NRR E-mail Capture - Fyi - Estimate Update - Pilgrim EP Exemption
ML19036A653
Person / Time
Site: Pilgrim
Issue date: 02/04/2019
From: John Lamb
Special Projects and Process Branch
To: Miner P
Entergy Nuclear Operations
References
L-2018-LLE-0011
Download: ML19036A653 (2)


Text

NRR-DMPSPEm Resource From: Lamb, John Sent: Monday, February 4, 2019 5:08 PM To: Miner, Peter Cc: Byrne, Robert M; Powers, Michael J; Couture III, Philip; Halter, Mandy

Subject:

FYI - Estimate Update - Pilgrim EP Exemption (EPID: L-2018-LLE-0011)

Importance: High

Dear Mr. Miner:

By letter dated July 3, 2018 (Agencywide Documents Access and Management System Accession No. ML18186A635), Entergy Nuclear Operations, Inc. submitted an exemption request for Pilgrim Nuclear Power Station (Pilgrim). The requested exemptions would allow Pilgrim to reduce emergency planning requirements consistent with the anticipated permanently defueled condition of the station. By e-mail dated July 25, 2018 (ADAMS Accession No. ML18206A788), the U.S. Nuclear Regulatory Commission (NRC) staff accepted this exemption request to review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

Based on the information provided in your submittal, the NRC staff estimated that this licensing request would take approximately 368 hours15.333 days <br />2.19 weeks <br />0.504 months <br /> to complete, and the NRC staff expected to complete this review in approximately 11 months, which was June 2019.

Based on the second round request for additional information regarding the adiabatic heat-up calculation, the NRC staff estimates that this licensing action will take approximately 450 hours18.75 days <br />2.679 weeks <br />0.616 months <br />, and the NRC staff expects to complete this review in September 2019.

If you have any questions, please contact me at 301-415-3100 or via e-mail at John.Lamb@nrc.gov.

Sincerely, John G. Lamb, Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293 1

Hearing Identifier: NRR_DMPS Email Number: 788 Mail Envelope Properties (John.Lamb@nrc.gov20190204170800)

Subject:

FYI - Estimate Update - Pilgrim EP Exemption (EPID: L-2018-LLE-0011)

Sent Date: 2/4/2019 5:08:11 PM Received Date: 2/4/2019 5:08:00 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:

"Byrne, Robert M" <rbyrne@entergy.com>

Tracking Status: None "Powers, Michael J" <mpower1@entergy.com>

Tracking Status: None "Couture III, Philip" <pcoutur@entergy.com>

Tracking Status: None "Halter, Mandy" <mhalter@entergy.com>

Tracking Status: None "Miner, Peter" <pminer@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1548 2/4/2019 5:08:00 PM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: