ML19102A136
| ML19102A136 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/29/2019 |
| From: | Hamilton T Duke Energy Progress |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19102A137 | List:
|
| References | |
| RA-19-0160 | |
| Download: ML19102A136 (19) | |
Text
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED
( ~ DUKE ENERG'l Tanya M. Hamilton Vice President Harris Nuclear Plant 5413 Shearon Harris Rd New Hill, NC 27562 919-362-2502 10 CFR 50.71(e)
March 29, 2019 Seri a I: RA-19-0160 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63
Subject:
FSAR Amendment No. 62 - Resubmittal
References:
Letter from Tanya M. Hamilton to NRC Document Control Desk, "FSAR Amendment No. 61," dated May 10, 2017 (ADAMS Accession No. ML18337A205)
Ladies and Gentlemen:
In accordance with 10 CFR 50.71 (e), Duke Energy Progress, LLC, hereby submits the enclosed CD-ROM (Enclosure 1) for periodic update to the Final Safety Analysis Report (FSAR) for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). Amendment No. 62 to the HNP FSAR includes changes to the plant and analyses prepared pursuant to NRC requirements since Amendment No.
61, submitted by letter dated May 10, 2017. Amendment No. 62 reflects updates through May 10, 2018 (end of Refueling Outage 21). This FSAR update also includes some changes that have been approved and incorporated up through August 23, 2018. Reference the attached Table 1 for a summary of the incorporated changes. This resubmittal supersedes the prior package submitted on November 5, 2018 (ADAMS Accession No. ML18355A274), in its entirety.
Also enclosed is a separate CD-ROM (Enclosure 2) with a version of the HNP FSAR to be used for proactive release to the public in accordance with the Commission's direction in Staff Requirements Memorandum (SRM)-SECY-15-0032, "Reviewing Documents for Public Release Using Sensitive Unclassified Non-Safeguards Information Guidance." This version of the HNP FSAR has redacted physical protection information to be withheld per 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." The information withheld was selected per the guidance of SECY-04-0191, "Withholding Sensitive Unclassified Information Concerning Nuclear Power Reactors from Public Disclosure" as noted applicable by RIS 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents."
This amendment includes a reduction to the level of detail contained in the FSAR relating to HNP's turbine missile probability analysis. Specifically, Engineering Change (EC) 402153, Low Pressure Turbine Steam Path Replacement, required changes to the turbine missile probability analysis.
The EC removed excessive details from the FSAR, including section 3.5.1 and supporting figures, Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 as well as section 18.2.5. A reference to the calculation now containing the details of the turbine missile probability analysis was added.
Two CD-ROMs are included in this submission, identified as Enclosure 1 and Enclosure 2. Both CDs contain two folders each. Folder "Harris Nuclear Plant FSAR Amendment 62" contains files associated with the FSAR, including the FSAR cover sheet, the List of Effective pages, files for each FSAR chapter, the Three Mile Island appendix, appendix A, and appendix B. Folder "Documents Incorporated By Reference" contains copies of documents incorporated by reference, as defined in NEI 98-03, "Guidelines for Updating Final Safety Analysis Reports," that have been updated since FSAR Amendment No. 61. Reference Table 2 attached for a list of the updated documents incorporated by reference. The remainder of the documents incorporated by reference were submitted with Amendment No. 61.
The CD for Enclosure 1 contains information as described above, including sensitive information identified for redaction. Enclosure 1 should be withheld from public disclosure per 10 CFR 2.390(d)(1). The CD for Enclosure 2 contains the same information, except all sensitive information is withheld. Reference Tables 2 and 3 attached for all material identified for redaction. Enclosure 2 may be proactively released to the public.
There are no new regulatory commitments contained in this letter. Questions regarding this submittal may be referred to Art Zaremba, Fleet Licensing Manager, at (980) 373-2062.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on March.2. q,
2019.
Sincerely,
~rt~~
Tanya M. Hamilton
Enclosures:
- 1) CD-ROM "Harris Nuclear Plant Amendment 62 Submittal" (Non-redacted Version.
Withhold from proactive public release per 10 CFR 2.390(d)(1).)
