Provide Comments on NRCs Draft Radioactive Effluent Report During 1976
ML19093B344
Person / Time
Site: Surry  
(DPR-032, DPR-037)
Issue date: 09/16/1977
From: Stallings C
Virginia Electric & Power Co (VEPCO)
To: Reid R
Office of Nuclear Reactor Regulation
References
Download: ML19093B344 (2)


Text

..

e VIRGINIA ELECTRIC AND POWER COMPANY RIOHMOND, VIRGINIA 23261 Mr. Robert W. Reid, Chief Nuclear Reactor Regulation September 16; 1977,

U. S. Nuclear Regulatory Commission Office of Management Information and Program Control Operating Data Branch, 12105 MNBB Washington, D. C.

20555

Dear Mr. Reid:

.. f:J I I Serial J:il"o. 385/082677 PO&M/WWC:das Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 The draft copy of the NRC's radioactive effluent report for the Surry Power Station during 1976 has been reviewed and my comments are as follows:

A. Suiiimary of Effluents - Airborne

1. "Total Halogens (including I-131)" should be 5.44E-01 curies since I-134 was not included.

If the 5.29E-01 curies number is used, it is suggested that "Airborne C)" be changed to read "Total Halogens

( excluding I-134)".

2. "Total Particulates" is reported as. 8. 14K-02 curies and is correct but does not include Rb-88 or Cs-138 due to their short half-lives.

It is suggested that "Airborne. D)" be changed to read "Total Parti-culates (excluding Rb-88 and Cs-138)".

3. The "Total Tritium" is not.3.03E+02 curies but 3.72E+2 curies.

The discrepancy results from an apparent calculational error (misread-ing exponential sign) *

. B. Airborne Effluents - Isotopic Breakdown

.. 1. Remove I-134 from the "Particulates" column and include under the "Halogens" column.

2. Change H-3 from 3. 03E+02 to 3. 72E+02 to reflect A-3 above.

Also please note that the C-14 number as.reported for liquid effluents re-sults from a quarterly composit14sample analysis for 14co2 by a vendor.

The quarterly composite result for COz is then prorated on a monthly basis and report-ed as C-14..

e

  • 'VI~GINIA ELECTRIC AND POWER COMPANY TO

~r. Robert W. Reid -

Page No. 2 If clarification of the above comments are necessary, please contact W. Wayne Cameron at 804/771-,4301.

cc:

J.l:1r. James P. 0 'Reilly Very truly yours,

~.JiJ, xflevec/,1~

C. M. Stallings Vice President-Power Supply and Production Operations