ML19098B271
| ML19098B271 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/10/2019 |
| From: | David Silk NRC Region 1 |
| To: | Exelon Generation Co |
| Shared Package | |
| ML18296A408 | List: |
| References | |
| EPID L-2019-OLL-0036 | |
| Download: ML19098B271 (1) | |
Text
Calvert Cliffs Operations Test Comments Sim JPM 1 - No comment.
Sim JPM 2-No comment.
Sim JPM 3 - Singular pump (vs plural) in initiating cue.
In-plant JPM 1 - Specify in IC that the applicant has appropriate keys. Specify in cues for JPM steps 1 and 2 that the amber light is not lit when key switch is turned.
In-plant JPM 2 - No comment.
SRO Admin JPM 1 - Specify that this is for normal (e.g., not refueling) SRO.
SRO Admin JPM 2 - Include in examiner cue the condensate and feedwater sodium levels as well as SG sodium levels.
SRO Admin JPM 3 - Include expectation to take calculations out to 4th decimal point in initiating cue.
SRO Admin JPM 4 - For Job 1 change expected emergency exposure to greater than 25 Rem.
Scenario 1 - Specify times for CTs 1 and 2.
Scenario 2 - Event 3: Specify what TS are applicable.