- 2) CD-ROM "Harris Nuclear Plant Amendment 62 Submittal, Redacted Version" (This CD may be proactively released to the public. This CD includes redacted versions of FSAR figures identified as sensitive. Documents incorporated by reference that are flagged for redaction are not included. Refer to the tables that follow.)
cc:
J. Zeiler, NRC Senior Resident Inspector, HNP M. Barillas, NRC Project Manager, HNP NRC Regional Administrator, Region II Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 2 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SE PARA TED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 1: Summary of HNP FSAR Updates FSAR Section Summary of Change 7.3.1.5.4; Engineering Change provided indication that a trip 9.2.8.5 condition exists to the Main Control Board for those parameters that are important to the immediate reliability of the Essential Services Chilled Water chiller while in standby mode.
3.1.37; 3.6.1.1; 3.6.1.2; Remove H2 Electric Recombiner along with associated Table 3.9.2-1 ; Table 3.11.0-1; controls, related discussion concerning LOCA hydrogen 6.2.1.1.3.2; 6.2.5; 6.2.5.1.1; generation and completion of implementation of 6.2.5.1.2; 6.2.5.2.1; 6.2.5.2.2; Operating License Amendment No. 131.
6.2.5.4.1; 6.2.5.5.1; 6.2.5.6; Table 6.2.1-7; Table 6.2.1-8; Table 6.2.5-1 ; Table 6.2.5-6; Table 6.2.5-7; Figure 6.2.5-1 ;
Figure 6.2.5-2; Figure 6.2.5-3; Figure 6.2.5-4; Figure 6.2.5-6; 7.3.1.4.1; 7.5.1.3.6; Table 16.3-6 Table 9.5.2-2 Add new telephone and sound powered phones for the Control System Computer Room.
9.4.4; 9.4.4.1.4; 9.4.4.2.4; Update FSAR to reflect the abandonment of the Table 9.4.4-4; Condenser Vacuum Pump Effluent Treatment System 10.4.2; Table 10.1.0-1 (CVPETS). Removed content related to the system.
11.5.1.3.1 Table 1.6-3; Update to FSAR to reflect implementation of a new 3.5.1.3.1 ;
Turbine Control System.
7.2.1.1.2; 10.2.2.5; 10.2.3.4; 10.2.3.6; 10.2.4; Figure 10.2.2-10 15.2.3.1 ; 15.4.3.1.1 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 3 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 1: Summary of HNP FSAR Updates FSAR Section Summary of Change 15.2.6.1; 15.2.6.2; 15.2.6.4; Revision to safety analysis to address error in vendor 15.2.7.2; 15.2.7.3; 15.2.8.2; product that affected events that trip on low-low steam Table 15.0.8-1 ; Table 15.2.6-4; generator level (Loss of Non-emergency AC in Section Table 15.2.7-4; Table 15.2.8-1; 15.2.6, Loss of Normal Feedwater in Section 15.2.7, and Table 15.2.8-3; Table 15.2.8-5; Feedwater Line Break in Section 15.2.8).
Figure 15.2.6-1 ; Figure 15.2.6-2; Figure 15.2.6-3; Figure 15.2.6-4; Figure 15.2.6-5; Figure 15.2.7-1 ;
Figure 15.2.7-2; Figure 15.2.7-3; Figure 15.2.7-4; Figure 15.2.7-5; Figure 15.2.8-11; Figure 15.2.8-12; Figure 15.2.8-13; Figure 15.2.8-14; Figure 15.2.8-15; Figure 15.2.8-16; Figure 15.2.8-17; Figure 15.2.8-18; Figure 15.2.8-19; Figure 15.2.8-20 15.6.2 Removes sentence not relevant to the letdown line break accident sequence or radiological evaluation. Change adds clarification to FSAR Section 15.6.2.2.
6.2.2.3.2.1; 6.3.2.8; Table 6.2.2-8; Reflect changes associated with a proposed reduction in Table 6.3.2-1; Table 6.3.2-9 surveillance tolerances for Emergency Diesel Generator frequency and voltage: 1) an increase in the calculated maximum Refueling Water Storage Tank volume required for switchover from injection to recirculation mode; and 2) a reduction in the calculated net positive suction head margin available to the containment spray pumps in injection and recirculation modes.
6.3.2.8; Reflect update to content related to post-LOCA 15.6.5.4.2; Table 15.6.5-12 backleakage to Radioactive Waste Storage Tank (RWST) dose component of total LOCA dose, including backleakage paths leading to RWST air and water volumes.
9.2.9.1; 9.2.9.2; 9.4.3.2.4; Revised to reflect upgrade of waste gas compressor 11.3.2.1.1; Figure 11.3.2-7 skids and addition of waste gas precooler to Waste Processing Building Component Cooling Water.
Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 4 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 1: Summary of HNP FSAR Updates FSAR Section Summary of Change 1.8; Reflect implementation of Operating License Amendment Table 6.5.1-2 No. 156 adopting TSTF-522, Revision 0, "Revise Ventilation System Surveillance Requirements to Operate for 10 Hours per Month" (15-minute runtime versus 10-hour runtime).
1.8 Reflect implementation of Operating License Amendment No. 158 that affords HNP the ability to take exception to the Regulatory Guide (RG) 1.137 requirement of sampling the new diesel fuel on-site prior to offload.
Amendment also allows for 31 days, as compared to the previous 30, to complete the analyses of fuel oil properties listed in applicable sections of Part C.2.b of RG 1.137.
1.2.2.6; Table 1.6-1 ;
Reflect replacement of Low Pressure (LP) Turbine steam 3.5.1.3; 3.5.1.3.1 ; 3.5.1.3.2; paths, installation of new LP turbine rotors.
3.5.1.3.3; 3.5.1.3.4; 3.5.1.3.5; 3.5.1.3.6; 3.5.3.2;
References:
Section 3.5; Table 3.5.1-8; Table 3.5.1-9; Table 3.5.1-1 O; Table 3.5.1-11 ;
Table 3.5.1-12; Table 3.5.1-13; Table 3.5.1-14; Figure 3.5.1-4; Figure 3.5.1-4A; Figure 3.5.1-5; Table 9.3.2-2a; Table 9.3.2-2b; 10.2.1 ; 10.2.2.1; 10.2.2.3; 10.2.2.4; 10.2.3.1.2; 10.2.3.2; 10.2.3.4; 10.2.3.5; 10.2.3.6; Table 10.1.0-1 ;
Table 10.2.1-1 ; Figure 10.1.0-7; Figure 10.1.0-9; 18.2.5 9.5.2.2; 9.5.2.2.o Editorial clarifications to reflect that the siren system is an offsite communication system for the general public and that it is described in the Emergency Plan.
Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page5 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 1: Summary of HNP FSAR Updates FSAR Section Summary of Change 1.8 Reflect that annual retraining of personnel not requiring NRC licenses will be conducted on a frequency as determined using processes derived from the Systematic Approach to Training, prescribed per the Institute of Nuclear Power Operations (INPO).
13.1.2.2.6 Improve alignment between FSAR and ANSI N18.7-1976 standard regarding responsibility to determine the circumstances, analyze the cause, and determine that operations can proceed safely before the reactor is returned to power after a trip or an unscheduled or unexplained power reduction.
11.5.2.5.5; 11.5.2.5.8 Remove excessive detail associated with model-specific flowrates from the Noble Gas and Particulate detector descriptions.
9.5.2.2.1; 9.5.2.2.m; 9.5.2.3.1.a Reflect the implementation of Operating License Amendment No. 160 regarding the utilization of the Common Emergency Operating Facility (EOF).
3.9.6 Editorial clarification to point to a generalized reference.
Table 9.2.1-6 Revision to Service Water Outlet Temperature for standby Diesel Generators.
11.3.1; 11.3.2.2.2; 11.3.2.2.3; Reflect upgrade of waste gas analyzers for Recombiner 11.3.2.2.3.1; 11.3.2.2.3.2; B.
Figure 11.3.2-8 Figure 8.1.3-3 Reflect transfer of Switchyard Station Service Power from Station General Service Bus to Transmission Grid and remove excessive information from the figure that is not used to support NRC safety and licensing reviews.
References:
Section 15.8 Reflect revision to the Westinghouse Anticipated Transient Without Scram (A TWS) analysis.
Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 6 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 1: Summary of HNP FSAR Updates FSAR Section Summary of Change 3.5.1; Table 3.2.1-1 ;
Reflect hydrogen analyzer and monitoring safety 6.2.5.2.1; Table 6.1.1-1 ;
classification downgrade and electric hydrogen Table 6.5.3-1 ;
recombiner removal.
Table 8.1.3-1; Table 8.3.1-2c Table 6.2.1-33; Updates for HNP Cycle 22 fuel changes, typo corrections, 15.1.5.2; 15.4.1.2; 15.4.3.1.2; and adjustments to align Chapter 15 safety analysis with 15.4.3.2.3; 15.6.5.2.4; 15.6.5.3.4; Technical Specification requirements.
Table 15.0.6-2; Table 15.4.1-4 3.9.3.4.2 Updated information for hydraulic snubbers as it relates to applicability of ASME 111, Subsection NF, 1998 Edition, including Addenda through 2000, and Regulatory Guide 1.84.
15.0.9.1 ; 15.7.4.2.1; 15.7.4.2.2; Operating License Amendment No. 163 approved 15.7.4.2.3; 15.7.4.2.5; 15.7.4.5; changes to the facility as described in the FSAR to
References:
Section 15.7; provide gap release fractions for high-burnup fuel rods Table 15.7.4-1 ; Table 15.7.4-2; (i.e., greater than 54 gigawatt days per metric ton of Table 15.7.4-3; Table 15.7.4-4 uranium) that exceed the 6.3 kilowatt per foot linear heat generation rate limit detailed in Table 3 of Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, Revision 0.
Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 7 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 2: Documents Incorporated by Reference Updated Since Amendment No. 61 File No.
Document No.
Revision No.
File Classification Drawings Part 1 5-G-0005 31 Redact Drawings Part 1 5-G-0006 20 Redact Drawings Part 1 5-G-0012 23 Redact Drawings Part 1 5-G-0013 18 Redact Drawings Part 1 5-G-0015 20 Redact Drawings Part 1 5-G-0016 27 Redact Drawings Part 1 5-G-0018 35 Redact Drawings Part 1 5-G-0019 34 Redact Drawings Part 1 5-G-0020 26 Redact Drawings Part 1 5-G-0022 28 Redact Drawings Part 1 5-G-0036-S01 11 Redact Drawings Part 1 5-G-0036-S02 10 Redact Drawings Part 1 5-G-0041 14 Publicly Available Drawings Part 1 5-G-0042 39 Publicly Available Drawings Part 1 5-G-0043 31 Publicly Available Drawings Part 1 5-G-0044 55 Publicly Available Drawings Part 1 5-G-0046 44 Publicly Available Drawings Part 1 5-G-0048 74 Publicly Available Drawings Part 1 5-G-0049-S01 41 Publicly Available Drawings Part 1 5-G-0050 28 Publicly Available Drawings Part 1 5-G-0058 25 Publicly Available Drawings Part 1 5-G-0088 36 Publicly Available Drawings Part 1 5-G-0133 23 Publicly Available Drawings Part 1 5-G-0305 19 Publicly Available Drawings Part 1 5-G-0307 13 Publicly Available Drawings Part 1 5-G-0804 25 Publicly Available Drawings Part 2 5-G-0805 39 Publicly Available Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 8 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 2: Documents Incorporated by Reference Updated Since Amendment No. 61 File No.
Document No.
Revision No.
