF-490
ML19156A116
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/04/2019
From: Marshall M
Plant Licensing Branch 1
To: Enrique Villar
Exelon Generation Co
Marshall M, NRR/DORL/LPLI, 415-2871
References
EPID L-2019-LLA-0102
Download: ML19156A116 (2)


Text

From:

Marshall, Michael To:

Villar, Enrique:(GenCo-Nuc) (Enrique.Villar@exeloncorp.com)

Cc:

James Danna (James.Danna@nrc.gov)

Subject:

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Re: Adoption of TSTF-490 (EPID L-2019-LLA-0102)

Date:

Tuesday, June 04, 2019 3:42:00 PM Hello Rick,

By letter dated May 6, 2019, Exelon Generation Company, LLC (Exelon) submitted a request to change Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Technical Specification Limiting Condition for Operations 3.4.15, RCS Specific Activity, and associated surveillance requirements (ADAMS Accession No. ML19127A076). Exelon states that the proposed change is consistent with NRC-approved Technical Specification Task Force Standard Technical Specification Traveler - 490, Revision 1, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> to complete. The NRC staff expects to complete the reviews by the end of June 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-317 and 50-318