ML19122A239

From kanterella
Jump to navigation Jump to search

Miscellaneous Exam Material (Folder 1)
ML19122A239
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/12/2019
From: Swiger K
Exelon Generation Co
To: David Silk
Operations Branch I
Shared Package
ML18296A408 List:
References
EPID L-2019-OLL-0036
Download: ML19122A239 (10)


Text

ID Exelon Generation, January 9, 2019 U.S. Nuclear Regulatory Commission ATIN: Mr. D. Lew, Acting Regional Administrator Region I 2100 Renaissance Boulevard King of Prussia, PA 19406

Subject:

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Facility Operating License Nos. DPR-53 and DPR-69 Submittal of Initial Operator License Examination Outline Todd A. Tierney Plant Manager Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5205 Office 484 459 0142 Mobile www.exeloncorp.com todd.tierney@exelon.com Enclosed are the examination outlines supporting the initial license exam scheduled for the week of March 25, 2019 at Calvert Cliffs Nuclear Power Plant.

This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Exaniiination Standards for Power Reactors," Revision 11.

In accordance with NUREG-1021, Revislon 11, Section ES-201, "Initial Operator Licensing ExaminatiJn Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

For questions concerning the examination materials, please contact Mr. Scott Stillings at (410) 495-3520.

Respectfully,

~y~~

Plant Manager TAT/PSF/lmd

Mr. D. Lew January 9, 2019 Page 2

Enclosures:

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline(s) (Form ES-301-1)

Control Room/In-plant Systems Outline (Form ES-301-2)

PWR Examinations Outline (Form ES-401-2)

Generic Knowledge and Abilities Outline (Tier3) (Form ES-401-3)

Scenario Outlines (Form ES-D-1)

Completed Checklists Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc:

(With Enclosures) (via FedEx)

D. Silk, Chief Examiner, NRC Region I (Without Enclosures)

Chief, NRC Operator Licensing Branch NRC Resident Inspector, Calvert Cliffs

Mr. D. Lew January 9, 2019 Page 3 bee:

(Without Enclosures)

J. Barstow D. T. Gudger R. Villar M. D. Flaherty T. A. Tierney M. D. Milbradt L. D. Smith J. L. Jackson S. Stilling EDMS NRG 19-001

February 21, 2019 U.S. Nuclear Regulatory Commission ATIN: Mr. D. Lew, Acting Regional Administrator Region I 2100 Renaissance Boulevard King of Prussia, PA 19406 Calvert Cliffs Nuclear Power Plant L!nit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Facility Operating License Nos. DPR-53 and DPR-69 Mark D. Flaherty Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5200 Office 443 534-5475 Mobile www.exelontorp.rom mark flah~~rty@exe/oncorp com

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Calvert Cliffs Nuclear Power Plant is submitting in support of the initial license exam scheduled for the week of March 25, 2019.

This submittal includes the Senior Reactor Operator and Reactor Operator Written examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021, Revision 11.

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 11, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Mr. D. Lew February 21, 2019 Page 2 Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

For questions concerning the examination materials, please contact Mrs. Megan Parlett (410) 495-3960.

Respectfully, Mark D. Flaherty Site Vice President MDF/LDS/lmd

Enclosures:

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures Administrative Topic Job Performance Measures Integrated Plant Operation Scenario Guides Completed Checklists Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Written Exam Quality Checklist (Form ES-401-6)

Examination Security Agreements (Form ES-201-3)

Scenario Outlines (Form ES-D-1) cc:

{With Enclosures) (via FedEx)

D. Silk, Chief Examiner, NRC Region I

{Without Enclosures)

Chief, NRC Operator Licensing Branch NRC Resident Inspector, Calvert Cliffs

Mr. D. Lew February 21, 2019 Page 3 bee:

(Without Enclosures)

J. Barstow D. T. Gudger R. Villar M. D. Flaherty T. A. Tierney M. L. Milbradt L. D. Smith J. L. Jackson S. Stilling NRC 19-008

Silk, David From:

Sent:

To:

Cc:

Subject:

Dave, Swiger, Kevin:(GenCo-Nuc) < kevin.swiger@exeloncorp.com >

Monday, April 08, 2019 10:11 AM Silk, David Parlett, Megan R:(GenCo-Nuc)

[External_Sender] Exam Question Review We reviewed Question #99 and confirmed that the answer is correct and is supported by the procedure and the AOP Technical Basis document.

The analysis with student feedback concluded that the question was worded correctly. Both candidates missed the question due to the recent changes to AOP-9A in both procedural content and overall plant strategy during a Control Room evacuation and safe shutdown scenario. The candidates understandably remembered the previous strategy of establishing cold shutdown conditions and the previous method of using Aux Spray to depressurize the RCS. Even though the procedural changes were included in the lesson plan and taught to the class, the candidates did not recall the specific RCS pressure change or the change in the use of Aux Spray.

Kevin Swiger This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.

Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 1

March 2019 NRC Exam Schedule Monday Tuesday Wednesday Thursday Friday Time 3/25/19 3/26/19 3/27/19 3/28/19 3/29/19 0700 0730 0800 Scenario 0830 0900 Exam Review 0930 1000 NRC Entrance Meeting Sim 2 & 3 1030 Plant 1&2 1100 1130 Lunch Lunch Lunch SRO Written Exam Lunch 1200 1230 Sim 1 1300 Admin 1&2 1330 Admin 5 1400 1430 1500 Admin 3&4 1530 1600

Calvert Cliffs Applicant Questions/Responses 3/28/2019 Written Exam Applicant Question Question

Response

Number Is the word "and" in the stem specifically Answer the question to the best of your ability with the information important regarding controlling pressure provided Appl;c-i" f-i 32 and subcooling. For example, does the answer have to control both pressure AND subcooling.

Silk, David From:

Sent:

To:

Cc:

Subject:

Dave, Stillings, Herbert S:(GenCo-Nuc) < Herbert.Stillings@exeloncorp.com>

Saturday, October 27, 2018 10:48 AM Silk, David Jackson, Donald

[External_Sender] ILT Exam - Calvert Cliffs Nuclear Power Plant Calvert Cliffs is requesting an ILT NRC Exam for two License Candidates during the week of March 25th, 2019 for:

One SRO-I license candidate who failed the written portion of our 2018 ILT Exam -Written Exam One SRO-U license candidate who was medically unable to take the 2018 ILT Exam -Written and Operating Exam.

The Exam Author for this exam will be:

Megan Parlett 410-495-6312 Megan.Parlett@exeloncorp.com Thank you, Scott Stillings OPS Training Cavlert Cliffs 410-495-3520 This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s}, you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.

Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 1