File Classification Drawings Part 2 5-G-0817 28 Publicly Available Drawings Part 2 5-G-0818 26 Publicly Available Drawings Part 2 5-G-0819 28 Publicly Available Drawings Part 2 5-G-0876 20 Publicly Available Drawings Part 2 5-G-0877 10 Publicly Available Drawings Part 2 5-G-0910 20 Redact Drawings Part 2 5-G-0917 19 Redact Drawings Part 2 5-G-0918 18 Redact Drawings Part 2 6-8-401-0050H 9
Publicly Available Drawings Part 2 6-8-430-31.83 8
Publicly Available Drawings Part 2 6-8-430-31.83A 12 Publicly Available Drawings Part 2 6-G-0025 8
Publicly Available Drawings Part 2 6-G-0172 16 Publicly Available Drawings Part 2 6-G-0425-S01 11 Publicly Available Drawings Part 2 7-G-0512 10 Publicly Available Drawings Part 2 7-G-2847 13 Redact Drawings Part 2 7-G-2875 14 Redact Drawings Part 2 7-G-2877 12 Redact Drawings Part 2 8-G-0497-S01 10 Publicly Available Drawings Part 2 8-G-0498-S02 34 Publicly Available Drawings Part 3 8-G-0517-S04 13 Publicly Available Drawings Part 3 8-G-0525-S05 6
Redact Drawings Part 3 8-G-0533-S04 12 Publicly Available Drawings Part 3 8-G-0533-S06 10 Publicly Available Drawings Part 3 8-G-0533-S07 18 Publicly Available Drawings Part 3 1364-000878 10 Publicly Available Drawings Part 3 1364-002795-S01 18 Publicly Available Drawings Part 3 1364-002795-S02 18 Publicly Available Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 9 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 2: Documents Incorporated by Reference Updated Since Amendment No. 61 File No.
Document No.
Revision No.
File Classification Drawings Part 3 1364-002795-S03 19 Publicly Available Drawings Part 3 1364-003628 17 Publicly Available Drawings Part 3 1364-003630 12 Publicly Available Drawings Part 3 1364-097532 5
Publicly Available Documents DBD-1000-V02 10 Redact Drawings Part 3 1364-093034 4
Publicly Available Documents PLP-106 69 Publicly Available Documents PLP-114 28 Publicly Available Documents DUKE-QAPD-001-A 43 Publicly Available Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 10 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_02_Figures Figure 2.1.2-1 Chapter_02_Figures Figure 2.4.1-2 Chapter_02_Figures Figure 2.4.2-5 Chapter_02_Figures Figure 2.5.3-4 Chapter_02_Figures Figure 2.5.3-11 Chapter _02_Figures Figure 2.5.6-16 Chapter_02_Figures Figure 2.5.6-18 Chapter_02_Figures Figure 2.5.6-19 Chapter_02_Figures Figure 2.5.6-20 Chapter_02_Figures Figure 2.5.6-21 Chapter_02_Figures Figure 2.5.6-22 Chapter_02_Figures Figure 2.5.6-23 Chapter _02_Figures Figure 2.5.6-24 Chapter_02_Figures Figure 2.5.6-25 Chapter_ 02_Figures Figure 2.5.6-27 Chapter_02_Figures Figure 2.5K-1 Chapter_ 03 _Figures Figure 3.4.1-2 Chapter_ 03 _Figures Figure 3.4.1-3 Chapter_ 03 _Figures Figure 3.4.1-4 Chapter_03_Figures Figure 3.4.1-6 Chapter_03_Figures Figure 3.4.1-7 Chapter_03_Figures Figure 3.4.1-8 Chapter_03_Figures Figure 3.4.1-9 Chapter_ 03 _Figures Figure 3.4.1-10 Sheet 1 Chapter_03_Figures Figure 3.4.1-10 Sheet 2 Chapter_ 03 _Figures Figure 3.4.1 -11 Sheet 1 Chapter_03_Figures Figure 3.4.1-11 Sheet 2 Chapter_ 03 _Figures Figure 3.4. 1-12 Sheet 1 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 11 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_03_Figures Figure 3.4.1-12 Sheet 2 Chapter_03_Figures Figure 3.4.1-13 Chapter_03_Figures Figure 3.4.1-14 Chapter_ 03 _Figures Figure 3.4.1-15 Chapter_03_Figures Figure 3.4.1-16 Chapter_ 03 _Figures Figure 3.5.1-01 Chapter_03_Figures Figure 3.5.1-03 Chapter_03_Figures Figure 3.6A-15 Chapter_ 03 _Figures Figure 3.6A-29 Chapter_ 03 _Figures Figure 3.6A-30 Chapter_03_Figures Figure 3.6A-31 Chapter_ 03 _Figures Figure 3.6A-32 Chapter_03_Figures Figure 3.6A-32.1 Chapter_03_Figures Figure 3.6A-32.2 Chapter_03_Figures Figure 3.6A-33.1 Chapter_03_Figures Figure 3.8.1-1 Chapter_03_Figures Figure 3.8.1-2 Chapter_03_Figures Figure 3.8.1 -3 Chapter_03_Figures Figure 3.8.1-6 Chapter_03_Figures Figure 3.8.1-7 Chapter_ 03 _Figures Figure 3.8.1-8 Chapter_03_Figures Figure 3.8.1-9 Chapter_03_Figures Figure 3.8.1-10 Chapter _03_Figures Figure 3.8.1-11 Chapter _03_Figures Figure 3.8.1-12 Chapter_ 03 _Figures Figure 3.8.1-13 Chapter_ 03 _Figures Figure 3.8.1-14 Chapter_ 03 _Figures Figure 3.8.1-1 5 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page12of17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_ 03 _Figures Figure 3.8.1-16 Chapter_ 03 _Figures Figure 3.8.1-17 Chapter_03_Figures Figure 3.8.1-18 Chapter_03_Figures Figure 3.8.1-19 Chapter_ 03 _Figures Figure 3.8.1-20 Chapter_ 03 _Figures Figure 3.8.1-21 Chapter_ 03 _Figures Figure 3.8.1-22 Chapter_ 03 _Figures Figure 3.8.1-23 Chapter_ 03 _Figures Figure 3.8.1-24 Chapter_ 03 _Figures Figure 3.8.1-37 Chapter_ 03 _Figures Figure 3.8.1-44 Chapter_ 03 _Figures Figure 3.8.1-45 Chapter_ 03 _Figures Figure 3.8.1-46 Chapter_ 03 _Figures Figure 3.8.1-47 Chapter_ 03 _Figures Figure 3.8.1-48 Chapter_ 03 _Figures Figure 3.8.1-49 Chapter_ 03 _Figures Figure 3.8.1-50 Chapter _03_Figures Figure 3.8.2-1 Chapter_03_Figures Figure 3.8.2-2 Chapter_ 03 _Figures Figure 3.8.2-3 Chapter_ 03 _Figures Figure 3.8.3-1 Chapter_ 03 _Figures Figure 3.8.3-2 Chapter_ 03 _Figures Figure 3.8.3-3 Chapter_03_Figures Figure 3.8.3-4 Chapter_ 03 _Figures Figure 3.8.3-5 Chapter_ 03 _Figures Figure 3.8.3-6 Chapter_03_Figures Figure 3.8.3-8 Chapter_03_Figures Figure 3.8.3-9 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 13 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_03_Figures Figure 3.8.3-10 Chapter_03_Figures Figure 3.8.3-14 Chapter_ 03 _Figures Figure 3.8.3-15 Chapter _03_Figures Figure 3.8.4-2 Chapter_ 03 _Figures Figure 3.8.4-3 Chapter_03_Figures Figure 3.8.4-4 Chapter_ 03 _Figures Figure 3.8.4-5 Chapter_03_Figures Figure 3.8.4-6 Chapter_ 03 _Figures Figure 3.8.4-7 Chapter_03_Figures Figure 3.8.4-8 Chapter_03_Figures Figure 3.8.4-9 Chapter_03_Figures Figure 3.8.4-10 Chapter_03_Figures Figure 3.8.4-11 Chapter_03_Figures Figure 3.8.4-12 Chapter_03_Figures Figure 3.8.4-13 Chapter_03_Figures Figure 3.8.4-14 Chapter_03_Figures Figure 3.8.4-15 Chapter_03_Figures Figure 3.8.4-16 Chapter_03_Figures Figure 3.8.4-17 Chapter_ 03 _Figures Figure 3.8.4-18 Chapter_03_Figures Figure 3.8.4-19 Chapter_ 03 _Figures Figure 3.8.4-20 Chapter_ 03 _Figures Figure 3.8.4-21 Chapter_ 03 _Figures Figure 3.8.4-22 Chapter_ 03 _Figures Figure 3.8.4-33 Chapter_03_Figures Figure 3.8.4-40 Chapter_ 03 _Figures Figure 3.8.4-42 Chapter_03_Figures Figure 3.8.4-45 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 14 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_03_Figures Figure 3.8.5-2 Chapter_03_Figures Figure 3.8.5-5 Chapter_ 03 _Figures Figure 3.8.5-6 Chapter_03_Figures Figure 3.8.5-7 Chapter_ 06 _Figures Figure 6.2.1-18 Chapter_06_Figures Figure 6.2.1-19 Chapter_ 06 _Figures Figure 6.2.1-20 Chapter_06_Figures Figure 6.2.2-8 Chapter_06_Figures Figure 6.2.2-9 Chapter_ 09 _Figures Figure 9.1.4-7 Chapter_09_Figures Figure 9.1.4-8 Chapter_09_Figures Figure 9.1.4-9 Chapter_ 09 _Figures Figure 9.1.4-10 Chapter_09_Figures Figure 9.1.4-11 Chapter_09_Figures Figure 9.1.4-12 Chapter_09_Figures Figure 9.2.6-1 Chapter_ 09 _Figures Figure 9.2.8-2 Chapter_09_Figures Figure 9.3.4-5 Chapter_ 09 _Figures Figure 9.4.0-2 Chapter_ 12_Figures Figure 12.3.2-02 Chapter_ 12_Figures Figure 12.3.2-03 Chapter_ 12_Figures Figure 12.3.2-04 Chapter_ 12_Figures Figure 12.3.2-05 Chapter_ 12_Figures Figure 12.3.2-06 Chapter_ 12_Figures Figure 12.3.2-07 Chapter_ 12_Figures Figure 12.3.2-08 Chapter_ 12_Figures Figure 12.3.2-09 Chapter_ 12_Figures Figure 12.3.2-10 Warning : Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 15 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Table 3: FSAR Figures Flagged for Redaction FSAR Chapter Figure Being Redacted Chapter_ 12_Figures Figure 12.3.2-11 Chapter_ 12_Figures Figure 12.3.2-12 Chapter_ 12_Figures Figure 12.3.2-13 Chapter_ 12_Figures Figure 12.3.2-14 Chapter_ 12_Figures Figure 12.3.2-15 Chapter_ 12_Figures Figure 12.3.2-16 Chapter_ 12_Figures Figure 12.3.2-17 Chapter_ 12_Figures Figure 12.3A-2 Chapter_ 12_Figures Figure 12.3A-3 Chapter_ 12_Figures Figure 12.3A-4 Chapter_ 12_Figures Figure 12.3A-5 Chapter_ 12_Figures Figure 12.3A-6 Chapter_ 12_Figures Figure 12.3A-7 Chapter_ 12_Figures Figure 12.3A-8 Chapter_ 12_Figures Figure 12.3A-9 Chapter_ 12_Figures Figure 12.3A-10 Chapter_ 12_Figures Figure 12.3A-11 Chapter_ 12_Figures Figure 12.3A-12 Chapter_ 12_Figures Figure 12.3A-13 Chapter_ 12_Figures Figure 12.3A-14 Chapter_ 12_Figures Figure 12.3A-15 Chapter_ 12_Figures Figure 12.3A-16 Chapter_ 12_Figures Figure 12.3A-17 Chapter_ 12_Figures Figure 12.3A-18 Chapter_ 12_Figures Figure 12.3A-19 Chapter_ 12_Figures Figure 12.3A-20 Chapter_ 12_Figures Figure 12.3A-21 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1 ). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 16 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 The contact person for the information provided on the enclosed CD-ROMs is provided below:
Contact Name Mailing Address E-Mail Address Phone Number Art Zaremba Duke Energy Corporation 526 South Church Street - EC07C Charlotte, North Carolina 28202 Arthur.Zaremba@duke-energy.com 980-373-2062 Warning: Enclosure 1 contains Security-Related Information and must be protected per 10 CFR 2.390(d)(1). When separated from Enclosure 1, this transmittal document is decontrolled.
Page 17 of 17
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 FSAR Amendment No. 62 CD-ROM "Harris Nuclear Plant Amendment 62 Submittal" (Non-redacted Version) 1 CD-ROM This CD also contains all documents incorporated by reference.
This CD-ROM contains material to be withheld from public release per 10 CFR 2.390(d)(1).
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM ENCLOSURE 1, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED Document Control Desk Serial: RA-19-0160 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 FSAR Amendment No. 62 CD-ROM "Harris Nuclear Plant Amendment 62 Submittal, Redacted Version" 1 CD-ROM This CD-ROM may be proactively released to the public.